6/23/2025 11:32:58 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
6/17/2025 10:38:29 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
6/10/2025 2:38:29 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
6/3/2025 3:54:50 PM
|
Submission request sent to Applicant
|
6/3/2025 3:43:45 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/30/2025 7:18:07 AM
|
Project Manager Assigned: Miranda Benson
|
5/30/2025 6:41:26 AM
|
Request for Review Comments returned by Falcon School District 49
|
5/29/2025 1:27:33 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
5/28/2025 4:17:03 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/28/2025 4:04:12 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/23/2025 2:20:23 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/22/2025 3:56:44 PM
|
Project Manager Assigned: Ashlyn Mathy
|
5/22/2025 3:26:35 PM
|
Project Manager Assigned: Miranda Benson
|
5/21/2025 1:36:29 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
5/21/2025 9:13:32 AM
|
Request for Review Comments returned by Meadow Lake Airport Association
|
5/20/2025 11:06:56 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/19/2025 10:42:17 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
5/14/2025 9:46:10 AM
|
Request for Review Comments returned by RBD Floodplain
|
5/14/2025 8:43:10 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
5/14/2025 8:43:09 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
5/14/2025 8:43:08 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by April Willie on behalf of County Attorney - Development Review
|
5/14/2025 8:42:56 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
|
5/14/2025 8:42:54 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
5/14/2025 8:42:53 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
|
5/14/2025 8:42:52 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Evelyn galanephillips on behalf of Falcon School District 49
|
5/14/2025 8:42:51 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
|
5/14/2025 8:42:50 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Curtis Kauffman on behalf of Falcon Fire Protection District
|
5/14/2025 8:42:49 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Harry Thomas on behalf of El Paso County Conservation Dist
|
5/14/2025 8:42:48 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Oliver Watkins on behalf of El Paso County Conservation Dist
|
5/14/2025 8:42:47 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Katie Miller on behalf of El Paso County Conservation Dist
|
5/14/2025 8:42:46 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Erica Carter on behalf of El Paso County Conservation Dist
|
5/14/2025 8:42:45 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by on behalf of El Paso County Conservation Dist
|
5/14/2025 8:42:44 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
5/14/2025 8:42:43 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Cassie Olgren on behalf of El Paso County Conservation Dist
|
5/14/2025 8:42:42 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Billy Richard on behalf of El Paso County Conservation Dist
|
5/14/2025 8:42:40 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
5/14/2025 8:42:39 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
5/14/2025 8:42:38 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
5/14/2025 8:42:37 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
5/14/2025 8:42:36 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
5/14/2025 8:42:35 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
|
5/14/2025 8:42:34 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by on behalf of Pikes Peak Regional Building Department
|
5/14/2025 8:42:33 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
5/14/2025 8:42:32 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
5/14/2025 8:42:30 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
5/14/2025 8:42:29 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
5/14/2025 8:42:29 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
5/14/2025 8:42:27 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
5/14/2025 8:42:26 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
5/14/2025 8:42:25 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
5/14/2025 8:42:24 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Peter Chapman on behalf of Colorado Parks and Wildlife
|
5/14/2025 8:42:23 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
5/14/2025 8:42:22 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
5/14/2025 8:42:20 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
5/14/2025 8:42:19 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
5/14/2025 8:42:17 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
5/14/2025 8:42:16 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by on behalf of Parks Advisory Board
|
5/14/2025 8:42:15 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Zachary Jannusch on behalf of EPC Stormwater Review
|
5/14/2025 8:42:14 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
5/14/2025 8:42:13 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
5/14/2025 8:42:12 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
5/14/2025 8:42:11 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department
|
5/14/2025 8:42:10 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
5/14/2025 8:42:09 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
5/14/2025 8:42:08 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
5/14/2025 8:42:04 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/14/2025 8:42:03 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
5/14/2025 8:39:53 AM
|
Submission Triaged
|
5/14/2025 8:16:03 AM
|
Submission received from Applicant
|
5/8/2025 2:38:09 PM
|
Submission request sent to Applicant
|
5/7/2025 1:24:56 PM
|
Submission request sent to Applicant
|
12/19/2024 10:30:18 AM
|
Request for Review Comments returned by RBD Floodplain
|
12/19/2024 10:11:11 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
|
1/17/2024 11:29:51 AM
|
Request for Review Comments returned by Falcon School District 49
|
1/16/2024 4:52:55 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/9/2024 12:26:03 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
1/9/2024 12:25:33 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
1/4/2024 12:45:46 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
1/3/2024 2:59:46 PM
|
Submission request sent to Applicant
|
12/29/2023 4:09:03 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/28/2023 2:01:01 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/28/2023 9:09:46 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/27/2023 9:35:58 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/26/2023 11:09:34 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/26/2023 11:08:53 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/26/2023 9:07:57 AM
|
Request for Review Comments returned by Parks Advisory Board
|
12/25/2023 9:12:27 AM
|
Request for Review Comments returned by Meadow Lake Airport Association
|
12/25/2023 9:11:19 AM
|
Request for Review Comments returned by Meadow Lake Airport Association
|
12/18/2023 8:41:25 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
12/18/2023 8:39:51 AM
|
Request for Review Comments returned by Falcon Fire Protection District
|
12/15/2023 10:13:51 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/13/2023 10:41:28 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/12/2023 9:25:04 AM
|
Request for Review Comments returned by RBD Floodplain
|
12/12/2023 8:52:25 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
|
12/12/2023 8:52:23 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
12/12/2023 8:52:20 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
|
12/12/2023 8:52:18 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Evelyn galanephillips on behalf of Falcon School District 49
|
12/12/2023 8:52:16 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
|
12/12/2023 8:52:14 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
12/12/2023 8:52:12 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
12/12/2023 8:52:10 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
12/12/2023 8:52:08 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
12/12/2023 8:52:05 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/12/2023 8:52:03 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Keith Curtis on behalf of RBD Floodplain
|
12/12/2023 8:52:01 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by on behalf of Pikes Peak Regional Building Department
|
12/12/2023 8:51:59 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/12/2023 8:51:57 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
12/12/2023 8:51:54 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/12/2023 8:51:52 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
12/12/2023 8:51:50 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
12/12/2023 8:51:48 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Tyson Floersheim on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:46 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:44 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:42 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Sarah Watson on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:40 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Philip Gurule on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:38 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:36 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Corey Adler on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:34 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Cassidy English on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:32 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Drew Vrbenec on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:30 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Aaron Berscheid on behalf of Colorado Parks and Wildlife
|
12/12/2023 8:51:28 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
12/12/2023 8:51:25 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
12/12/2023 8:51:23 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
12/12/2023 8:51:21 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
12/12/2023 8:51:19 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by on behalf of Parks Advisory Board
|
12/12/2023 8:51:16 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
12/12/2023 8:51:14 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
12/12/2023 8:51:12 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
12/12/2023 8:51:10 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Mike McCarthy on behalf of EPC Health Department
|
12/12/2023 8:51:08 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
12/12/2023 8:51:06 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
12/12/2023 8:51:04 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by deric clemons on behalf of Natural Resources Conservation Service (Federal Agency)
|
12/12/2023 8:51:02 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Lupe Packman on behalf of PCD Engineering Division
|
12/12/2023 8:51:01 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
12/12/2023 8:50:59 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
|
12/12/2023 8:50:59 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/12/2023 8:50:57 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/12/2023 8:50:57 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
|
12/12/2023 8:50:54 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Edward Schoenheit on behalf of PCD Engineering Division
|
12/12/2023 8:50:53 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
12/12/2023 8:50:50 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
12/12/2023 8:50:50 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
12/12/2023 8:50:48 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
12/12/2023 8:50:48 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Charlene Durham on behalf of PCD Engineering Division
|
12/12/2023 8:50:45 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
12/12/2023 8:50:45 AM
|
Request for Review Comments email sent for Project 4-Way Commercial Site Development Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
12/5/2023 3:53:20 PM
|
Fees paid: 12/5/2023 (Receipt: 1008581)
|
12/5/2023 11:26:50 AM
|
Project Manager Assigned: Ashlyn Mathy
|
12/5/2023 11:20:51 AM
|
Payment Request sent: 12/5/2023
|
12/5/2023 11:20:51 AM
|
File # Assigned: PPR2347
|
12/5/2023 11:20:41 AM
|
Submission Triaged
|
12/5/2023 9:22:01 AM
|
Submission received from Applicant
|
12/5/2023 8:16:16 AM
|
Submission request sent to Applicant
|
12/1/2023 4:05:08 PM
|
Submission request sent to Applicant
|
12/1/2023 4:04:55 PM
|
Submission Triaged
|
12/1/2023 10:29:46 AM
|
Submission received from Applicant
|
11/8/2023 12:44:29 PM
|
Submission request sent to Applicant
|
2/8/2023 7:38:29 AM
|
Submission request sent to Applicant
|
2/3/2023 10:48:11 AM
|
Project Manager Assigned: Ryan Howser
|
2/3/2023 10:48:11 AM
|
EA Assigned: EA22107
|
2/3/2023 10:48:11 AM
|
Project Created
|