Submit Public Comment

Back to Project


Project

File Number
AASI262
Project Name
Cherokee MD PFAS Treatment Plant 1041
Description
Cherokee Metro District’s proposed new water treatment facility to treat emerging PFAS drinking water standards. Gallons – 8.6 MGD design capacity (assuming 6,000 gpm). A Approximately 15,700 sq..ft. building • PEMB (approximately 30-feet tall and 14,000 square feet). • Two (2) finished water storage tanks (approximately 25-feet tall and 105-feet in diameter). • Two (2) raw water storage tanks (approximately 25-feet tall and 60-feet in diameter). Two raw water connections will be installed including 85 feet of 16-inch pipeline, 85 feet of 24-inch pipeline, and approximately 140 feet of 30-inch pipeline to connect the raw water pipelines to the WTF. Approximately 2 miles of 30-inch finished water piping from the WTF will connect to the existing transmission pipeline and approximately 5 miles of 8-inch finished water pipeline will connect to Ellicott Springs. Population to be served if new or existing – Unchanged (approximately 29,000)
Applicant
Cherokee Metro District
Project Manager
Kari Parsons
Status
Active

Public Comments

Disclaimer: El Paso County cannot verify that any comments or documents were received from a trusted source. Use caution when reviewing comments and documents and do not open any suspicious links.

The public comment section is only for comments in opposition or support of the project and not for the public to provide responses to other comments.


Add Comment

Comment by