TOWER WORK Remove: (1) Microwave DISH(ES), (1) ODU(s), (6) antenna(S), (9) RRH(s), and (3) sector frame(s) and equipment by others at 205'. Install: (3) sector mount(s), (5) mount pipe(s), (10) crossover plate kit(s), (9) antenna(S), (3) RRU(s), (2) OVP(s), and (2) 6x12 (1-1/4") hybrid cable(S). GROUND WORK Install: (1) Concrete pad(s), (1) 3 bay plinth(s), (1) equipment cabinet(s), (1) battery cabinet(s), (1) Ice bridge(s), (1) Ice canopy(ies), (1) 50KW Generator(s), (1) wave guide ladder(S), (1) 6672 BBU(s), (1) disconnect(S), (1) GPS antenna(S), (1) utility meter(s), (1) Hoffman box(es), (1) ATS/AC ILC(s), (2) LED work lamps(s), (1) GE NE-M PDF(s), (2) -48V strings of deka HT200'S (or equivalent) battery(ies), (1) BDFB(s), (1) Nokia IXRE2 router(s), (1) fiber provider NID(s), (1) fiber provider FDP(s), (1) RMX& RMB(s), (2) 4520 OVP(s), (1) DC upconverter(s), (2) fiber slack trays(s), and underground power and telco in joint trench.
Parcels
4330000001 4330000001
Applicant
Fullerton Engineering
Authorized Agent Nora Geci ( ngeci@fullerton-us.com )
(217) 636-4468
Authorized Agent Nora Geci ( ngeci@fullerton-us.com )
(217) 636-4468
File Number
TWR262
Project Manager
Lisa Elgin
Status
Active
Created
2/9/2026 2:52:53 PM

View: Project Documents



Review Comments (12)

Link Agency Review # Comment
PCD Project Manager
3/4/2026 12:53:41 PM
1 Tolling period is paused until a resubmittal is received. 3/4/2026 12:53:41 PM
View PCD Project Manager
3/4/2026 12:53:16 PM
1 See comments on Site Plan Drawing. 3/4/2026 12:53:16 PM
View PCD Project Manager
3/4/2026 12:52:37 PM
1 See comments on Letter of Intent. 3/4/2026 12:52:37 PM
View PCD Project Manager
3/4/2026 12:52:18 PM
1 See comments on Lease Agreement. 3/4/2026 12:52:18 PM
View PCD Project Manager
3/4/2026 12:51:53 PM
1 See comments on Elevation Plans. 3/4/2026 12:51:53 PM
View PCD Project Manager
3/4/2026 12:51:26 PM
1 See comments on Application. 3/4/2026 12:51:26 PM
EPC DPW Stormwater
3/3/2026 10:46:13 AM
1 EPC DPW Stormwater does not have any comments.

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
3/3/2026 10:46:13 AM
View Falcon Fire Protection District
2/27/2026 10:59:40 AM
1 2/27/2026 10:59:40 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/26/2026 3:49:27 PM
1 Action Item: Gas meter location on plan view and building elevations must be shown and labeled.

Action Item: Add note " Gas meters must be a minimum of 3-feet from doors, operable windows, or any vents or openings in walls."

Action Item: Add note “CSU Field Engineer to determine final gas meter and service line locations. Contact Field Engineering at 719-668-4985 (Gas) with any questions.”
2/26/2026 3:49:27 PM
911 Authority - El Paso/Teller County
2/19/2026 1:59:45 PM
1 No action for E911 on this submittal.
Thank you.
Justin.
2/19/2026 1:59:45 PM
EPC DPW Development Services - Engineering
2/19/2026 11:14:36 AM
1 Review 1.

Engineering has no comments on the submitted documents. The El Paso County Road Impact Fee does not apply to this application.

Project Manager: No re-review is needed.

Reviewed by:
Joe Sandstrom, EIT, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
2/19/2026 11:14:36 AM
Pikes Peak Regional Building Department
2/19/2026 9:54:52 AM
1 4490 E Blaney Road is the address to the parcel and not the address to the tower. Each carrier is required to have a separate address. The new address to Verizon is 4500 E Blaney Road. Use this address when submitting plans to Regional Building Department.
No further comment.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org