6/12/2024 11:39:28 AM
|
Fees paid: 6/12/2024 (Receipt: 1009225)
|
4/10/2024 2:39:11 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
4/10/2024 2:38:58 PM
|
Project reopened for Review Comments
|
4/2/2024 7:29:49 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
3/20/2024 1:28:51 PM
|
Payment Request sent: 3/20/2024
|
2/9/2024 2:40:04 PM
|
Request for Review Comments returned by EPC Health Department
|
2/9/2024 10:13:36 AM
|
Request for Review Comments returned by County Attorney - Water
|
1/24/2024 3:27:37 PM
|
Request for Review Comments sent for Project Crawford Multi-Family Final Plat for review by April Willie on behalf of County Attorney - Water
|
1/22/2024 10:55:22 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
1/18/2024 8:23:07 AM
|
Request for Review Comments returned by PCD Engineering Division
|
1/17/2024 11:20:28 AM
|
Request for Review Comments returned by County Attorney - Water
|
1/11/2024 10:04:44 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
1/11/2024 10:04:42 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/11/2024 10:04:38 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Mike McCarthy on behalf of EPC Health Department
|
1/11/2024 10:04:37 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
1/11/2024 10:04:35 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by HEAEH LandUse on behalf of EPC Health Department
|
1/11/2024 10:04:32 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Lori Seago on behalf of County Attorney - Water
|
1/11/2024 10:04:30 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by April Willie on behalf of County Attorney - Water
|
1/11/2024 10:04:24 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/11/2024 10:04:22 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Engineering Manager on behalf of PCD Engineering Division
|
1/11/2024 10:02:19 AM
|
Submission Triaged
|
1/11/2024 8:57:41 AM
|
Submission received from Applicant
|
1/10/2024 3:42:31 PM
|
Submission request sent to Applicant
|
1/9/2024 3:09:04 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/9/2024 12:03:35 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/29/2023 10:00:45 AM
|
Request for Review Comments returned by County Attorney - Water
|
12/26/2023 8:49:48 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Water
|
12/26/2023 8:49:44 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by April Willie on behalf of County Attorney - Water
|
12/26/2023 8:49:37 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
12/26/2023 8:49:35 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Engineering Manager on behalf of PCD Engineering Division
|
12/26/2023 8:41:12 AM
|
Submission Triaged
|
12/22/2023 8:59:33 AM
|
Submission received from Applicant
|
12/21/2023 4:31:34 PM
|
Submission request sent to Applicant
|
12/21/2023 4:30:05 PM
|
Submission Triaged
|
12/21/2023 3:47:04 PM
|
Submission received from Applicant
|
12/7/2023 2:05:13 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/6/2023 2:47:54 PM
|
Request for Review Comments sent for Project Crawford Multi-Family Final Plat (Minor) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/28/2023 11:08:36 AM
|
Submission request sent to Applicant
|
11/28/2023 11:00:10 AM
|
Request for Review Comments returned by PCD Engineering Division
|
11/22/2023 8:41:36 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/21/2023 4:40:11 PM
|
Request for Review Comments returned by PCD Project Manager
|
11/20/2023 2:05:34 PM
|
Request for Review Comments returned by County Attorney - Water
|
11/8/2023 10:20:10 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by on behalf of Pikes Peak Regional Building Department
|
11/8/2023 10:20:08 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Mike McCarthy on behalf of EPC Health Department
|
11/8/2023 10:20:06 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Catherine McGarvy on behalf of EPC Health Department
|
11/8/2023 10:20:03 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by HEAEH LandUse on behalf of EPC Health Department
|
11/8/2023 10:20:01 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Water
|
11/8/2023 10:19:59 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by April Willie on behalf of County Attorney - Water
|
11/8/2023 10:19:55 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Lupe Packman on behalf of PCD Engineering Division
|
11/8/2023 10:19:53 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/8/2023 10:19:51 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/8/2023 10:19:49 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Edward Schoenheit on behalf of PCD Engineering Division
|
11/8/2023 10:19:47 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Engineering Manager on behalf of PCD Engineering Division
|
11/8/2023 10:19:43 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Charlene Durham on behalf of PCD Engineering Division
|
11/8/2023 10:19:41 AM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
|
11/8/2023 10:17:24 AM
|
Submission Triaged
|
11/7/2023 2:12:41 PM
|
Submission received from Applicant
|
9/26/2023 5:19:35 PM
|
Submission request sent to Applicant
|
9/26/2023 5:11:28 PM
|
Request for Review Comments returned by PCD Project Manager
|
9/21/2023 2:05:18 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/14/2023 10:51:19 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
9/12/2023 10:29:26 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
9/7/2023 2:10:42 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/25/2023 2:35:12 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
8/24/2023 3:35:26 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
8/24/2023 3:35:24 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
8/24/2023 3:35:23 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
8/24/2023 3:35:21 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/24/2023 3:35:18 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Catherine McGarvy on behalf of EPC Health Department
|
8/24/2023 3:35:16 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Ryan Howser on behalf of PCD Project Manager
|
8/24/2023 3:35:13 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Engineering Manager on behalf of PCD Engineering Division
|
8/24/2023 3:35:12 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat (Minor) for review by Engineering Manager on behalf of PCD Engineering Division
|
8/24/2023 3:33:11 PM
|
Submission Triaged
|
8/24/2023 3:14:59 PM
|
Submission received from Applicant
|
8/24/2023 3:05:33 PM
|
Submission request sent to Applicant
|
8/24/2023 3:04:49 PM
|
Submission Triaged
|
8/24/2023 2:50:22 PM
|
Submission received from Applicant
|
5/17/2023 9:49:49 AM
|
Request for Review Comments returned by County Attorney - Water
|
5/1/2023 1:39:44 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
4/28/2023 4:18:53 PM
|
Submission request sent to Applicant
|
4/20/2023 12:47:54 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/12/2023 4:12:36 PM
|
Request for Review Comments returned by Parks Advisory Board
|
4/11/2023 5:28:22 PM
|
Submission request sent to Applicant
|
4/11/2023 5:24:03 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/11/2023 5:20:40 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/10/2023 2:25:46 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/7/2023 2:19:13 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
4/7/2023 1:15:14 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/6/2023 4:20:25 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/6/2023 9:06:05 AM
|
Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
4/5/2023 9:45:52 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/2/2023 3:47:58 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
3/31/2023 7:23:36 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/29/2023 4:55:51 PM
|
Request for Review Comments returned by EPC Parks Department
|
3/28/2023 9:06:42 AM
|
Request for Review Comments returned by EPC Environmental Services
|
3/28/2023 7:18:53 AM
|
Request for Review Comments returned by Widefield SD 3
|
3/21/2023 4:05:52 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
3/21/2023 8:02:53 AM
|
Request for Review Comments returned by Fountain Mutual Irrigation Company
|
3/19/2023 5:21:25 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
3/17/2023 4:00:21 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by COO Dave Gish on behalf of Widefield SD 3
|
3/17/2023 4:00:20 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Joe Nardis on behalf of Westmoor Water & San
|
3/17/2023 4:00:19 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Garrett Markus on behalf of Southeastern Colorado Water Conservancy
|
3/17/2023 4:00:18 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Richard Davis on behalf of Security Water District
|
3/17/2023 4:00:17 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Jay Adriansen on behalf of Security Sanitation District
|
3/17/2023 4:00:16 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Alex Martin on behalf of Security Fire Protection District
|
3/17/2023 4:00:15 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by P.E. Mgr. Gary Steen on behalf of Fountain Mutual Irrigation Company
|
3/17/2023 4:00:14 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Kristy Martinez on behalf of Fountain
|
3/17/2023 4:00:13 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by District Manager Mariah Hudson on behalf of El Paso County Conservation Dist
|
3/17/2023 4:00:12 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by UDS Admin Staff on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
|
3/17/2023 4:00:11 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
3/17/2023 4:00:08 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
3/17/2023 4:00:07 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
3/17/2023 4:00:06 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Larry Small on behalf of Fountain Creek Watershed Flood Control & Greenway Dist
|
3/17/2023 4:00:05 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/17/2023 4:00:04 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
|
3/17/2023 4:00:03 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
3/17/2023 3:59:55 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/17/2023 3:59:54 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/17/2023 3:59:52 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by CDOT Permits Program Mgr Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
3/17/2023 3:59:48 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by on behalf of Parks Advisory Board
|
3/17/2023 3:59:46 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
3/17/2023 3:59:42 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Bill Elder on behalf of EPC Sheriff's Department
|
3/17/2023 3:59:41 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Bill Elder on behalf of EPC Sheriff's Department
|
3/17/2023 3:59:40 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
3/17/2023 3:59:39 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by on behalf of EPC Parks Department
|
3/17/2023 3:59:38 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Catherine McGarvy on behalf of EPC Health Department
|
3/17/2023 3:59:35 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/17/2023 3:59:34 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by April Willie on behalf of County Attorney - Water
|
3/17/2023 3:59:31 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
3/17/2023 3:59:28 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Ryan Howser on behalf of PCD Project Manager
|
3/17/2023 3:59:27 PM
|
Request for Review Comments email sent for Project Crawford Multi-Family Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/16/2023 9:53:47 AM
|
Fees paid: 3/16/2023 (Receipt: 1007612)
|
2/21/2023 4:15:57 PM
|
Payment Request sent: 2/21/2023
|
2/21/2023 4:15:57 PM
|
File # Assigned: SF235
|
2/21/2023 4:15:51 PM
|
Submission Triaged
|
2/21/2023 2:21:51 PM
|
Submission received from Applicant
|
2/21/2023 10:01:14 AM
|
Submission request sent to Applicant
|
2/21/2023 10:01:05 AM
|
Submission Triaged
|
2/20/2023 10:40:06 AM
|
Submission received from Applicant
|
2/17/2023 4:52:06 PM
|
Submission request sent to Applicant
|
2/17/2023 4:51:16 PM
|
Submission Triaged
|
2/17/2023 2:03:22 PM
|
Submission received from Applicant
|
1/4/2023 7:13:53 AM
|
Submission request sent to Applicant
|
11/1/2022 2:20:08 PM
|
Project Manager Assigned: Ryan Howser
|
10/18/2022 10:35:06 AM
|
Submission request sent to Applicant
|
10/18/2022 10:32:16 AM
|
EA Assigned: EA21167
|
10/18/2022 10:32:16 AM
|
Project Created
|