Project Review Comments

Back to List


File Number
COM2515
Project Name
Peaceful Ridge Development Retaining Wall COM
Description
This project is a COM for a retaining wall that exceeds 7 feet in height. Wall location approved with CDRS for Plat and improvements to Marksheffel Road
Parcels
5515403091 5515403091
Applicant
Fernando Guerrero
Paul Gaul ( paul.gaul@slatonbros.com )
(303) 806-8160
Paul Gaul ( paul.gaul@slatonbros.com )
(303) 806-8160
File Number
COM2515
Project Manager
Kari Parsons
Status
Closed
Created
6/27/2025 1:55:50 PM

View: Project Documents



Review Comments (12)

Link Agency Review # Comment
EPC DPW Development Services - Engineering
9/11/2025 2:56:34 PM
3 Review 3.

Engineering comments have been resolved. No re-review necessary.

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
9/11/2025 2:56:34 PM
EPC DPW Stormwater
9/10/2025 5:23:21 PM
3 EPC Stormwater still has no comments. 9/10/2025 5:23:21 PM
View EPC DPW Development Services - Engineering
9/8/2025 2:58:47 PM
2 Structural Plan comments 9/8/2025 2:58:47 PM
View EPC DPW Development Services - Engineering
9/8/2025 2:58:19 PM
2 Site Plan comments 9/8/2025 2:58:19 PM
EPC DPW Stormwater
9/8/2025 10:19:45 AM
2 EPC Stormwater still has no comments. 9/8/2025 10:19:45 AM
EPC DPW Development Services - Engineering
9/8/2025 2:59:54 PM
2 Review 2.
Engineering comments on the following documents:
- Soils Report
- Structural Plan
- Site Plan

Structural Plan and Site Plan comments uploaded in separate documents. Soils report comments here since ENTECH report is locked for comments:
Engineering comment is unresolved on the Soils report. It appears the same report was resubmitted. The report does not include a discussion/analysis of the 100 year storm water depth in the pond and whether the standing water would have any impact on the stability (lateral, buoyancy, etc.) of the retaining wall. Either the original report can be updated to include the requested information or a Soils Memorandum, certified and sealed by a CO professional, can be submitted with this information.


Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
9/8/2025 2:59:54 PM
PCD Project Manager
9/8/2025 7:12:02 AM
2 Defer to Engineering. Please contact Joe Sandstrom for questions on his comments 9/8/2025 7:12:02 AM
View EPC DPW Development Services - Engineering
7/23/2025 12:36:56 PM
1 Soils Report comments 7/23/2025 12:36:56 PM
View EPC DPW Development Services - Engineering
7/23/2025 12:36:40 PM
1 Site Plan comments 7/23/2025 12:36:40 PM
View EPC DPW Development Services - Engineering
7/23/2025 12:36:20 PM
1 Structural Plan comments 7/23/2025 12:36:20 PM
EPC DPW Development Services - Engineering
7/23/2025 12:34:33 PM
1 Review 1.

Engineering comments in blue on the following documents:
- Site Plan Drawing
- Structural Plans
- Soils Report

Project Manager: Please allow optional/additional documents to be uploaded with resubmittal.

Reviewed by:
Joe Sandstrom, EI, Associate Engineer
josephsandstrom@elpasoco.com
(719) 520-6314
7/23/2025 12:34:33 PM
EPC DPW Stormwater
7/22/2025 7:58:31 AM
1 EPC Stormwater has no comments.

Reviewed by:
Christina Prete, P.E.
Stormwater Manager
ChristinaPrete@elpasoco.com
7/22/2025 7:58:31 AM