Project Review Comments
- File Number
- AASI262
- Project Name
- Cherokee MD PFAS Treatment Plant 1041
- Description
- Cherokee Metro District’s proposed new water treatment facility to treat emerging PFAS drinking water standards. Gallons – 8.6 MGD design capacity (assuming 6,000 gpm). A Approximately 15,700 sq..ft. building • PEMB (approximately 30-feet tall and 14,000 square feet). • Two (2) finished water storage tanks (approximately 25-feet tall and 105-feet in diameter). • Two (2) raw water storage tanks (approximately 25-feet tall and 60-feet in diameter). Two raw water connections will be installed including 85 feet of 16-inch pipeline, 85 feet of 24-inch pipeline, and approximately 140 feet of 30-inch pipeline to connect the raw water pipelines to the WTF. Approximately 2 miles of 30-inch finished water piping from the WTF will connect to the existing transmission pipeline and approximately 5 miles of 8-inch finished water pipeline will connect to Ellicott Springs. Population to be served if new or existing – Unchanged (approximately 29,000)
- Parcels
- 2400000270 2400000270 2400000310 2400000310
- Applicant
-
Cherokee Metro District
Brian.Gaddie@AE2S.com ( Brian.Gaddie@AE2S.com ) Brian.Gaddie@AE2S.com ( Brian.Gaddie@AE2S.com ) - File Number
- AASI262
- Project Manager
- Kari Parsons
- Status
- Active
- Created
- 4/1/2026 10:52:10 AM
View: Project Documents | Submit/View Public Comment
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
PCD Administrative Notice
11/17/2026 1:33:09 PM |
1 | On 11/17/2026, PCD mailed "Notice of Administrative Determination" letters for AASI262 to surrounding property owners within a 500-foot range (13 addresses). The potential date an administrative decision can be made is 12/01/2026. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $10.14. JM | 11/17/2026 1:33:09 PM | |
| View |
PCD Engineering Division
11/12/2026 4:02:37 PM |
1 | Letter of Intent | 11/12/2026 4:02:37 PM |
| View |
PCD Engineering Division
11/12/2026 4:02:08 PM |
1 | Haul route plan | 11/12/2026 4:02:08 PM |
| View |
PCD Engineering Division
11/12/2026 3:56:06 PM |
1 | Drainage Report - Preliminary | 11/12/2026 3:56:06 PM |
|
EPC Stormwater Review
11/12/2026 10:54:13 AM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document (to be uploaded by the Project Manager): - Preliminary Drainage Report Reviewed by: Mikayla Hartford, P.E. Senior Engineer - Stormwater 719.339.5053 MikaylaHartford@elpasoco.com |
11/12/2026 10:54:13 AM | |
| View |
PCD Engineering Division
11/12/2026 10:44:10 AM |
1 | Example Haul Route Agreement | 11/12/2026 10:44:10 AM |
|
PCD Engineering Division
11/12/2026 3:53:59 PM |
1 |
DPW Engineering review 1 has comments on the following documents - Drainage Report - Preliminary - Haul Route Plan - Letter of Intent Developer will need to submit a haul route agreement with the next submittal. Please see the attached document for reference. Review by: Bret Dilts, PE bretdilts@elpasoco.com 719-520-6864 |
11/12/2026 3:53:59 PM | |
| View |
Colorado Geological Survey
11/12/2026 9:44:52 AM |
1 | 11/12/2026 9:44:52 AM | |
|
PCD Project Manager
11/12/2026 9:18:55 AM |
1 | Please note: Ellicott Fire is a sign-off agency for a future building permit. The District provided comments; staff can defer the resolution of the comments to a site development plan to prevent any delays of the 1041 approval, if needed. | 11/12/2026 9:18:55 AM | |
|
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/12/2026 8:32:50 AM |
1 | Project is outside of Colorado Springs Utilities water, wastewater, gas, and electric service area. CSU has no comments. | 11/12/2026 8:32:50 AM | |
|
Ellicott Fire Protection District
11/11/2026 4:54:44 PM |
1 |
The wildfire plan is not specific to the this structure. Ellicott Fire Protection District will not entertain altering the state WRC map. Provide site specific wildfire plan. Provide the source and amount of water for fire protection. Will additional resources be provided to handle hazardous chemicals stored on site? Ellicott Fire Protection District efpdplanreview@gmail.com 719-669-9037 |
11/11/2026 4:54:44 PM | |
|
Mountain View Electric Association, Inc.
11/10/2026 3:39:45 PM |
1 | MVEA will work with the developer for the electric design as needed. | 11/10/2026 3:39:45 PM | |
|
Black Hills Energy-Aquila
11/10/2026 2:57:52 PM |
1 | BHE will serve. Please call in locates before excavation. Facilities in area. | 11/10/2026 2:57:52 PM | |
|
PCD Project Manager
11/10/2026 8:03:43 AM |
1 | Please send notice to the mineral right owners that the application is on track for administrative approval 10 days post the resubmittal. | 11/10/2026 8:03:43 AM | |
| View |
PCD Project Manager
11/12/2026 9:32:53 AM |
1 | Application- 1041 Exhibit B - Review 1 comments | 11/12/2026 9:32:53 AM |
|
PCD Project Manager
11/10/2026 12:42:58 PM |
1 | 1041 Documents Related to 4.202 Review Criteria- No Planning Comments | 11/10/2026 12:42:58 PM | |
| View |
PCD Project Manager
11/12/2026 9:32:32 AM |
1 | 1041 Documents Related to 4.201 (Items 1-6) review comments. Remove exhibits and upload to their own line item as a pdf. One pdf line item will be referenced multiple times. There is no need to upload same document repeatedly. | 11/12/2026 9:32:32 AM |
|
PCD Project Manager
11/10/2026 12:34:56 PM |
1 | 1041 Documents Related to 3.202 Review Criteria; No Planning Comments | 11/10/2026 12:34:56 PM | |
| View |
PCD Project Manager
11/10/2026 12:34:17 PM |
1 | 1041 Documents Related to 3.201 (Items 1 - 4); Please remove exhibits from the pages and upload as pdf line item. | 11/10/2026 12:34:17 PM |
| View |
PCD Project Manager
11/12/2026 9:31:34 AM |
1 | Noise Study - Review comments | 11/12/2026 9:31:34 AM |
| View |
PCD Project Manager
11/12/2026 10:31:37 AM |
1 |
1041 2.405. Review Criteria for All Applications- No Planning Comments 1041 Documents Related to 2.303 (Items 1-23) -Review Comment 1 attached |
11/12/2026 10:31:37 AM |
|
EPC Parks Department
11/6/2026 1:50:19 PM |
1 |
Thank you for the opportunity to review this application. Upon reviewing the project and site location, El Paso County Parks staff has found that there are no immediate impacts to El Paso County parks, trails, open space, or other El Paso County Parks related items. El Paso County Parks staff will not have comments regarding this project. Thank you! Ashlyn Mathy Parks Planner Park Planning Division El Paso County Parks Department ashlynmathy@elpasoco.com |
11/6/2026 1:50:19 PM | |
|
County Attorney - Development Review
11/6/2026 11:40:18 AM |
1 |
No comments from County Attorney - Development Review at this time. Haul Route Agreement may be submitted at future submittal if required by DPW. Reviewed by: Erika Keech, Sr. County Attorney, erikakeech2@elpasoco.com. |
11/6/2026 11:40:18 AM | |
| View |
EPC Environmental Services
11/2/2026 10:07:26 AM |
1 | 11/2/2026 10:07:26 AM | |
|
911 Authority - El Paso/Teller County
11/2/2026 9:47:10 AM |
1 |
No action for E911 on this submittal. Thank you. Justin |
11/2/2026 9:47:10 AM |
EDARP