9/18/2024 7:32:42 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
9/17/2024 3:53:06 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/17/2024 8:23:17 AM
|
Submission Triaged
|
9/16/2024 5:16:08 PM
|
Submission received from Applicant
|
9/16/2024 3:47:27 PM
|
Submission request sent to Applicant
|
9/13/2024 2:42:54 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/12/2024 5:26:49 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
9/12/2024 5:26:47 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
|
9/12/2024 5:26:04 PM
|
Submission Triaged
|
9/12/2024 4:23:42 PM
|
Submission received from Applicant
|
9/12/2024 2:39:07 PM
|
Submission request sent to Applicant
|
9/12/2024 2:38:32 PM
|
Submission request sent to Applicant
|
9/12/2024 1:45:11 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/12/2024 7:48:54 AM
|
Request for Review Comments returned by PCD Project Manager
|
9/11/2024 5:24:06 PM
|
Submission Triaged
|
9/11/2024 3:18:08 PM
|
Submission received from Applicant
|
9/11/2024 1:47:59 PM
|
Submission request sent to Applicant
|
9/11/2024 12:20:53 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/10/2024 8:14:46 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/3/2024 7:56:13 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
9/3/2024 7:56:11 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
|
9/3/2024 7:56:10 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
|
9/3/2024 7:55:26 AM
|
Submission Triaged
|
8/30/2024 11:54:35 AM
|
Submission received from Applicant
|
8/30/2024 10:15:14 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
8/29/2024 2:31:29 PM
|
Submission request sent to Applicant
|
8/29/2024 1:16:43 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/26/2024 1:11:36 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/26/2024 1:11:34 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Erika Keech on behalf of County Attorney - Development Review
|
8/26/2024 1:11:32 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
|
8/26/2024 1:06:58 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
8/26/2024 1:06:56 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
8/26/2024 1:06:54 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Zaker Alazzeh on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:52 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Rae Carlson on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:50 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Patrick Morris on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:49 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by LaShunda Simpson on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:47 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Jonathan Scherer on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:44 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joel Metzker on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:43 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joel Dagnillo on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:41 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Jeff Bailey on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:39 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Erin Powers on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:37 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by General Email on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:35 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Dana Davison on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:33 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Brian Shevock on behalf of Colorado Springs Public Works
|
8/26/2024 1:06:31 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
8/26/2024 1:06:29 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
|
8/26/2024 1:06:27 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
|
8/26/2024 1:06:25 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
8/26/2024 1:06:20 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
8/26/2024 1:06:19 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
|
8/26/2024 1:06:15 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of PCD Administrative Notice
|
8/26/2024 1:06:13 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Miranda Benson on behalf of PCD Administrative Notice
|
8/26/2024 1:03:12 PM
|
Submission Triaged
|
8/26/2024 11:58:59 AM
|
Submission received from Applicant
|
8/19/2024 3:30:23 PM
|
Submission request sent to Applicant
|
7/9/2024 4:25:46 PM
|
Submission request sent to Applicant
|
1/12/2024 12:18:32 PM
|
Request for Review Comments returned by EPC Health Department
|
12/5/2023 4:07:55 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/4/2023 4:07:55 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/4/2023 12:13:37 PM
|
Submission request sent to Applicant
|
12/4/2023 12:12:12 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/29/2023 12:48:26 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
11/28/2023 3:29:57 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/17/2023 11:22:07 AM
|
Request for Review Comments returned by Parks Advisory Board
|
11/13/2023 9:13:09 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
11/13/2023 7:42:38 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by PJ Langmaid on behalf of Black Forest Fire Protection District
|
11/13/2023 7:42:36 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Black Forest Fire Chief on behalf of Black Forest Fire Protection District
|
11/13/2023 7:42:34 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
11/13/2023 7:42:31 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Pikes Peak Regional Building Department
|
11/13/2023 7:42:29 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
11/13/2023 7:42:27 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Jennifer Irvine on behalf of Road Impact Fee Administrator
|
11/13/2023 7:42:25 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Parks Advisory Board
|
11/13/2023 7:42:23 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
11/13/2023 7:42:21 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Glenn Reese on behalf of EPC Stormwater Review
|
11/13/2023 7:42:19 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Christina Prete on behalf of EPC Stormwater Review
|
11/13/2023 7:42:17 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Mike McCarthy on behalf of EPC Health Department
|
11/13/2023 7:42:14 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
11/13/2023 7:42:12 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by HEAEH LandUse on behalf of EPC Health Department
|
11/13/2023 7:42:10 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
11/13/2023 7:42:08 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Development Review
|
11/13/2023 7:42:01 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lupe Packman on behalf of PCD Engineering Division
|
11/13/2023 7:41:57 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/13/2023 7:41:55 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/13/2023 7:41:53 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Edward Schoenheit on behalf of PCD Engineering Division
|
11/13/2023 7:41:51 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
|
11/13/2023 7:41:49 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Charlene Durham on behalf of PCD Engineering Division
|
11/13/2023 7:41:47 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
11/13/2023 7:36:37 AM
|
Submission Triaged
|
11/12/2023 3:31:10 PM
|
Submission received from Applicant
|
9/21/2023 7:30:46 AM
|
Submission request sent to Applicant
|
9/20/2023 5:10:07 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/20/2023 2:25:24 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/19/2023 2:36:30 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
9/19/2023 2:32:16 PM
|
Submission request sent to Applicant
|
9/19/2023 2:31:36 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/19/2023 2:08:07 PM
|
Request for Review Comments email resent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
9/19/2023 2:04:43 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/19/2023 2:00:12 PM
|
Request for Review Comments email resent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
9/19/2023 1:14:52 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/19/2023 1:13:49 PM
|
Request for Review Comments email resent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
9/19/2023 1:12:40 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/18/2023 8:08:43 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
8/29/2023 7:20:25 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of PCD Administrative Notice
|
8/29/2023 7:19:11 AM
|
Submission Triaged
|
8/28/2023 2:46:58 PM
|
Submission received from Applicant
|
8/28/2023 2:25:43 PM
|
Submission request sent to Applicant
|
8/28/2023 2:22:00 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
|
8/28/2023 2:21:59 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
8/28/2023 2:21:56 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
8/28/2023 2:21:53 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
|
8/28/2023 2:21:52 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Engineering Manager on behalf of PCD Engineering Division
|
8/28/2023 2:19:45 PM
|
Submission Triaged
|
8/28/2023 1:32:24 PM
|
Submission received from Applicant
|
5/3/2023 1:12:12 PM
|
Request for Review Comments returned by Parks Advisory Board
|
4/24/2023 11:55:38 AM
|
Submission request sent to Applicant
|
4/24/2023 11:53:23 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/21/2023 3:22:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/18/2023 5:12:06 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/18/2023 1:55:41 PM
|
Request for Review Comments returned by County Attorney - Water
|
4/18/2023 10:28:56 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/13/2023 9:10:02 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
4/13/2023 8:07:57 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
4/11/2023 1:32:41 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/10/2023 2:03:00 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/5/2023 11:29:06 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/3/2023 8:14:20 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/30/2023 8:27:10 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
3/29/2023 10:14:17 AM
|
Request for Review Comments returned by EPC Environmental Services
|
3/28/2023 9:28:38 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/28/2023 9:27:58 AM
|
Submission Triaged
|
3/28/2023 9:17:07 AM
|
Submission received from Applicant
|
3/28/2023 7:35:53 AM
|
Submission request sent to Applicant
|
3/27/2023 2:01:15 PM
|
Request for Review Comments returned by EPC Parks Department
|
3/27/2023 7:10:56 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
3/22/2023 3:52:23 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
3/22/2023 3:52:22 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
3/22/2023 3:52:20 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
3/22/2023 3:52:19 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
3/22/2023 3:52:15 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
|
3/22/2023 3:52:14 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
3/22/2023 3:52:13 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
3/22/2023 3:52:12 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
3/22/2023 3:52:11 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
3/22/2023 3:52:10 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/22/2023 3:52:09 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/22/2023 3:52:07 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
3/22/2023 3:52:00 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/22/2023 3:51:57 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/22/2023 3:51:56 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
3/22/2023 3:51:54 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Parks Advisory Board
|
3/22/2023 3:51:52 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/22/2023 3:51:50 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Bill Elder on behalf of EPC Sheriff's Department
|
3/22/2023 3:51:49 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Bill Elder on behalf of EPC Sheriff's Department
|
3/22/2023 3:51:48 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
3/22/2023 3:51:47 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of EPC Parks Department
|
3/22/2023 3:51:46 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
3/22/2023 3:51:43 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/22/2023 3:51:42 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Water
|
3/22/2023 3:51:40 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
3/22/2023 3:51:38 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
3/22/2023 3:51:35 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/22/2023 3:47:29 PM
|
Submission Triaged
|
3/22/2023 3:41:38 PM
|
Submission received from Applicant
|
1/27/2023 2:27:04 PM
|
Request for Review Comments returned by EPC Health Department
|
1/26/2023 3:37:31 PM
|
Submission request sent to Applicant
|
1/26/2023 3:29:51 PM
|
Submission request sent to Applicant
|
1/26/2023 3:23:26 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/26/2023 3:10:50 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/26/2023 3:09:10 PM
|
Request for Review Comments email resent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
1/26/2023 2:50:09 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/25/2023 9:21:19 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/19/2023 10:43:57 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
1/19/2023 10:42:35 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
1/19/2023 10:42:32 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
1/12/2023 4:13:32 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/12/2023 3:58:45 PM
|
Request for Review Comments returned by Parks Advisory Board
|
1/4/2023 8:09:14 AM
|
Request for Review Comments returned by Colorado Springs Public Works
|
1/4/2023 8:06:32 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
1/4/2023 7:30:38 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
12/29/2022 10:40:14 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
12/21/2022 3:56:47 PM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/21/2022 3:20:06 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/20/2022 8:41:54 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/20/2022 8:41:52 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
12/20/2022 8:41:49 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/19/2022 10:50:26 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
12/16/2022 2:42:56 PM
|
Request for Review Comments returned by EPC Parks Department
|
12/16/2022 12:10:02 PM
|
Request for Review Comments returned by County Attorney - Water
|
12/14/2022 8:57:21 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
12/13/2022 1:35:53 PM
|
Request for Review Comments returned by EPC Environmental Services
|
12/13/2022 7:23:03 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/12/2022 3:14:44 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/12/2022 3:14:42 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Water
|
12/12/2022 3:14:41 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
12/12/2022 3:14:40 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
12/12/2022 3:14:38 PM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/12/2022 9:08:49 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tabitha Barile on behalf of Sterling Ranch Metropolitan District 1-3
|
12/12/2022 9:08:48 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
12/12/2022 9:08:47 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
12/12/2022 9:08:46 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
12/12/2022 9:08:45 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Records Management Lead LaShunda Simpson on behalf of Colorado Springs Public Works
|
12/12/2022 9:08:44 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
12/12/2022 9:08:43 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
12/12/2022 9:08:42 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
12/12/2022 9:08:41 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
12/12/2022 9:08:40 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
12/12/2022 9:08:39 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/12/2022 9:08:38 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
12/12/2022 9:08:29 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/12/2022 9:08:27 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/12/2022 9:08:25 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Victoria Chavez on behalf of Road Impact Fee Administrator
|
12/12/2022 9:08:23 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of Parks Advisory Board
|
12/12/2022 9:08:22 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/12/2022 9:08:20 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Bill Elder on behalf of EPC Sheriff's Department
|
12/12/2022 9:08:19 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Bill Elder on behalf of EPC Sheriff's Department
|
12/12/2022 9:08:17 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
12/12/2022 9:08:15 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by on behalf of EPC Parks Department
|
12/12/2022 9:08:14 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Catherine McGarvy on behalf of EPC Health Department
|
12/12/2022 9:08:09 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/12/2022 9:08:08 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by April Willie on behalf of County Attorney - Water
|
12/12/2022 9:08:07 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Lori Seago on behalf of County Attorney - Development Review
|
12/12/2022 9:08:05 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Kari Parsons on behalf of PCD Project Manager
|
12/12/2022 9:08:04 AM
|
Request for Review Comments email sent for Project Foursquare at Sterling Ranch East Filing No. 1 for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/8/2022 2:37:33 PM
|
Fees paid: 12/8/2022 (Receipt: 1007266)
|
12/8/2022 12:40:26 PM
|
Payment Request sent: 12/8/2022
|
12/8/2022 12:40:25 PM
|
File # Assigned: SF2236
|
12/8/2022 12:40:23 PM
|
Submission Triaged
|
12/8/2022 11:08:32 AM
|
Submission received from Applicant
|
12/7/2022 7:33:29 AM
|
Submission request sent to Applicant
|