Project Review Comments
- File Number
- ASB2553
- Project Name
- Walden Preserve 2, Filing No. 5 Final Plat
- Description
- Final Plat associated with amendments to preliminary plan SP163; PUD187
- Parcels
- 6115000008 6115000008
- Applicant
-
JPS Engineering, Inc.
John Schwab ( john@jpsengr.com )
(719) 477-9429 John Schwab ( john@jpsengr.com )
(719) 477-9429 - File Number
- ASB2553
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 7/28/2025 1:57:36 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
EPC DPW Asset Management
7/6/2026 7:55:48 AM |
2 |
We have reviewed your case and given your circumstances, we are prepared to accept your CAD files as is. Please note that El Paso County is working to update and clarify the language in the Engineering Criteria Manual (ECM) to require CAD files and drawings to be submitted in the county’s defined coordinate system of Colorado State Plane Central Zone and with a layer that clearly denotes your site monuments that conform to Section 5.10.5.C of the ECM below. 5.10.5.C: Monument Caps and Data All monuments shall be metallic caps stamped with the registered business name or the letters "L.S." followed by the registration number of the surveyor in charge. All monuments shall include state plane coordinate and elevation information meeting County GIS Standards along with any information required by State law. As we prepare for this update, we are asking that you begin to deliver to us CAD files and drawings that meet these standards. This will help ensure a smooth transition as we work to incorporate these changes into our standard language in the ECM. Good day, Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
7/6/2026 7:55:48 AM | |
| View |
EPC DPW Stormwater
4/2/2026 8:44:16 PM |
1 | PCM Certification Letter | 4/2/2026 8:44:16 PM |
| View |
EPC DPW Stormwater
4/2/2026 8:43:58 PM |
1 | Engineering Record Drawings (As-Builts) | 4/2/2026 8:43:58 PM |
|
EPC DPW Stormwater
4/2/2026 8:43:35 PM |
1 |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Engineering Record Drawings (As-Builts) - PCM Certification Letter Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com |
4/2/2026 8:43:35 PM | |
|
EPC DPW Development Services - Inspections
4/2/2026 3:26:11 PM |
1 |
Please see the markups to the plans attached Please upload all concrete testing Brad Walters Inspections Supervisor |
4/2/2026 3:26:11 PM | |
|
EPC DPW Development Services - Engineering
4/2/2026 8:57:52 AM |
1 |
Development Services Engineering has comments on the following documents (to be uploaded by Stormwater Engineer): - Engineering Record Drawings Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com |
4/2/2026 8:57:52 AM | |
|
EPC DPW Asset Management
3/23/2026 8:34:56 AM |
1 |
Please update the CAD so that it’s in Colorado State Plane Central zone coordinates and include horizontal control points. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
3/23/2026 8:34:56 AM |
EDARP