Project Review Comments
- File Number
- PPR269
- Project Name
- PPR for Outside Storage 625 Slocum RD
- Description
- Less than 1 acre, resolving CE2648
- Parcels
- 4412003003 4412003003
- Applicant
-
Patrick McCarthy
Patrick McCarthy ( pjm1255@gmail.com )
(303) 596-1371 Patrick McCarthy ( pjm1255@gmail.com )
(303) 596-1371 - File Number
- PPR269
- Project Manager
- Jen Uhler
- Status
- Active
- Created
- 2/23/2026 4:28:40 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
| View |
PCD Project Manager
4/7/2026 8:32:23 AM |
1 |
Planning has reviewed the proposal and has comments on the following documents: - Letter of Intent - Site Development Plan Stormwater and Engineering comments can also be found on the attached documents. Jen Uhler PCD Planner 719-520-7952 jenuhler@elpasoco.com |
4/7/2026 8:32:23 AM |
|
EPC DPW Stormwater
4/6/2026 12:25:18 PM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Site development plan Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com |
4/6/2026 12:25:18 PM | |
|
EPC DPW Development Services - Engineering
4/6/2026 9:04:07 AM |
1 |
PPR269: PPR for Outside Storage 625 Slocum RD DPW – DS – Engineering Review 1. Engineering Comments have been provided on the following documents (to be uploaded by Project Manager). - Letter of Intent - Site Development Plan - Road Impact Fee Acknowledgement form The applicant must upload the revised and missing items indicated below with his/her resubmittal: - Letter of Intent - Site Development Plan - Road Impact Fee Acknowledgement form including the RIF calculations). - (Missing) Provide documentations if you already pulled a permit for the existing driveway. Reviewed by: Jalal Jalal Saleh, PE jalalsaleh@elpasoco.com 719-520-7550 |
4/6/2026 9:04:07 AM | |
| View |
Mountain View Electric Association, Inc.
4/2/2026 5:01:12 PM |
1 | See attached comment | 4/2/2026 5:01:12 PM |
|
Pikes Peak Regional Building Department
3/31/2026 8:50:55 AM |
1 |
Enumerations has no objection or comments for this project. Becky Allen PPRBD - Enumerations beckya@pprbd.org 719-799-2707 |
3/31/2026 8:50:55 AM | |
|
Ellicott Fire Protection District
3/30/2026 1:26:51 PM |
1 |
Ellicott Fire Department comments: 1. Provide fire flow details on the noted hydrant located near the proposed structure on the Site Plan. The 3,200 square foot, VB building requires 1500 gpm at 20 psi for two hours or a calculation meeting the requirements of NFPA 1142. 2. Provide road details to meet the requirements of the 2015 IFC Appendix D. 3. This site is in a moderate intensity fire area per the Colorado Wildfire Resiliency Code. This may affect the usable materials for the exterior of the building and the surrounding vegetation. For questions please contact: efpdplanreview@gmail.com |
3/30/2026 1:26:51 PM |
EDARP