| 7/9/2025 5:12:38 PM | Submission request sent to Applicant | 
                
                    | 6/27/2024 2:07:54 PM | Submission request sent to Applicant | 
                
                    | 6/27/2024 12:44:11 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 6/24/2024 4:53:40 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 6/12/2024 10:07:02 AM | Fees paid: 6/12/2024 (Receipt: 1009224) | 
                
                    | 6/11/2024 3:17:26 PM | Payment Request sent: 6/11/2024 | 
                
                    | 6/11/2024 9:46:51 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Shannon Mustoe on behalf of EPC Stormwater Review | 
                
                    | 6/11/2024 9:46:49 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Mikayla Hartford on behalf of EPC Stormwater Review | 
                
                    | 6/11/2024 9:46:47 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Glenn Reese on behalf of EPC Stormwater Review | 
                
                    | 6/11/2024 9:46:45 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Christina Prete on behalf of EPC Stormwater Review | 
                
                    | 6/11/2024 9:46:40 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Gilbert LaForce on behalf of PCD Engineering Division | 
                
                    | 6/11/2024 9:46:38 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Engineering Manager on behalf of PCD Engineering Division | 
                
                    | 6/7/2024 12:46:18 PM | Submission Triaged | 
                
                    | 6/6/2024 11:30:44 AM | Submission received from Applicant | 
                
                    | 5/30/2024 7:40:18 AM | Submission request sent to Applicant | 
                
                    | 5/29/2024 8:55:04 AM | Project reopened for Review Comments | 
                
                    | 11/14/2023 1:50:05 PM | Project Closed | 
                
                    | 11/14/2023 1:50:05 PM | Project Approved: 11/14/2023 | 
                
                    | 11/9/2023 12:45:52 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 10/10/2023 7:15:37 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 10/10/2023 7:14:21 AM | Submission Triaged | 
                
                    | 10/6/2023 6:35:52 PM | Submission received from Applicant | 
                
                    | 10/6/2023 1:55:53 PM | Submission request sent to Applicant | 
                
                    | 10/6/2023 1:55:41 PM | Submission Triaged | 
                
                    | 10/6/2023 1:23:11 PM | Submission received from Applicant | 
                
                    | 10/5/2023 10:21:03 AM | Submission request sent to Applicant | 
                
                    | 9/26/2023 12:01:13 PM | Submission request sent to Applicant | 
                
                    | 9/26/2023 11:58:49 AM | Project reopened for Review Comments | 
                
                    | 9/22/2023 4:22:41 PM | Project Closed | 
                
                    | 9/22/2023 4:22:41 PM | Project Approved: 9/22/2023 | 
                
                    | 9/12/2023 2:45:25 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 8/30/2023 5:09:05 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 8/30/2023 5:08:40 PM | Submission Triaged | 
                
                    | 8/30/2023 5:03:53 PM | Submission received from Applicant | 
                
                    | 7/19/2023 7:15:27 AM | Submission request sent to Applicant | 
                
                    | 7/18/2023 3:19:48 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 7/18/2023 3:14:36 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 7/12/2023 1:27:06 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 7/12/2023 1:26:16 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 6/29/2023 7:40:27 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 6/29/2023 7:40:27 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 6/29/2023 7:40:26 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 6/29/2023 7:40:26 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 6/29/2023 7:35:29 AM | Submission Triaged | 
                
                    | 6/28/2023 5:07:33 PM | Submission received from Applicant | 
                
                    | 6/23/2023 4:28:15 PM | Submission request sent to Applicant | 
                
                    | 6/22/2023 11:31:16 AM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 6/20/2023 2:35:34 PM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 6/19/2023 4:11:45 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 6/9/2023 8:58:06 AM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 6/2/2023 5:14:24 PM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 6/2/2023 11:45:21 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 6/1/2023 4:20:19 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 5/30/2023 3:50:30 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 5/24/2023 8:46:39 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 5/24/2023 8:45:57 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 5/24/2023 8:45:54 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 5/24/2023 8:45:51 AM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 5/24/2023 8:43:46 AM | Submission Triaged | 
                
                    | 5/24/2023 8:02:26 AM | Submission received from Applicant | 
                
                    | 5/19/2023 8:08:30 AM | Submission request sent to Applicant | 
                
                    | 5/18/2023 4:05:00 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 5/17/2023 4:31:23 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 5/17/2023 4:10:34 PM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 5/17/2023 2:34:51 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 5/3/2023 6:29:52 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 5/2/2023 10:25:35 AM | Request for Review Comments email resent for Project Terra Ridge North Final Plat (Minor) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department | 
                
                    | 5/2/2023 9:14:43 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 4/28/2023 10:07:56 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 4/27/2023 1:43:28 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by PJ Langmaid on behalf of Black Forest Fire Protection District | 
                
                    | 4/27/2023 1:43:27 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department | 
                
                    | 4/27/2023 1:43:25 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 4/27/2023 1:43:23 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 4/27/2023 1:43:17 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 4/27/2023 1:43:16 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 4/27/2023 1:43:15 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 4/27/2023 1:43:12 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 4/27/2023 1:41:18 PM | Submission Triaged | 
                
                    | 4/27/2023 10:44:37 AM | Submission received from Applicant | 
                
                    | 4/21/2023 2:07:14 PM | Submission request sent to Applicant | 
                
                    | 4/13/2023 4:11:12 PM | Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO) | 
                
                    | 3/21/2023 2:35:00 PM | Submission request sent to Applicant | 
                
                    | 3/21/2023 2:30:27 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 3/20/2023 4:39:19 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 3/20/2023 8:02:43 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 3/17/2023 3:59:37 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 3/16/2023 9:45:22 AM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 3/6/2023 11:52:59 AM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 3/6/2023 3:45:01 AM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 3/2/2023 4:34:29 PM | Request for Review Comments returned by Black Forest Fire Protection District | 
                
                    | 3/2/2023 11:22:00 AM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 2/24/2023 2:22:27 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO) | 
                
                    | 2/24/2023 2:22:24 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila | 
                
                    | 2/24/2023 2:22:23 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Cheryl Pixley on behalf of Black Forest Trails Association | 
                
                    | 2/24/2023 2:22:22 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Terry Stokka on behalf of Black Forest Land Use Committee | 
                
                    | 2/24/2023 2:22:19 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Bryan Jack on behalf of Black Forest Fire Protection District | 
                
                    | 2/24/2023 2:22:18 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 2/24/2023 2:22:15 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 2/24/2023 2:22:14 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 2/24/2023 2:22:11 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 2/24/2023 2:16:56 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department | 
                
                    | 2/24/2023 2:16:53 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 2/24/2023 2:16:51 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 2/24/2023 2:16:49 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 2/24/2023 2:16:46 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 2/24/2023 2:16:45 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 2/24/2023 2:16:44 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 2/24/2023 2:16:41 PM | Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 2/24/2023 2:13:48 PM | Submission Triaged | 
                
                    | 2/24/2023 2:09:21 PM | Submission received from Applicant | 
                
                    | 2/24/2023 1:37:26 PM | Request for Review Comments returned by EPC Health Department | 
                
                    | 2/24/2023 10:36:06 AM | Submission request sent to Applicant | 
                
                    | 2/24/2023 10:35:57 AM | Submission Triaged | 
                
                    | 2/23/2023 5:16:38 PM | Submission received from Applicant | 
                
                    | 2/21/2023 2:55:59 PM | Submission request sent to Applicant | 
                
                    | 1/24/2023 8:57:20 AM | Request for Review Comments returned by EPC Stormwater Review | 
                
                    | 1/23/2023 7:32:40 PM | Request for Review Comments returned by Colorado Division of Water Resources | 
                
                    | 1/20/2023 4:34:24 PM | Request for Review Comments returned by EPC County Attorney's Office | 
                
                    | 1/19/2023 12:06:44 PM | Submission request sent to Applicant | 
                
                    | 1/19/2023 12:04:18 PM | Request for Review Comments returned by PCD Project Manager | 
                
                    | 1/12/2023 5:05:38 PM | Request for Review Comments returned by El Paso County Conservation Dist | 
                
                    | 1/12/2023 4:41:26 PM | Request for Review Comments returned by County Attorney - Development Review | 
                
                    | 1/11/2023 3:39:57 PM | Request for Review Comments returned by Lewis Palmer 38 | 
                
                    | 1/11/2023 2:04:43 PM | Request for Review Comments returned by Pikes Peak Regional Building Department | 
                
                    | 1/11/2023 12:59:33 PM | Request for Review Comments returned by Colorado Geological Survey | 
                
                    | 1/10/2023 5:04:27 PM | Request for Review Comments returned by PCD Engineering Division | 
                
                    | 1/10/2023 10:47:50 AM | Request for Review Comments returned by EPC Environmental Services | 
                
                    | 1/9/2023 10:33:03 AM | Request for Review Comments returned by Mountain View Electric Association, Inc. | 
                
                    | 1/5/2023 4:58:56 PM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo | 
                
                    | 12/22/2022 2:36:59 PM | Request for Review Comments returned by Parks Advisory Board | 
                
                    | 12/22/2022 2:35:39 PM | Request for Review Comments returned by EPC Parks Department | 
                
                    | 12/22/2022 10:27:07 AM | Request for Review Comments returned by Colorado Parks and Wildlife | 
                
                    | 12/21/2022 10:10:59 AM | Request for Review Comments returned by 911 Authority - El Paso/Teller County | 
                
                    | 12/21/2022 7:18:57 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO) | 
                
                    | 12/21/2022 7:18:53 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc. | 
                
                    | 12/21/2022 7:18:51 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Vicki Wood on behalf of Lewis Palmer 38 | 
                
                    | 12/21/2022 7:18:49 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Pamela Davis on behalf of El Paso County Conservation Dist | 
                
                    | 12/21/2022 7:18:47 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila | 
                
                    | 12/21/2022 7:18:44 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Cheryl Pixley on behalf of Black Forest Trails Association | 
                
                    | 12/21/2022 7:18:43 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Terry Stokka on behalf of Black Forest Land Use Committee | 
                
                    | 12/21/2022 7:18:41 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Bryan Jack on behalf of Black Forest Fire Protection District | 
                
                    | 12/21/2022 7:18:39 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department | 
                
                    | 12/21/2022 7:18:38 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County | 
                
                    | 12/21/2022 7:18:37 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife | 
                
                    | 12/21/2022 7:18:35 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey | 
                
                    | 12/21/2022 7:18:34 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources | 
                
                    | 12/21/2022 7:18:33 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by  on behalf of Parks Advisory Board | 
                
                    | 12/21/2022 7:18:31 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review | 
                
                    | 12/21/2022 7:18:30 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department | 
                
                    | 12/21/2022 7:18:29 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Joshua Palmer on behalf of EPC Public Works, County Engineer | 
                
                    | 12/21/2022 7:18:28 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by  on behalf of EPC Parks Department | 
                
                    | 12/21/2022 7:18:27 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by  on behalf of EPC Health Department | 
                
                    | 12/21/2022 7:18:23 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services | 
                
                    | 12/21/2022 7:18:22 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office | 
                
                    | 12/21/2022 7:18:21 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review | 
                
                    | 12/21/2022 7:18:19 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Ryan Howser on behalf of PCD Project Manager | 
                
                    | 12/21/2022 7:18:17 AM | Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division | 
                
                    | 12/17/2022 8:22:01 AM | Fees paid: 12/17/2022 (Receipt: 1007283) | 
                
                    | 12/16/2022 4:43:24 PM | Payment Request sent: 12/16/2022 | 
                
                    | 12/16/2022 4:43:17 PM | File # Assigned: SF2239 | 
                
                    | 12/16/2022 4:42:39 PM | Submission Triaged | 
                
                    | 12/16/2022 8:17:45 AM | Submission received from Applicant | 
                
                    | 12/14/2022 5:19:57 PM | Submission request sent to Applicant | 
                
                    | 12/14/2022 5:18:56 PM | Submission Triaged | 
                
                    | 12/14/2022 4:36:09 PM | Submission received from Applicant | 
                
                    | 12/14/2022 4:29:30 PM | Submission request sent to Applicant | 
                
                    | 12/14/2022 4:26:27 PM | Submission request sent to Applicant | 
                
                    | 12/14/2022 1:38:49 PM | Project Manager Assigned: Ryan Howser | 
                
                    | 10/20/2022 1:43:58 PM | Submission request sent to Applicant | 
                
                    | 10/20/2022 1:41:17 PM | Submission request canceled | 
                
                    | 9/7/2022 10:43:22 AM | Submission request sent to Applicant | 
                
                    | 8/18/2022 3:35:32 PM | Submission request sent to Applicant | 
                
                    | 3/23/2020 11:14:13 AM | Submission request sent to Applicant | 
                
                    | 3/23/2020 9:52:17 AM | Project reopened for Review Comments | 
                
                    | 2/19/2020 7:37:45 AM | Project Closed | 
                
                    | 2/19/2020 7:37:45 AM | Project Cancelled: 2/19/2020 | 
                
                    | 2/4/2019 1:36:42 PM | Submission request sent to Applicant | 
                
                    | 1/15/2019 3:27:42 PM | Project Manager Assigned: Gabe Sevigny | 
                
                    | 1/15/2019 3:27:42 PM | EA Assigned: EA-18-170 | 
                
                    | 1/15/2019 3:27:42 PM | Project Created |