2/16/2024 4:40:31 PM
|
Project Closed
|
2/16/2024 4:40:31 PM
|
Project Approved: 2/16/2024
|
2/16/2024 4:18:22 PM
|
Request for Review Comments returned by EPC Health Department
|
2/15/2024 2:06:36 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
2/1/2024 8:03:13 AM
|
Request for Review Comments sent for Project Bradley Point Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
2/1/2024 8:02:32 AM
|
Submission Triaged
|
1/31/2024 7:11:52 PM
|
Submission received from Applicant
|
1/31/2024 11:56:30 AM
|
Submission request sent to Applicant
|
1/25/2024 2:19:39 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/11/2024 2:58:47 PM
|
Request for Review Comments sent for Project Bradley Point Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
1/11/2024 10:55:52 AM
|
Submission Triaged
|
1/11/2024 10:30:46 AM
|
Submission received from Applicant
|
1/9/2024 3:09:56 PM
|
Submission request sent to Applicant
|
1/4/2024 3:21:05 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/20/2023 10:09:03 AM
|
Request for Review Comments sent for Project Bradley Point Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
11/30/2023 3:31:05 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/30/2023 3:30:11 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/30/2023 3:25:34 PM
|
Request for Review Comments returned by PCD Engineering Division
|
11/16/2023 3:42:02 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
|
11/16/2023 3:41:59 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
11/16/2023 3:41:57 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
|
11/16/2023 3:41:54 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
|
11/16/2023 3:41:51 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Lupe Packman on behalf of PCD Engineering Division
|
11/16/2023 3:41:47 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/16/2023 3:41:45 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/16/2023 3:41:43 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Edward Schoenheit on behalf of PCD Engineering Division
|
11/16/2023 3:41:41 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
|
11/16/2023 3:41:39 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Charlene Durham on behalf of PCD Engineering Division
|
11/16/2023 3:41:37 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
11/16/2023 3:39:29 PM
|
Submission Triaged
|
11/16/2023 1:37:51 PM
|
Submission received from Applicant
|
11/16/2023 1:14:56 PM
|
Submission request sent to Applicant
|
11/16/2023 1:14:28 PM
|
Submission Triaged
|
11/16/2023 12:08:08 PM
|
Submission received from Applicant
|
10/5/2023 10:29:27 AM
|
Submission request sent to Applicant
|
10/4/2023 3:59:33 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/4/2023 3:49:00 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/27/2023 9:30:25 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/27/2023 8:12:07 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/13/2023 3:03:47 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
9/13/2023 3:03:46 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Stormwater Engineer Reviewer Christina Prete on behalf of EPC Stormwater Review
|
9/13/2023 3:03:43 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by EHS Mike McCarthy on behalf of EPC Health Department
|
9/13/2023 3:03:39 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Ryan Howser on behalf of PCD Project Manager
|
9/13/2023 3:03:36 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
|
9/13/2023 3:03:35 PM
|
Request for Review Comments email sent for Project Bradley Point Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
|
9/13/2023 3:01:28 PM
|
Submission Triaged
|
9/6/2023 6:29:47 PM
|
Submission received from Applicant
|
9/1/2023 2:35:21 PM
|
Submission request sent to Applicant
|
8/22/2023 10:47:33 AM
|
Submission request sent to Applicant
|
6/23/2023 11:09:17 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
6/15/2023 5:30:01 PM
|
Submission request sent to Applicant
|
6/15/2023 4:43:42 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/15/2023 4:15:28 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/9/2023 2:59:04 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/9/2023 2:53:10 PM
|
Request for Review Comments email resent for Project South 85/87 Minor Subdivision for review by Ryan Howser on behalf of PCD Project Manager
|
6/9/2023 2:49:36 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
6/9/2023 10:08:46 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/19/2023 4:52:24 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Stormwater Engineer Reviewer Christina Prete on behalf of EPC Stormwater Review
|
5/19/2023 4:52:20 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Ryan Howser on behalf of PCD Project Manager
|
5/19/2023 4:52:18 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/19/2023 4:50:42 PM
|
Submission Triaged
|
5/19/2023 4:40:42 PM
|
Submission received from Applicant
|
5/11/2023 8:06:12 AM
|
Submission request sent to Applicant
|
2/7/2023 4:14:17 PM
|
Submission request sent to Applicant
|
2/7/2023 4:13:27 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/6/2023 11:03:41 AM
|
Request for Review Comments returned by PCD Engineering Division
|
2/6/2023 9:53:10 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/17/2023 11:25:51 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/29/2022 3:52:04 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/29/2022 3:52:03 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Stormwater Engineer Reviewer Christina Prete on behalf of EPC Stormwater Review
|
12/29/2022 3:51:58 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by EHS Mike McCarthy on behalf of EPC Health Department
|
12/29/2022 3:51:54 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Ryan Howser on behalf of PCD Project Manager
|
12/29/2022 3:51:52 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/29/2022 1:02:01 PM
|
Submission Triaged
|
12/29/2022 10:50:29 AM
|
Submission received from Applicant
|
12/29/2022 8:56:39 AM
|
Submission request sent to Applicant
|
12/29/2022 8:55:48 AM
|
Submission Triaged
|
12/28/2022 7:40:48 PM
|
Submission received from Applicant
|
10/19/2022 4:39:57 PM
|
Submission request sent to Applicant
|
10/19/2022 2:56:56 PM
|
Submission request sent to Applicant
|
9/27/2022 2:35:54 PM
|
Submission request sent to Applicant
|
9/27/2022 2:34:13 PM
|
Submission request sent to Applicant
|
7/15/2021 10:14:35 AM
|
Submission request sent to Applicant
|
6/29/2021 11:58:22 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/29/2021 11:56:43 AM
|
Request for Review Comments email resent for Project South 85/87 Minor Subdivision for review by Ryan Howser on behalf of PCD Project Manager
|
6/28/2021 10:08:49 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/27/2021 7:44:46 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/24/2021 4:45:09 PM
|
Request for Review Comments returned by PCD Project Manager
|
6/24/2021 2:45:00 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/24/2021 11:34:39 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
6/11/2021 7:30:30 AM
|
Request for Review Comments returned by County Attorney - Water
|
6/8/2021 9:42:38 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/3/2021 7:06:55 AM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
6/3/2021 7:06:52 AM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
6/3/2021 7:06:50 AM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Stormwater Engineer Reviewer Christina Furchak on behalf of EPC Stormwater Review
|
6/3/2021 7:06:48 AM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
6/3/2021 7:06:46 AM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
6/3/2021 7:06:44 AM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Ryan Howser on behalf of PCD Project Manager
|
6/3/2021 7:06:39 AM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
6/2/2021 5:28:25 PM
|
Submission Triaged
|
6/2/2021 5:05:23 PM
|
Submission received from Applicant
|
4/15/2021 7:47:41 AM
|
Submission request sent to Applicant
|
4/7/2021 10:26:06 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/7/2021 10:14:48 AM
|
Request for Review Comments email resent for Project South 85/87 Minor Subdivision for review by Ryan Howser on behalf of PCD Project Manager
|
4/7/2021 9:31:30 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/6/2021 6:00:21 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/6/2021 9:04:36 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
4/2/2021 4:34:06 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Stormwater Engineer Reviewer Christina Furchak on behalf of EPC Stormwater Review
|
3/31/2021 5:24:56 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/30/2021 9:37:21 AM
|
Request for Review Comments returned by Parks Advisory Board
|
3/30/2021 9:36:18 AM
|
Request for Review Comments returned by EPC Parks Department
|
3/26/2021 11:42:09 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/23/2021 10:12:39 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/23/2021 9:43:31 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/22/2021 10:27:52 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
3/17/2021 9:40:46 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/17/2021 7:38:25 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
3/15/2021 12:48:02 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/9/2021 7:28:25 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
3/5/2021 12:15:10 PM
|
Request for Review Comments returned by EPC Environmental Services
|
3/3/2021 4:12:10 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/3/2021 3:53:32 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by COO Dave Gish on behalf of Widefield SD 3
|
3/3/2021 3:53:30 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
3/3/2021 3:53:28 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Roy Heald on behalf of Security Water & Sanitation District
|
3/3/2021 3:53:26 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by on behalf of Security Fire Protection District
|
3/3/2021 3:53:24 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
3/3/2021 3:53:22 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
3/3/2021 3:53:19 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Meggan Herington on behalf of Colorado Springs Planning & Community Development
|
3/3/2021 3:53:16 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/3/2021 3:53:13 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/3/2021 3:53:11 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Kimberly Berscheid on behalf of Colorado Parks and Wildlife
|
3/3/2021 3:53:07 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/3/2021 3:53:05 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/3/2021 3:53:02 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
3/3/2021 3:52:55 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by on behalf of Parks Advisory Board
|
3/3/2021 3:52:53 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
3/3/2021 3:52:50 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by on behalf of EPC Parks Department
|
3/3/2021 3:52:48 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Catherine McGarvy on behalf of EPC Health Department
|
3/3/2021 3:52:40 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/3/2021 3:52:38 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Edi Anderson on behalf of County Attorney - Water
|
3/3/2021 3:52:36 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Lori Seago on behalf of County Attorney - Development Review
|
3/3/2021 3:52:34 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Ryan Howser on behalf of PCD Project Manager
|
3/3/2021 3:52:32 PM
|
Request for Review Comments email sent for Project South 85/87 Minor Subdivision for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/3/2021 2:58:41 PM
|
Fees paid: 3/3/2021 (Receipt: 1004033)
|
2/24/2021 8:48:32 AM
|
Payment Request sent: 2/24/2021
|
2/24/2021 8:48:32 AM
|
File # Assigned: MS212
|
2/24/2021 8:48:23 AM
|
Submission Triaged
|
2/24/2021 8:26:01 AM
|
Submission received from Applicant
|
2/8/2021 8:40:27 PM
|
Submission request sent to Applicant
|
2/8/2021 8:40:15 PM
|
Submission Triaged
|
2/8/2021 8:32:11 PM
|
Project Manager Assigned: Ryan Howser
|
2/8/2021 1:57:38 PM
|
Submission received from Applicant
|
1/4/2021 2:51:14 PM
|
Submission request sent to Applicant
|
1/4/2021 2:49:43 PM
|
Project Manager Assigned: Nina Ruiz
|
1/4/2021 2:49:43 PM
|
EA Assigned: EA20100
|
1/4/2021 2:49:43 PM
|
Project Created
|