| 1/11/2021 8:07:12 AM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 1/5/2021 10:26:40 AM | Fees paid: 1/5/2021 (Receipt: 1003748) | 
                
                    | 1/5/2021 8:39:36 AM | Payment Request sent: 1/5/2021 | 
                
                    | 12/4/2020 8:48:46 AM | Project Closed | 
                
                    | 12/4/2020 8:48:46 AM | Project Approved: 12/4/2020 | 
                
                    | 12/2/2020 10:40:46 AM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 12/1/2020 1:54:54 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 11/25/2020 3:07:49 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 11/25/2020 10:37:30 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 11/10/2020 3:54:54 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 11/4/2020 1:29:56 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 11/4/2020 12:55:19 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Maint Dir Greg Land on behalf of Peyton 23 | 
                
                    | 11/4/2020 12:55:16 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 11/4/2020 12:55:14 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 11/4/2020 12:55:12 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 11/4/2020 12:55:10 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 11/4/2020 12:55:08 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by  on behalf of EPC Parks Department | 
                
                    | 11/4/2020 12:55:06 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 11/4/2020 12:55:04 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 11/4/2020 12:55:00 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 11/4/2020 12:53:35 PM | Submission Triaged | 
                
                    | 11/4/2020 9:46:28 AM | Submission received from Applicant | 
                
                    | 10/27/2020 12:45:22 PM | Submission request sent to Applicant | 
                
                    | 10/13/2020 10:08:49 AM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 10/13/2020 9:38:22 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 10/9/2020 12:33:52 PM | Request for Review Comments returned by Woodmen Hills Metro | 
                
                    | 10/5/2020 8:07:24 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 10/2/2020 11:50:26 AM | Request for Review Comments email resent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 10/1/2020 11:11:38 AM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 9/29/2020 10:45:12 AM | Project reopened for Review Comments | 
                
                    | 9/29/2020 10:44:38 AM | Project Closed | 
                
                    | 9/29/2020 10:44:38 AM | Project Approved: 9/29/2020 | 
                
                    | 9/29/2020 10:43:38 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/23/2020 7:22:41 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 9/23/2020 7:22:36 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 9/23/2020 7:13:02 AM | Submission Triaged | 
                
                    | 9/22/2020 3:48:15 PM | Submission received from Applicant | 
                
                    | 9/22/2020 7:51:35 AM | Request for Review Comments returned by Traffic Review Consultant | 
                
                    | 9/17/2020 9:03:14 AM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 9/15/2020 7:41:10 AM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 9/10/2020 3:43:20 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 9/9/2020 2:51:51 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 9/8/2020 7:28:43 AM | Submission request sent to Applicant | 
                
                    | 9/4/2020 10:53:03 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 9/3/2020 5:27:27 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 8/26/2020 12:30:08 PM | Submission Triaged | 
                
                    | 8/26/2020 12:13:53 PM | Submission received from Applicant | 
                
                    | 8/26/2020 12:07:44 PM | Submission request sent to Applicant | 
                
                    | 8/26/2020 12:07:30 PM | Submission Triaged | 
                
                    | 8/26/2020 11:54:03 AM | Submission received from Applicant | 
                
                    | 8/26/2020 11:25:14 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 8/26/2020 11:20:39 AM | Submission request sent to Applicant | 
                
                    | 8/26/2020 11:20:25 AM | Submission Triaged | 
                
                    | 8/26/2020 10:35:32 AM | Submission received from Applicant | 
                
                    | 8/25/2020 1:40:06 PM | Submission request sent to Applicant | 
                
                    | 8/25/2020 11:25:21 AM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 8/25/2020 11:01:59 AM | Submission request sent to Applicant | 
                
                    | 8/25/2020 9:42:49 AM | Submission request sent to Applicant | 
                
                    | 8/20/2020 1:41:54 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 8/20/2020 7:17:15 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Brian Matise on behalf of Four Way Ranch Metro | 
                
                    | 8/20/2020 7:16:08 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Maint Dir Greg Land on behalf of Peyton 23 | 
                
                    | 8/20/2020 7:14:52 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Jerry Jacobson on behalf of Woodmen Hills Metro | 
                
                    | 8/20/2020 7:14:51 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc. | 
                
                    | 8/20/2020 7:14:50 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Paul Brown on behalf of Traffic Review Consultant | 
                
                    | 8/20/2020 7:14:49 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 8/20/2020 7:14:48 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 8/20/2020 7:14:47 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 8/20/2020 7:14:46 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 8/20/2020 7:14:45 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 8/20/2020 7:14:43 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 8/20/2020 7:14:42 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by  on behalf of Parks Advisory Board | 
                
                    | 8/20/2020 7:14:35 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by  on behalf of EPC Health Department | 
                
                    | 8/20/2020 7:14:32 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 8/20/2020 7:14:31 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 8/20/2020 7:11:53 AM | Submission Triaged | 
                
                    | 8/19/2020 4:52:16 PM | Submission received from Applicant | 
                
                    | 8/19/2020 2:37:21 PM | Submission request sent to Applicant | 
                
                    | 8/18/2020 4:43:50 PM | Submission request sent to Applicant | 
                
                    | 8/18/2020 10:41:34 AM | Submission request sent to Applicant | 
                
                    | 8/18/2020 10:41:06 AM | Submission Triaged | 
                
                    | 8/17/2020 8:15:45 PM | Submission received from Applicant | 
                
                    | 8/13/2020 7:26:58 PM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 8/6/2020 8:56:49 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 8/6/2020 8:55:57 AM | Request for Review Comments email resent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 8/6/2020 8:54:30 AM | Submission request sent to Applicant | 
                
                    | 8/6/2020 8:53:00 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 8/5/2020 9:37:35 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 8/5/2020 8:07:26 AM | Request for Review Comments returned by Traffic Review Consultant | 
                
                    | 8/3/2020 11:34:58 AM | Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO) | 
                
                    | 7/23/2020 12:08:43 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Paul Brown on behalf of Traffic Review Consultant | 
                
                    | 7/20/2020 4:30:44 PM | Request for Review Comments returned by RBD Floodplain | 
                
                    | 7/17/2020 2:15:54 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 7/17/2020 10:58:54 AM | Request for Review Comments returned by El Paso County Conservation Dist | 
                
                    | 7/14/2020 11:02:19 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments | 
                
                    | 7/14/2020 11:02:18 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Greg Langer on behalf of Natural Resources Conservation Service (Federal Agency) | 
                
                    | 7/14/2020 11:02:16 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Mr. David Pelser on behalf of Meridian Ranch/Meridian Service Metro Dist. | 
                
                    | 7/14/2020 11:02:15 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Melissa Andrews on behalf of Falcon School District 49 | 
                
                    | 7/14/2020 11:02:14 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist | 
                
                    | 7/14/2020 11:02:12 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO) | 
                
                    | 7/14/2020 11:02:11 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila | 
                
                    | 7/14/2020 11:02:10 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain | 
                
                    | 7/14/2020 11:02:09 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 7/14/2020 11:02:08 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Justin Osborne on behalf of Colorado State Land Board | 
                
                    | 7/14/2020 10:57:03 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Maint Dir Greg Land on behalf of Peyton 23 | 
                
                    | 7/14/2020 10:57:02 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO) | 
                
                    | 7/14/2020 10:57:01 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Brian Matise on behalf of Four Way Ranch Metro | 
                
                    | 7/14/2020 10:57:00 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 7/14/2020 10:56:59 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 7/14/2020 10:56:57 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department | 
                
                    | 7/14/2020 10:56:56 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer | 
                
                    | 7/14/2020 10:56:55 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 7/14/2020 10:56:54 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 7/14/2020 10:56:52 AM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 7/14/2020 10:54:09 AM | Submission Triaged | 
                
                    | 7/14/2020 8:52:15 AM | Submission received from Applicant | 
                
                    | 6/30/2020 4:40:34 PM | Request for Review Comments returned by Upper Black Squirrel Creek GWMD | 
                
                    | 6/12/2020 11:42:26 AM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 6/9/2020 3:02:18 PM | Request for Review Comments returned by Traffic Review Consultant | 
                
                    | 6/9/2020 1:31:54 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 6/9/2020 12:48:40 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 6/5/2020 4:19:07 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 6/5/2020 3:52:27 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Paul Brown on behalf of Traffic Review Consultant | 
                
                    | 6/3/2020 4:22:08 PM | Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office | 
                
                    | 6/3/2020 4:20:44 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 6/2/2020 4:44:21 PM | Submission request sent to Applicant | 
                
                    | 6/2/2020 4:33:23 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 6/2/2020 4:32:17 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 6/2/2020 2:09:33 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Brian Matise on behalf of Four Way Ranch Metro | 
                
                    | 5/29/2020 2:10:18 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 5/19/2020 10:54:18 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 5/14/2020 11:25:34 AM | Request for Review Comments returned by Peyton 23 | 
                
                    | 5/13/2020 4:46:52 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 5/13/2020 3:52:55 PM | Request for Review Comments returned by Woodmen Hills Metro | 
                
                    | 5/13/2020 3:30:14 PM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 5/13/2020 2:34:43 PM | Request for Review Comments returned by Falcon Fire Protection District | 
                
                    | 5/13/2020 12:37:37 PM | Request for Review Comments email resent for Project GrandView Reserve Sketch Plan for review by Jerry Jacobson on behalf of Woodmen Hills Metro | 
                
                    | 5/11/2020 10:10:03 AM | Request for Review Comments returned by Woodmen Hills Metro | 
                
                    | 5/9/2020 4:18:54 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 4/29/2020 4:15:58 PM | Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO) | 
                
                    | 4/28/2020 4:20:46 PM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 4/27/2020 3:39:00 PM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 4/23/2020 4:07:03 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Jerry Jacobson on behalf of Woodmen Hills Metro | 
                
                    | 4/23/2020 4:07:02 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Contact on behalf of Springs East Airport | 
                
                    | 4/23/2020 4:07:01 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments | 
                
                    | 4/23/2020 4:07:00 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Maint Dir Greg Land on behalf of Peyton 23 | 
                
                    | 4/23/2020 4:06:59 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO) | 
                
                    | 4/23/2020 4:06:57 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Greg Langer on behalf of Natural Resources Conservation Service (Federal Agency) | 
                
                    | 4/23/2020 4:06:56 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc. | 
                
                    | 4/23/2020 4:06:55 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Mr. David Pelser on behalf of Meridian Ranch/Meridian Service Metro Dist. | 
                
                    | 4/23/2020 4:06:54 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Barbara Vander Wall on behalf of Four Way Ranch Metro | 
                
                    | 4/23/2020 4:06:54 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Melissa Andrews on behalf of Falcon School District 49 | 
                
                    | 4/23/2020 4:06:53 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Fire Chief Trent Harwig on behalf of Falcon Fire Protection District | 
                
                    | 4/23/2020 4:06:52 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by District Conservationist Deric Clemons on behalf of El Paso County Conservation Dist | 
                
                    | 4/23/2020 4:06:51 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO) | 
                
                    | 4/23/2020 4:06:50 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joe Valdez on behalf of Black Hills Energy-Aquila | 
                
                    | 4/23/2020 4:06:48 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD | 
                
                    | 4/23/2020 4:06:48 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department | 
                
                    | 4/23/2020 4:06:47 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by DeBerry Drew on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.) | 
                
                    | 4/23/2020 4:06:46 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 4/23/2020 4:06:45 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Justin Osborne on behalf of Colorado State Land Board | 
                
                    | 4/23/2020 4:06:44 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 4/23/2020 4:06:43 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 4/23/2020 4:06:42 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Permits Manager Valerie Sword on behalf of Colorado Department of Transportation - Pueblo Office | 
                
                    | 4/23/2020 4:06:41 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by  on behalf of Parks Advisory Board | 
                
                    | 4/23/2020 4:06:40 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Commander John Padgett on behalf of EPC Sheriff's Department | 
                
                    | 4/23/2020 4:06:39 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer | 
                
                    | 4/23/2020 4:06:38 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by  on behalf of EPC Parks Department | 
                
                    | 4/23/2020 4:06:37 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by  on behalf of EPC Health Department | 
                
                    | 4/23/2020 4:06:35 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 4/23/2020 4:06:34 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 4/23/2020 4:06:33 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager | 
                
                    | 4/23/2020 4:06:32 PM | Request for Review Comments email sent for Project GrandView Reserve Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 4/23/2020 3:17:09 PM | Fees paid: 4/23/2020 (Receipt: 1002669) | 
                
                    | 4/23/2020 2:25:30 PM | Payment Request sent: 4/23/2020 | 
                
                    | 4/23/2020 2:25:27 PM | Submission Triaged | 
                
                    | 4/23/2020 2:24:51 PM | Submission received from Applicant | 
                
                    | 4/23/2020 2:17:15 PM | File # Assigned: SKP201 | 
                
                    | 4/23/2020 2:15:36 PM | Submission request sent to Applicant | 
                
                    | 4/23/2020 2:15:13 PM | Submission Triaged | 
                
                    | 4/23/2020 2:12:39 PM | Submission received from Applicant | 
                
                    | 4/22/2020 7:46:07 AM | Submission request sent to Applicant | 
                
                    | 4/22/2020 7:45:45 AM | Submission Triaged | 
                
                    | 4/22/2020 6:10:34 AM | Submission received from Applicant | 
                
                    | 2/12/2020 4:09:31 PM | Submission request sent to Applicant | 
                
                    | 2/12/2020 3:32:42 PM | Project Manager Assigned: Kari Parsons | 
                
                    | 2/12/2020 3:32:42 PM | EA Assigned: EA2020 | 
                
                    | 2/12/2020 3:32:42 PM | Project Created |