Project Review Comments

Back to List


File Number
VR262
Project Name
7886 Rannoch Moor Way Vacation of 20ft Drainage Easement
Description
The applicant has requested to remove a 20ft drainage easement from Lot 151 HIGHLAND PARK FIL NO 3.
Parcels
5228005025 5228005025
Applicant
John Fornander
john@tnesinc.com ( john@tnesinc.com ) john@tnesinc.com ( john@tnesinc.com )
File Number
VR262
Project Manager
Joe Letke
Status
Active
Created
1/12/2026 4:27:36 PM

View: Project Documents | Submit/View Public Comment



Review Comments (14)

Link Agency Review # Comment
PCD Project Manager
4/16/2026 3:10:21 PM
1 Planning has minor comments on the LOI and Plat Drawings. Please add "PCD File No. VR262" to both documents.

Joe Letke
Planner
JoeLetke@elpasoco.com
4/16/2026 3:10:21 PM
View EPC DPW Stormwater
4/16/2026 2:00:01 PM
1 Drainage Letter Comments 4/16/2026 2:00:01 PM
View EPC DPW Stormwater
4/16/2026 1:58:23 PM
1 SWMP Checklist Comments 4/16/2026 1:58:23 PM
View EPC DPW Stormwater
4/16/2026 1:58:06 PM
1 SWMP Comments 4/16/2026 1:58:06 PM
View EPC DPW Stormwater
4/16/2026 1:57:52 PM
1 GEC Checklist comments 4/16/2026 1:57:52 PM
View EPC DPW Stormwater
4/16/2026 1:57:34 PM
1 GEC Plan Comments 4/16/2026 1:57:34 PM
View EPC DPW Stormwater
4/16/2026 1:56:22 PM
1 ESQCP Comments 4/16/2026 1:56:22 PM
EPC DPW Development Services - Engineering
4/16/2026 1:24:50 PM
1 VR262: 7886 Rannoch Moor Way Vacation of 20ft Drainage Easement
EPC DPW DS- Engineering
Review 1


Engineering Comments have been provided on the following documents (to be uploaded by Project Manager):


V1- Drainage letter
V1- GEC Plan


Applicant Notes:


The applicant must upload the revised and missing items indicated below with his/her resubmittal:

V2 - Drainage letter
V2 - GEC Plan
V2 - (Missing) FAE, use the 2026 version

FYI:
1. The ECM Administrator will sign and date the plans, reports, and documents after you make your final submittal (make sure all comments are addressed before you make your final submittal and the plans, reports, and documents have no additional comments).

Reviewed by:


Jalal Saleh, PE, MBA, Senior Engineer
EPC DPW DS-Engineering
jalalsaleh@elpasoco.com
719-520-7550
4/16/2026 1:24:50 PM
EPC DPW Stormwater
4/16/2026 1:55:15 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report
- ESQCP
- GEC Plan
- GEC Checklist
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal (the planner will need to send an upload request):
- FAE
- GEC Checklist
- PCM Applicability Form
- SWMP Checklist

Reviewed by:
Mikayla Hartford, P.E.
Engineer - Stormwater
719.339.5053
MikaylaHartford@elpasoco.com
4/16/2026 1:55:15 PM
Pikes Peak Regional Building Department
4/15/2026 2:04:10 PM
1 Enumerations has no objection to this vacation/replat. The existing address will not change as a result of this vacation/replat. Enumerations will review the replat prior to recording per usual procedure. No Enumerations fee is due at the time of review.

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
4/15/2026 2:04:10 PM
EPC Parks Department
4/10/2026 3:12:47 PM
1 Thank you for the opportunity to review the Vacate and Replat of a drainage easement!

Upon reviewing the project and site location, El Paso County Parks staff has found that there are no immediate impacts to El Paso County parks, trails, open space, or other El Paso County Parks related items. Additionally, no parks fees will be required since no new lots are being created with this project.

El Paso County Parks staff will not have comments regarding this project.

Thank you!

Ashlyn Mathy
Parks Planner
Park Planning Division
El Paso County Parks Department
ashlynmathy@elpasoco.com
4/10/2026 3:12:47 PM
Black Forest Fire Protection District
4/5/2026 6:37:58 PM
1 BFFRPD (Black Forest Fire Rescue Protection District) has reviewed the proposed project and has no comments. The project requested does not affect standard operating procedures in respect to fire department access and/or fire protection water supplies.

Be advised, as of April 1st, 2026, the Colorado Wildfire Resiliency Code (CWRC) takes effects and although IFC 2015 is currently adopted, BFFRPD is currently in the process of transitioning to the 2021 IFC and adopting the CWRC. It may be prudent for applicant to abide by 2021 IFC requirements to prevent shortcomings in building requirements if 2021 IFC is adopted prior to construction.
4/5/2026 6:37:58 PM
View EPC Environmental Services
4/3/2026 2:23:50 PM
1 4/3/2026 2:23:50 PM
PCD Administrative Notice
4/2/2026 12:53:35 PM
1 On 04/02/2026, PCD mailed "Notice of Administrative Determination" letters for VR262 to surrounding property owners within a 500-foot range (14 addresses). The potential date an administrative decision can be made is 04/16/2025. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $10.36. JM 4/2/2026 12:53:35 PM