Project Review Comments
- Project Name
- 1015 Valley St - Covered parking and curb cut
- Description
- New Fire Station (UXXX) wants to add covered parking structures and changes to the curb cut. Related to PPR01033.
- Location
- Parcels
- 5407202012 5407202012
- Applicant
-
YOW Architects
Planner Brad Nichols ( bnichols@yowarch.com )
(719) 623-1416 Planner Brad Nichols ( bnichols@yowarch.com )
(719) 623-1416 - File Number
- COM2520
- Project Manager
- Lacey Dean
- Status
- Active
- Created
- 8/13/2025 10:20:40 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC DPW Development Services - Engineering
9/17/2025 5:53:45 PM |
Site Plan comments (Planning and Engineering comments) | 9/17/2025 5:53:45 PM |
View |
EPC DPW Development Services - Engineering
9/17/2025 5:45:55 PM |
RIF Acknowledgement Form comments | 9/17/2025 5:45:55 PM |
View |
EPC DPW Development Services - Engineering
9/17/2025 5:52:29 PM |
Deviation request template | 9/17/2025 5:52:29 PM |
View |
PCD Project Manager
9/17/2025 3:13:24 PM |
V1_Letter of _comments | 9/17/2025 3:13:24 PM |
PCD Project Manager
9/17/2025 3:12:13 PM |
Review 1: EPC Planning Division has comments in green text boxes on the following documents: - Letter of Intent (copied from the LOI submitted with associated Approval of Location project U251) - Site Plan Drawing (documents with comments will be uploaded by the Engineer with their review comments) Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com |
9/17/2025 3:12:13 PM | |
EPC DPW Development Services - Engineering
9/17/2025 5:40:40 PM |
Review 1. Engineering comments on the following documents: - Site Plan Drawing - RIF Acknowledgement Form Additional documents required to be submitted with the next review: - Deviation Request (template uploaded) Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
9/17/2025 5:40:40 PM | |
EPC DPW Stormwater
8/28/2025 3:16:06 PM |
Review 1: The proposed disturbances and development is well under 1ac. The proposed improvements will are redevelopment of existing developed land with no additional imperviousness. The site was fully developed prior to 2008. So the cumulative development post-2008 plus the proposed development is well under 1ac. So an ESQCP and PCM are not required. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
8/28/2025 3:16:06 PM |