Project Review Comments

Back to List


Project Name
Davis Ranch
Description
Owner would like to subdivide the 2 parcels and plat into smaller 2.5 acre lots. With this, we will need to rezone to RR-2.5. In addition, the owner would like to rezone the north-west corner to CS for RV storage and self storage concept. See attached plans. Open to other options for zoning that allows this use. Need to know all the requirements and timing for this proposal.
Location
14850 Judge Orr Rd
Parcels
4200000493 4200000493 4233000031 4233000031
Applicant
Hammers Construction
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
EA Number
EA2632
Project Manager
Maria Lancto
Status
Active
Created
3/10/2026 3:32:04 PM

View: Project Documents



Review Comments (1)

Link Agency Review # Comment
RBD Floodplain
3/25/2026 1:35:49 PM
1 RBC313.18.5 Subdivision Proposals.
FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on plats
for subdivision proposals and other proposed developments that contain at least fifty lots or five (5) acres, whichever is less;
All buildable lots less than two and one half (2½) acres in size are required to be located entirely outside of the 100-year floodplain. Lands within the 100-year floodplain shall be established in a tract, and require that the owner maintain the tract. Buildable lots two and one half (2½) acres and larger, are required to have the 100-year floodplain contained in a drainage easement dedicated by plat in the name of the governing body with the restrictions of “No Build” and “No Storage of any Materials”;

The parcel is located within the current effective Zone A floodplain with no BFEs(no supporting model available). Draft model backed BFEs for this area have been developed as part of Phase 1 for the ongoing El Paso County, CO, Risk MAP Project”. The data has been reviewed and approved through FEMA’s QA/QC process (May 11, 2022) and is currently in the MIP (Case No. 19-08-0037s). The Phase 1/Base Level Engineering outputs and Zone A ready deliverables are, under the following folder:
K:/FY2019/19-08-0037S/Discovery - BLE - El Paso and Teller Counties, CO - FY18 - 04/Discovery Data Capture - Discovery Data Capture - El Paso and Teller Counties, CO - 01/El Paso_Discovery_1

BFEs from the aforementioned study should be shown on the final plat to comply with RBC 313.18.5
3/25/2026 1:35:49 PM