7/9/2025 5:12:38 PM
|
Submission request sent to Applicant
|
6/27/2024 2:07:54 PM
|
Submission request sent to Applicant
|
6/27/2024 12:44:11 PM
|
Request for Review Comments returned by PCD Engineering Division
|
6/24/2024 4:53:40 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
6/12/2024 10:07:02 AM
|
Fees paid: 6/12/2024 (Receipt: 1009224)
|
6/11/2024 3:17:26 PM
|
Payment Request sent: 6/11/2024
|
6/11/2024 9:46:51 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Shannon Mustoe on behalf of EPC Stormwater Review
|
6/11/2024 9:46:49 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
6/11/2024 9:46:47 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Glenn Reese on behalf of EPC Stormwater Review
|
6/11/2024 9:46:45 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Christina Prete on behalf of EPC Stormwater Review
|
6/11/2024 9:46:40 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
6/11/2024 9:46:38 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Engineering Manager on behalf of PCD Engineering Division
|
6/7/2024 12:46:18 PM
|
Submission Triaged
|
6/6/2024 11:30:44 AM
|
Submission received from Applicant
|
5/30/2024 7:40:18 AM
|
Submission request sent to Applicant
|
5/29/2024 8:55:04 AM
|
Project reopened for Review Comments
|
11/14/2023 1:50:05 PM
|
Project Closed
|
11/14/2023 1:50:05 PM
|
Project Approved: 11/14/2023
|
11/9/2023 12:45:52 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
10/10/2023 7:15:37 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
|
10/10/2023 7:14:21 AM
|
Submission Triaged
|
10/6/2023 6:35:52 PM
|
Submission received from Applicant
|
10/6/2023 1:55:53 PM
|
Submission request sent to Applicant
|
10/6/2023 1:55:41 PM
|
Submission Triaged
|
10/6/2023 1:23:11 PM
|
Submission received from Applicant
|
10/5/2023 10:21:03 AM
|
Submission request sent to Applicant
|
9/26/2023 12:01:13 PM
|
Submission request sent to Applicant
|
9/26/2023 11:58:49 AM
|
Project reopened for Review Comments
|
9/22/2023 4:22:41 PM
|
Project Closed
|
9/22/2023 4:22:41 PM
|
Project Approved: 9/22/2023
|
9/12/2023 2:45:25 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
8/30/2023 5:09:05 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
|
8/30/2023 5:08:40 PM
|
Submission Triaged
|
8/30/2023 5:03:53 PM
|
Submission received from Applicant
|
7/19/2023 7:15:27 AM
|
Submission request sent to Applicant
|
7/18/2023 3:19:48 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/18/2023 3:14:36 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/12/2023 1:27:06 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
7/12/2023 1:26:16 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
6/29/2023 7:40:27 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
6/29/2023 7:40:27 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
6/29/2023 7:40:26 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
|
6/29/2023 7:40:26 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
|
6/29/2023 7:35:29 AM
|
Submission Triaged
|
6/28/2023 5:07:33 PM
|
Submission received from Applicant
|
6/23/2023 4:28:15 PM
|
Submission request sent to Applicant
|
6/22/2023 11:31:16 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
6/20/2023 2:35:34 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
6/19/2023 4:11:45 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
6/9/2023 8:58:06 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/2/2023 5:14:24 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
6/2/2023 11:45:21 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
6/1/2023 4:20:19 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/30/2023 3:50:30 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/24/2023 8:46:39 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
|
5/24/2023 8:45:57 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
5/24/2023 8:45:54 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Ryan Howser on behalf of PCD Project Manager
|
5/24/2023 8:45:51 AM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
5/24/2023 8:43:46 AM
|
Submission Triaged
|
5/24/2023 8:02:26 AM
|
Submission received from Applicant
|
5/19/2023 8:08:30 AM
|
Submission request sent to Applicant
|
5/18/2023 4:05:00 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/17/2023 4:31:23 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/17/2023 4:10:34 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
5/17/2023 2:34:51 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/3/2023 6:29:52 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
5/2/2023 10:25:35 AM
|
Request for Review Comments email resent for Project Terra Ridge North Final Plat (Minor) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
5/2/2023 9:14:43 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/28/2023 10:07:56 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/27/2023 1:43:28 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by PJ Langmaid on behalf of Black Forest Fire Protection District
|
4/27/2023 1:43:27 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
4/27/2023 1:43:25 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
4/27/2023 1:43:23 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
4/27/2023 1:43:17 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Edi Anderson on behalf of EPC County Attorney's Office
|
4/27/2023 1:43:16 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Lori Seago on behalf of County Attorney - Development Review
|
4/27/2023 1:43:15 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Ryan Howser on behalf of PCD Project Manager
|
4/27/2023 1:43:12 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat (Minor) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/27/2023 1:41:18 PM
|
Submission Triaged
|
4/27/2023 10:44:37 AM
|
Submission received from Applicant
|
4/21/2023 2:07:14 PM
|
Submission request sent to Applicant
|
4/13/2023 4:11:12 PM
|
Request for Review Comments returned by Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
3/21/2023 2:35:00 PM
|
Submission request sent to Applicant
|
3/21/2023 2:30:27 PM
|
Request for Review Comments returned by PCD Project Manager
|
3/20/2023 4:39:19 PM
|
Request for Review Comments returned by PCD Engineering Division
|
3/20/2023 8:02:43 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/17/2023 3:59:37 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/16/2023 9:45:22 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/6/2023 11:52:59 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
3/6/2023 3:45:01 AM
|
Request for Review Comments returned by EPC County Attorney's Office
|
3/2/2023 4:34:29 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
3/2/2023 11:22:00 AM
|
Request for Review Comments returned by EPC Environmental Services
|
2/24/2023 2:22:27 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
2/24/2023 2:22:24 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
2/24/2023 2:22:23 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
2/24/2023 2:22:22 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
2/24/2023 2:22:19 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Bryan Jack on behalf of Black Forest Fire Protection District
|
2/24/2023 2:22:18 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
2/24/2023 2:22:15 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/24/2023 2:22:14 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Ryan Howser on behalf of PCD Project Manager
|
2/24/2023 2:22:11 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/24/2023 2:16:56 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
2/24/2023 2:16:53 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
2/24/2023 2:16:51 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
2/24/2023 2:16:49 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
2/24/2023 2:16:46 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
2/24/2023 2:16:45 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
2/24/2023 2:16:44 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Ryan Howser on behalf of PCD Project Manager
|
2/24/2023 2:16:41 PM
|
Request for Review Comments email sent for Project Terra Ridge North Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
2/24/2023 2:13:48 PM
|
Submission Triaged
|
2/24/2023 2:09:21 PM
|
Submission received from Applicant
|
2/24/2023 1:37:26 PM
|
Request for Review Comments returned by EPC Health Department
|
2/24/2023 10:36:06 AM
|
Submission request sent to Applicant
|
2/24/2023 10:35:57 AM
|
Submission Triaged
|
2/23/2023 5:16:38 PM
|
Submission received from Applicant
|
2/21/2023 2:55:59 PM
|
Submission request sent to Applicant
|
1/24/2023 8:57:20 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/23/2023 7:32:40 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
1/20/2023 4:34:24 PM
|
Request for Review Comments returned by EPC County Attorney's Office
|
1/19/2023 12:06:44 PM
|
Submission request sent to Applicant
|
1/19/2023 12:04:18 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/12/2023 5:05:38 PM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
1/12/2023 4:41:26 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/11/2023 3:39:57 PM
|
Request for Review Comments returned by Lewis Palmer 38
|
1/11/2023 2:04:43 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/11/2023 12:59:33 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
1/10/2023 5:04:27 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/10/2023 10:47:50 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/9/2023 10:33:03 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/5/2023 4:58:56 PM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Christopher Grosso on behalf of US Army Corps of Engineers-Pueblo
|
12/22/2022 2:36:59 PM
|
Request for Review Comments returned by Parks Advisory Board
|
12/22/2022 2:35:39 PM
|
Request for Review Comments returned by EPC Parks Department
|
12/22/2022 10:27:07 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
12/21/2022 10:10:59 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
12/21/2022 7:18:57 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Tom Vierzba on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)
|
12/21/2022 7:18:53 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Cathy Hansen Lee on behalf of Mountain View Electric Association, Inc.
|
12/21/2022 7:18:51 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Vicki Wood on behalf of Lewis Palmer 38
|
12/21/2022 7:18:49 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Pamela Davis on behalf of El Paso County Conservation Dist
|
12/21/2022 7:18:47 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
12/21/2022 7:18:44 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
12/21/2022 7:18:43 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
12/21/2022 7:18:41 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Bryan Jack on behalf of Black Forest Fire Protection District
|
12/21/2022 7:18:39 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by RBD Enumerations & Floodplain on behalf of Pikes Peak Regional Building Department
|
12/21/2022 7:18:38 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
12/21/2022 7:18:37 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Energy and Land Use Specialist Karen Voltura on behalf of Colorado Parks and Wildlife
|
12/21/2022 7:18:35 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
12/21/2022 7:18:34 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
12/21/2022 7:18:33 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by on behalf of Parks Advisory Board
|
12/21/2022 7:18:31 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/21/2022 7:18:30 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
12/21/2022 7:18:29 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Joshua Palmer on behalf of EPC Public Works, County Engineer
|
12/21/2022 7:18:28 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by on behalf of EPC Parks Department
|
12/21/2022 7:18:27 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by on behalf of EPC Health Department
|
12/21/2022 7:18:23 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Kathy Andrew on behalf of EPC Environmental Services
|
12/21/2022 7:18:22 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Edi Anderson on behalf of EPC County Attorney's Office
|
12/21/2022 7:18:21 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Lori Seago on behalf of County Attorney - Development Review
|
12/21/2022 7:18:19 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Ryan Howser on behalf of PCD Project Manager
|
12/21/2022 7:18:17 AM
|
Request for Review Comments email sent for Project Miles Subdivision Final Plat for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/17/2022 8:22:01 AM
|
Fees paid: 12/17/2022 (Receipt: 1007283)
|
12/16/2022 4:43:24 PM
|
Payment Request sent: 12/16/2022
|
12/16/2022 4:43:17 PM
|
File # Assigned: SF2239
|
12/16/2022 4:42:39 PM
|
Submission Triaged
|
12/16/2022 8:17:45 AM
|
Submission received from Applicant
|
12/14/2022 5:19:57 PM
|
Submission request sent to Applicant
|
12/14/2022 5:18:56 PM
|
Submission Triaged
|
12/14/2022 4:36:09 PM
|
Submission received from Applicant
|
12/14/2022 4:29:30 PM
|
Submission request sent to Applicant
|
12/14/2022 4:26:27 PM
|
Submission request sent to Applicant
|
12/14/2022 1:38:49 PM
|
Project Manager Assigned: Ryan Howser
|
10/20/2022 1:43:58 PM
|
Submission request sent to Applicant
|
10/20/2022 1:41:17 PM
|
Submission request canceled
|
9/7/2022 10:43:22 AM
|
Submission request sent to Applicant
|
8/18/2022 3:35:32 PM
|
Submission request sent to Applicant
|
3/23/2020 11:14:13 AM
|
Submission request sent to Applicant
|
3/23/2020 9:52:17 AM
|
Project reopened for Review Comments
|
2/19/2020 7:37:45 AM
|
Project Closed
|
2/19/2020 7:37:45 AM
|
Project Cancelled: 2/19/2020
|
2/4/2019 1:36:42 PM
|
Submission request sent to Applicant
|
1/15/2019 3:27:42 PM
|
Project Manager Assigned: Gabe Sevigny
|
1/15/2019 3:27:42 PM
|
EA Assigned: EA-18-170
|
1/15/2019 3:27:42 PM
|
Project Created
|