Project Review Comments

Back to List


Project Name
LOT 3 EDWARDS SUB FIL NO 1 and LOT 12 EDWARDS SUB FIL NO 4 lot line adjustment
Description
Administrative Vacation and Replat of approximately 2.2 acres conveyed from 3980 Enoch Rd (4502001006) to LOT 12 ONLY of 3695 Hare Haven Lane (4502001038) (Lots 12 & 13 combined for tax purposes). Applicant will be separating lots 12 and 13 for this process.
Location
Parcels
4502001006 4502001006 4502001038 4502001038
Applicant
Stephanie Gagnepain
Stephanie Gagnepain ( sgagnepain@elpasotel.net )
(719) 421-2588
Stephanie Gagnepain ( sgagnepain@elpasotel.net )
(719) 421-2588
File Number
VR258
Project Manager
Miranda Benson
Status
Active
Created
2/27/2025 10:46:05 AM

View: Project Documents



Review Comments (9)

Link Agency Comment
View PCD Project Manager
6/25/2025 2:38:15 PM
The attached V1_Plat Checklist was provided for additional reference of review guidelines. Green highlighting needs attention. This checklist does not need to be returned, but please feel free to use it during revisions! 6/25/2025 2:38:15 PM
View PCD Project Manager
6/25/2025 2:37:03 PM
V1_Final Plat Drawings_COMMENTS 6/25/2025 2:37:03 PM
View PCD Project Manager
6/25/2025 2:36:51 PM
V1_Letter of Intent_COMMENTS 6/25/2025 2:36:51 PM
PCD Project Manager
6/25/2025 1:31:25 PM
V1_ Planning review complete.

Revisions are requested on the following docuements:
- Letter of Intent
- Final Plat Drawings

Please note that County staff does not review for accuracy on supplied Deed(s).

An added document request for CC&R compliance will be added for V2_ submission.

Thank you,
Miranda Benson
mirandabenson2@elpasoco.com
6/25/2025 1:31:25 PM
View PCD Project Manager
6/24/2025 4:10:32 PM
V1_Closures Sheet (Survey)_COMMENTS 6/24/2025 4:10:32 PM
PCD Engineering Division
6/23/2025 1:15:03 PM
DPW Engineering Review 1 has comments on the following documents
- Closures sheets
- Final Plat Drawings

Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
6/23/2025 1:15:03 PM
EPC DPW Stormwater
6/12/2025 4:36:32 PM
Review 1: The proposed area of disturbance is less than 1 acre (in fact, zero acres), therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction.

EPC DPW Stormwater has no comments. Project Manager: no re-review necessary.

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com

Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
6/12/2025 4:36:32 PM
PCD Administrative Notice
6/10/2025 12:40:23 PM
On 06/10/2025, PCD mailed "Notice of Administrative Determination" letters for VR258 to surrounding property owners within a 500-foot range (14 addresses). The potential date an administrative decision can be made is 06/24/2025. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $9.66 JM 6/10/2025 12:40:23 PM
911 Authority - El Paso/Teller County
6/5/2025 8:05:07 AM
No action for E911 on this submittal.
Thank you.
Justin
6/5/2025 8:05:07 AM