10/9/2026 2:15:04 PM
|
Request for Review Comments returned by EPC Environmental Services
|
|
10/9/2026 10:22:03 AM
|
Request for Review Comments returned by Schriever Space Force Base
|
|
10/8/2026 9:53:11 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
|
10/8/2026 8:08:26 AM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of Double El Conservation District Northeast EPC
|
|
10/8/2026 8:08:24 AM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Michael Rigby on behalf of Energy & Carbon Management Commission
|
|
10/8/2026 8:08:23 AM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Lori Seago on behalf of County Attorney - Development Review
|
|
10/8/2026 8:08:22 AM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Erika Keech on behalf of County Attorney - Development Review
|
|
10/8/2026 8:08:21 AM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by April Willie on behalf of County Attorney - Development Review
|
|
10/7/2026 5:35:23 PM
|
Request for Review Comments returned by Meadow Lake Airport Association
|
|
10/7/2026 4:11:49 PM
|
Request for Review Comments returned by RBD Floodplain
|
|
10/7/2026 3:47:38 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Fire Marshal on behalf of Hanover Fire Protection District
|
|
10/7/2026 3:47:37 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Carl Tatum on behalf of Hanover Fire Protection District
|
|
10/7/2026 3:47:36 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
|
10/7/2026 3:47:34 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Wade Broadhead on behalf of City of Fountain
|
|
10/7/2026 3:47:33 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Brandy Williams on behalf of City of Fountain
|
|
10/7/2026 3:47:32 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Ben Sheets on behalf of City of Fountain
|
|
10/7/2026 3:47:31 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of Springs East Airport
|
|
10/7/2026 3:47:30 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Keith Curtis on behalf of RBD Floodplain
|
|
10/7/2026 3:47:29 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of Pikes Peak Regional Building Department
|
|
10/7/2026 3:47:28 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Dave Elliott on behalf of Meadow Lake Airport Association
|
|
10/7/2026 3:47:27 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by William Vogl on behalf of El Paso County Conservation Dist
|
|
10/7/2026 3:47:26 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Harry Thomas on behalf of El Paso County Conservation Dist
|
|
10/7/2026 3:47:25 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Katie Miller on behalf of El Paso County Conservation Dist
|
|
10/7/2026 3:47:24 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of El Paso County Conservation Dist
|
|
10/7/2026 3:47:23 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
|
10/7/2026 3:47:22 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
|
|
10/7/2026 3:47:21 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
|
|
10/7/2026 3:47:20 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
|
10/7/2026 3:47:19 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Amy Kelley on behalf of USAFA Base Planner
|
|
10/7/2026 3:47:18 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of USAFA Base Planner
|
|
10/7/2026 3:47:17 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
|
10/7/2026 3:47:16 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
|
10/7/2026 3:47:15 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
|
10/7/2026 3:47:14 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Daniel Delgado on behalf of US Army Corps of Engineers
|
|
10/7/2026 3:47:13 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Darren Horstmeier on behalf of Schriever Space Force Base
|
|
10/7/2026 3:47:12 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Elizabeth Dukes on behalf of Peterson Space Force Base
|
|
10/7/2026 3:47:11 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by John Sanders on behalf of Fort Carson, Directorate of Public Works, Master Planning
|
|
10/7/2026 3:47:10 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Harold Noonan on behalf of Fort Carson, Directorate of Public Works, Master Planning
|
|
10/7/2026 3:47:09 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Anthony Boyd on behalf of Fort Carson, Directorate of Public Works, Master Planning
|
|
10/7/2026 3:47:07 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Wayne "Buck" Reynolds on behalf of Federal Aviation Administration (FAA)
|
|
10/7/2026 3:47:07 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Kevin Keith on behalf of Federal Aviation Administration (FAA)
|
|
10/7/2026 3:47:06 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by John Bauer on behalf of Federal Aviation Administration (FAA)
|
|
10/7/2026 3:47:04 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Mariah Parker on behalf of Colorado State Land Board
|
|
10/7/2026 3:47:03 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Victoria Poulton on behalf of Colorado Parks and Wildlife
|
|
10/7/2026 3:47:02 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
|
10/7/2026 3:47:01 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
|
10/7/2026 3:47:00 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Peter Chapman on behalf of Colorado Parks and Wildlife
|
|
10/7/2026 3:46:59 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
|
10/7/2026 3:46:59 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
|
10/7/2026 3:46:58 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
|
10/7/2026 3:46:56 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Mike Matz on behalf of Colorado Division of Water Resources
|
|
10/7/2026 3:46:56 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Ailis Thyne on behalf of Colorado Division of Water Resources
|
|
10/7/2026 3:46:54 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
|
10/7/2026 3:46:54 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
|
10/7/2026 3:46:53 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Kimberly Blanchard on behalf of Colorado Department of Transportation - Pueblo Office
|
|
10/7/2026 3:46:52 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
|
10/7/2026 3:46:51 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of Colorado Department of Public Health and Environment
|
|
10/7/2026 3:46:50 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
|
|
10/7/2026 3:46:49 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Terry Seaman on behalf of Cheyenne Mountain Air Force Station
|
|
10/7/2026 3:46:47 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Kyle Cooper on behalf of Hanover School District 28
|
|
10/7/2026 3:46:46 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Xcel energy Review on behalf of Xcel Energy
|
|
10/7/2026 3:46:45 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Michael Diehl on behalf of Xcel Energy
|
|
10/7/2026 3:46:44 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Karl Myers on behalf of Tri-State Generation & Transmission Association, Inc.
|
|
10/7/2026 3:46:43 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Donna George on behalf of Public Service Company of Colorado dba X-cel Energy
|
|
10/7/2026 3:46:42 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Tyler Swanson on behalf of Public Service Company of Colorado dba X-cel Energy
|
|
10/7/2026 3:46:41 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
|
10/7/2026 3:46:40 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
10/7/2026 3:46:39 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
|
10/7/2026 3:46:38 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Lawrence Aragon on behalf of City of Fountain Electric
|
|
10/7/2026 3:46:37 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Heather Spainhower on behalf of City of Fountain Electric
|
|
10/7/2026 3:46:36 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Gilbert Jaime on behalf of City of Fountain Electric
|
|
10/7/2026 3:46:35 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Danelle Darnielle on behalf of City of Fountain Electric
|
|
10/7/2026 3:46:34 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Trish Riber on behalf of Black Hills Energy-Aquila
|
|
10/7/2026 3:46:33 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
|
|
10/7/2026 3:46:32 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
|
10/7/2026 3:46:31 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Meredith Nichols on behalf of Pikes Peak OEM (Office of Emergency Management)
|
|
10/7/2026 3:46:30 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Amanda Meldrum on behalf of Pikes Peak OEM (Office of Emergency Management)
|
|
10/7/2026 3:46:29 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Jeff Kramer on behalf of EPC Sheriff's Office
|
|
10/7/2026 3:46:28 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Heidi Williams on behalf of EPC Sheriff's Office
|
|
10/7/2026 3:46:27 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Lizz Floro on behalf of EPC Sheriff's Office
|
|
10/7/2026 3:46:26 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of EPC Public Works, County Engineer
|
|
10/7/2026 3:46:25 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of EPC Public Works, County Engineer
|
|
10/7/2026 3:46:24 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of EPC Parks Department
|
|
10/7/2026 3:46:23 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Catherine McGarvy on behalf of EPC Health Department
|
|
10/7/2026 3:46:22 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by HEAEH LandUse on behalf of EPC Health Department
|
|
10/7/2026 3:46:21 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Kathy Andrew on behalf of EPC Environmental Services
|
|
10/7/2026 3:46:20 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Zachary Jannusch on behalf of EPC DPW Stormwater
|
|
10/7/2026 3:46:19 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Mikayla Hartford on behalf of EPC DPW Stormwater
|
|
10/7/2026 3:46:18 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Glenn Reese on behalf of EPC DPW Stormwater
|
|
10/7/2026 3:46:17 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Erica Rylander on behalf of EPC DPW Stormwater
|
|
10/7/2026 3:46:16 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Christina Prete on behalf of EPC DPW Stormwater
|
|
10/7/2026 3:46:15 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Brad Walters on behalf of EPC DPW Development Services - Inspections
|
|
10/7/2026 3:46:14 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
|
|
10/7/2026 3:46:13 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
|
|
10/7/2026 3:46:12 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Justin Annan on behalf of E911 Authority - El Paso/Teller County
|
|
10/7/2026 3:46:11 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Glenn West on behalf of E911 Authority - El Paso/Teller County
|
|
10/7/2026 3:46:10 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of County Attorney - 1041
|
|
10/7/2026 3:46:09 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Erika Keech on behalf of County Attorney - 1041
|
|
10/7/2026 3:46:08 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of County Attorney - 1041
|
|
10/7/2026 3:46:07 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by Justin Kilgore on behalf of PCD Project Manager
|
|
10/7/2026 3:46:06 PM
|
Request for Review Comments email sent for Project Williams Creek Generating Station CSU 1041 for review by on behalf of PCD Administrative Notice
|
|
10/7/2026 11:59:00 AM
|
Fees paid: 10/7/2026 (Receipt: 1012740)
|
|
10/7/2026 7:19:32 AM
|
Payment Request sent: 10/7/2026
|
|
10/7/2026 7:19:32 AM
|
File # Assigned: AASI261
|
|
10/7/2026 7:19:29 AM
|
Submission Triaged
|
|
10/6/2026 3:13:28 PM
|
Submission received from Applicant
|
|
10/5/2026 6:34:49 AM
|
Submission request sent to Applicant
|
|
10/5/2026 6:34:21 AM
|
Submission Triaged
|
|
10/2/2026 5:40:23 PM
|
Submission received from Applicant
|
|
10/1/2026 8:04:09 AM
|
Submission request sent to Applicant
|
|
7/20/2026 10:33:56 AM
|
Submission request sent to Applicant
|
|
7/7/2026 1:57:03 PM
|
Submission request sent to Applicant
|
|
7/7/2026 8:21:37 AM
|
Submission request sent to Applicant
|
|
7/6/2026 7:57:47 AM
|
Submission request sent to Applicant
|
|
6/17/2026 5:18:58 PM
|
Submission request sent to Applicant
|
|
6/17/2026 5:11:01 PM
|
Submission request sent to Applicant
|
|
6/17/2026 1:33:59 PM
|
Submission request sent to Applicant
|
|
6/17/2026 1:16:20 PM
|
Project Manager Assigned: Kari Parsons
|
|
6/17/2026 1:16:20 PM
|
EA Assigned: EA2680
|
|
6/17/2026 1:16:20 PM
|
Project Created
|