10/4/2024 10:39:23 AM
|
Fees paid: 10/4/2024 (Receipt: 1009664)
|
10/4/2024 9:40:21 AM
|
Payment Request sent: 10/4/2024
|
9/24/2024 5:11:31 PM
|
Project Ready for Approval requests. Review Comment period is complete.
|
9/24/2024 1:59:59 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/24/2024 12:12:26 PM
|
Request for Review Comments returned by County Attorney - Water
|
9/10/2024 2:54:29 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Lori Seago on behalf of County Attorney - Water
|
9/10/2024 2:54:27 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Erika Keech on behalf of County Attorney - Water
|
9/10/2024 2:54:25 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by April Willie on behalf of County Attorney - Water
|
9/10/2024 2:54:23 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
9/10/2024 2:54:21 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
|
9/10/2024 2:52:41 PM
|
Submission Triaged
|
9/10/2024 2:01:23 PM
|
Submission received from Applicant
|
9/10/2024 12:17:18 PM
|
Submission request sent to Applicant
|
9/10/2024 8:14:44 AM
|
Submission Triaged
|
9/9/2024 1:50:55 PM
|
Submission received from Applicant
|
8/6/2024 5:13:47 PM
|
Submission request sent to Applicant
|
8/6/2024 1:48:37 PM
|
Request for Review Comments returned by PCD Engineering Division
|
7/31/2024 10:27:32 AM
|
Request for Review Comments returned by PCD Project Manager
|
7/30/2024 5:12:35 PM
|
Request for Review Comments returned by County Attorney - Water
|
7/24/2024 10:41:15 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Kari Parsons on behalf of PCD Project Manager
|
7/24/2024 10:41:13 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
7/24/2024 10:41:11 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
|
7/24/2024 10:39:55 AM
|
Submission Triaged
|
7/22/2024 5:21:55 PM
|
Submission received from Applicant
|
7/18/2024 3:21:19 PM
|
Request for Review Comments sent for Project Waterside PUDSP for review by April Willie on behalf of County Attorney - Water
|
7/9/2024 11:15:10 AM
|
Submission request sent to Applicant
|
7/8/2024 11:56:58 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
6/25/2024 10:21:08 AM
|
Request for Review Comments email resent for Project Waterside PUDSP for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
6/24/2024 10:22:38 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
6/13/2024 10:23:21 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/12/2024 10:31:23 AM
|
Request for Review Comments sent for Project Waterside PUDSP for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
6/12/2024 9:18:15 AM
|
Request for Review Comments returned by PCD Engineering Division
|
6/5/2024 4:43:19 PM
|
Request for Review Comments returned by County Attorney - Water
|
5/30/2024 4:39:30 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Lori Seago on behalf of County Attorney - Water
|
5/30/2024 4:39:28 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Erika Keech on behalf of County Attorney - Water
|
5/30/2024 4:39:26 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by April Willie on behalf of County Attorney - Water
|
5/30/2024 4:39:22 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Kari Parsons on behalf of PCD Project Manager
|
5/30/2024 4:39:20 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Gilbert LaForce on behalf of PCD Engineering Division
|
5/30/2024 4:39:18 PM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Engineering Manager on behalf of PCD Engineering Division
|
5/30/2024 4:37:55 PM
|
Submission Triaged
|
5/30/2024 3:29:49 PM
|
Submission received from Applicant
|
3/29/2024 7:30:55 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/28/2024 11:36:18 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
3/28/2024 11:36:16 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
3/28/2024 11:36:14 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
3/28/2024 11:36:13 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
3/28/2024 11:35:28 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
3/28/2024 11:35:26 AM
|
Request for Review Comments email sent for Project Waterside PUDSP for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/29/2024 11:05:05 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
2/22/2024 9:36:58 AM
|
Submission request sent to Applicant
|
2/16/2024 7:43:38 AM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
2/14/2024 2:31:01 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
2/14/2024 11:04:59 AM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
2/13/2024 1:20:39 PM
|
Request for Review Comments returned by PCD Project Manager
|
2/13/2024 11:59:50 AM
|
Request for Review Comments returned by PCD Engineering Division
|
2/5/2024 12:24:06 PM
|
Request for Review Comments returned by County Attorney - Water
|
1/24/2024 3:31:31 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/24/2024 1:47:21 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/24/2024 12:47:56 PM
|
Request for Review Comments returned by EPC Environmental Services
|
1/23/2024 8:39:20 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
1/23/2024 8:39:18 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Bob Mooney on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
1/23/2024 8:39:16 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Theresa Rust on behalf of Monument
|
1/23/2024 8:39:14 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Steve Sheffield on behalf of Monument
|
1/23/2024 8:39:11 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Shelia Booth on behalf of Monument
|
1/23/2024 8:39:09 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by on behalf of Monument
|
1/23/2024 8:39:07 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Luke Kerr on behalf of Monument
|
1/23/2024 8:39:05 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Jeffrey Liljegren on behalf of Monument
|
1/23/2024 8:39:03 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Vicki Wood on behalf of Lewis Palmer 38
|
1/23/2024 8:39:01 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Chris Coulter on behalf of Lewis Palmer 38
|
1/23/2024 8:38:59 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
1/23/2024 8:38:57 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
1/23/2024 8:38:55 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
1/23/2024 8:38:53 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
1/23/2024 8:38:51 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
1/23/2024 8:38:49 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
1/23/2024 8:38:47 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
1/23/2024 8:38:45 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/23/2024 8:38:41 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
1/23/2024 8:38:40 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
1/23/2024 8:38:38 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
|
1/23/2024 8:38:36 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
1/23/2024 8:38:34 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/23/2024 8:38:32 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/23/2024 8:38:30 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Christina Prete on behalf of EPC Stormwater Review
|
1/23/2024 8:38:28 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/23/2024 8:38:26 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Lori Seago on behalf of County Attorney - Water
|
1/23/2024 8:38:24 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by April Willie on behalf of County Attorney - Water
|
1/23/2024 8:38:22 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Lori Seago on behalf of County Attorney - Development Review
|
1/23/2024 8:38:20 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by April Willie on behalf of County Attorney - Development Review
|
1/23/2024 8:38:13 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/23/2024 8:38:11 AM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Engineering Manager on behalf of PCD Engineering Division
|
1/23/2024 8:30:21 AM
|
Submission Triaged
|
1/22/2024 5:49:40 PM
|
Submission received from Applicant
|
10/27/2023 7:07:16 AM
|
Submission request sent to Applicant
|
4/21/2023 1:31:51 PM
|
Submission request sent to Applicant
|
4/21/2023 1:31:13 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/21/2023 12:37:35 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/19/2023 1:44:56 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/18/2023 1:17:06 PM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
4/7/2023 3:43:41 PM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
4/7/2023 3:43:40 PM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Ryan Howser on behalf of PCD Project Manager
|
4/7/2023 3:43:38 PM
|
Request for Review Comments email sent for Project Waterside PUDSP (Major) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/7/2023 3:41:26 PM
|
Submission Triaged
|
4/7/2023 2:54:39 PM
|
Submission received from Applicant
|
4/5/2023 4:04:16 PM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
3/28/2023 8:54:58 AM
|
Submission request sent to Applicant
|
3/23/2023 4:06:21 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/10/2023 11:32:36 AM
|
Request for Review Comments returned by PCD Project Manager
|
3/2/2023 7:28:34 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
3/2/2023 7:28:31 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/2/2023 7:28:30 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Ryan Howser on behalf of PCD Project Manager
|
3/2/2023 7:28:27 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
3/2/2023 7:26:07 AM
|
Submission Triaged
|
3/1/2023 3:56:04 PM
|
Submission received from Applicant
|
12/21/2022 1:05:26 PM
|
Submission request sent to Applicant
|
12/21/2022 12:02:51 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/20/2022 9:25:10 AM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
12/19/2022 3:22:31 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/19/2022 11:00:06 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
12/9/2022 10:39:43 AM
|
Request for Review Comments returned by County Attorney - Water
|
12/2/2022 3:10:31 PM
|
Request for Review Comments returned by EPC Environmental Services
|
11/29/2022 11:56:19 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
11/29/2022 11:56:17 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
11/29/2022 11:56:16 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Kathy Andrew on behalf of EPC Environmental Services
|
11/29/2022 11:56:13 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Edi Anderson on behalf of County Attorney - Water
|
11/29/2022 11:56:12 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Ryan Howser on behalf of PCD Project Manager
|
11/29/2022 11:56:10 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/29/2022 11:53:14 AM
|
Submission Triaged
|
11/23/2022 4:38:34 PM
|
Submission received from Applicant
|
10/24/2022 3:34:18 PM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
10/21/2022 4:50:39 PM
|
Submission request sent to Applicant
|
10/21/2022 4:47:12 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/20/2022 3:20:17 PM
|
Request for Review Comments returned by PCD Engineering Division
|
10/20/2022 1:20:31 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
10/14/2022 4:16:07 PM
|
Request for Review Comments returned by EPC Parks Department
|
10/6/2022 9:14:46 AM
|
Request for Review Comments returned by EPC Environmental Services
|
10/6/2022 8:51:45 AM
|
Request for Review Comments returned by County Attorney - Water
|
9/29/2022 7:30:06 AM
|
Request for Review Comments returned by RBD Floodplain
|
9/29/2022 7:12:12 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
9/29/2022 7:12:10 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Keith Curtis on behalf of RBD Floodplain
|
9/29/2022 7:12:09 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/29/2022 7:12:08 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by on behalf of EPC Parks Department
|
9/29/2022 7:12:07 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Kathy Andrew on behalf of EPC Environmental Services
|
9/29/2022 7:12:04 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Edi Anderson on behalf of County Attorney - Water
|
9/29/2022 7:12:03 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Ryan Howser on behalf of PCD Project Manager
|
9/29/2022 7:12:01 AM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/29/2022 7:09:36 AM
|
Submission Triaged
|
9/28/2022 5:56:59 PM
|
Submission received from Applicant
|
9/27/2022 8:09:05 AM
|
Submission request sent to Applicant
|
9/27/2022 8:08:35 AM
|
Submission Triaged
|
9/23/2022 6:15:26 PM
|
Submission received from Applicant
|
9/14/2022 8:36:47 PM
|
Request for Review Comments returned by EPC Health Department
|
8/17/2022 8:30:22 AM
|
Submission request sent to Applicant
|
8/17/2022 8:26:54 AM
|
Request for Review Comments returned by PCD Project Manager
|
8/16/2022 6:09:23 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/12/2022 10:32:15 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
8/11/2022 2:24:01 PM
|
Request for Review Comments returned by Parks Advisory Board
|
8/9/2022 3:44:21 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
8/9/2022 2:42:00 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
8/9/2022 2:34:27 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
8/9/2022 10:04:14 AM
|
Request for Review Comments returned by Woodmoor Water and Sanitation District
|
8/8/2022 2:09:55 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
8/8/2022 1:58:15 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
8/4/2022 10:47:00 AM
|
Request for Review Comments returned by EPC Environmental Services
|
8/2/2022 12:42:03 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/29/2022 12:16:51 PM
|
Request for Review Comments returned by EPC Parks Department
|
7/28/2022 8:29:34 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
7/26/2022 1:30:27 PM
|
Request for Review Comments returned by County Attorney - Water
|
7/25/2022 10:53:29 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
7/21/2022 3:53:36 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/19/2022 9:25:49 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
7/19/2022 3:41:17 PM
|
Request for Review Comments returned by RBD Floodplain
|
7/19/2022 3:26:41 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Woodmoor Water District on behalf of Woodmoor Water and Sanitation District
|
7/19/2022 3:26:39 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Division Chief Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
7/19/2022 3:26:38 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
7/19/2022 3:26:37 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by General Email on behalf of Mountain View Electric Association, Inc.
|
7/19/2022 3:26:36 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Meggan Herrington on behalf of Monument
|
7/19/2022 3:26:35 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Vicki Wood on behalf of Lewis Palmer 38
|
7/19/2022 3:26:33 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
7/19/2022 3:26:32 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
7/19/2022 3:26:31 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Keith Curtis on behalf of RBD Floodplain
|
7/19/2022 3:26:30 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
7/19/2022 3:26:29 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
7/19/2022 3:26:28 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
7/19/2022 3:26:26 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
|
7/19/2022 3:26:25 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
7/19/2022 3:26:22 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
7/19/2022 3:26:21 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
7/19/2022 3:26:20 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by CDOT Permits Manager Valerie Vigil on behalf of Colorado Department of Transportation - Pueblo Office
|
7/19/2022 3:26:18 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by on behalf of Parks Advisory Board
|
7/19/2022 3:26:17 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
7/19/2022 3:26:16 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
7/19/2022 3:26:15 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
7/19/2022 3:26:14 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by on behalf of EPC Parks Department
|
7/19/2022 3:26:08 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Catherine McGarvy on behalf of EPC Health Department
|
7/19/2022 3:26:06 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Kathy Andrew on behalf of EPC Environmental Services
|
7/19/2022 3:26:05 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Edi Anderson on behalf of County Attorney - Water
|
7/19/2022 3:26:04 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Lori Seago on behalf of County Attorney - Development Review
|
7/19/2022 3:26:03 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Ryan Howser on behalf of PCD Project Manager
|
7/19/2022 3:26:01 PM
|
Request for Review Comments email sent for Project Waterside PUD/SP for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/19/2022 8:59:26 AM
|
Fees paid: 7/19/2022 (Receipt: 1006661)
|
7/11/2022 3:22:36 PM
|
Payment Request sent: 7/11/2022
|
7/11/2022 9:56:29 AM
|
Fees paid: 7/11/2022 (Receipt: 1006614)
|
7/6/2022 3:02:49 PM
|
Payment Request sent: 7/6/2022
|
7/6/2022 3:02:49 PM
|
File # Assigned: PUDSP229
|
7/6/2022 3:02:45 PM
|
Submission Triaged
|
7/5/2022 4:32:12 PM
|
Submission received from Applicant
|
7/1/2022 1:26:34 PM
|
Submission request sent to Applicant
|
8/11/2021 5:32:17 PM
|
Submission request sent to Applicant
|
8/3/2021 2:25:33 PM
|
Project Manager Assigned: Ryan Howser
|
8/3/2021 2:25:32 PM
|
EA Assigned: EA21136
|
8/3/2021 2:25:32 PM
|
Project Created
|