Project Review Comments

Back to List


Project Name
Tri-State Crosspoint Substation 1041
Description
Tri-State Generation and Transmission Association, Inc (Tri-State) is proposing a new 230-kV substation that sectionalizes the existing 230-kV Lincoln – Midway transmission line in El Paso County. The Project is being developed to increase the load serving capability for Tri-State’s Member, Mountain View Electric Association (MVEA), related to substantial residential growth east of Colorado Springs. The current 69-kV system is served by two delivery points at Falcon and Calhan that are increasingly incapable of serving the system and cannot maintain voltage in a contingency situation. The Project is also being developed to improve system reliability for Tri-State’s Member, Southeast Colorado Power Association (SECPA). SECPA’s 69-kV Edison Delivery Point is sourced from MVEA at the Edison Tap, which is 17 miles away, and from Calhan which is 20 miles away - the extended 69-kV system increases exposure and impacts to the system from line faults.
Location
Parcels
1400000592 1400000592
Applicant
Ulteig
Derek Holscher ( derek.holscher@ulteig.com )
(720) 873-5876
Derek Holscher ( derek.holscher@ulteig.com )
(720) 873-5876
EA Number
EA23124
File Number
AASI251
Project Manager
Ryan Howser
Status
Active
Created
3/4/2025 2:14:48 PM

View: Project Documents



Review Comments (25)

Link Agency Comment
View PCD Project Manager
4/15/2025 8:56:30 AM
V1: Attachment N - Project Maps 4/15/2025 8:56:30 AM
View PCD Project Manager
4/15/2025 8:56:10 AM
V1: Attachment H - Drainage Report 4/15/2025 8:56:10 AM
View PCD Project Manager
4/15/2025 8:55:52 AM
V1: Attachment G - Design Drawings 4/15/2025 8:55:52 AM
View PCD Project Manager
4/15/2025 8:55:32 AM
V1: Attachment C - TIS 4/15/2025 8:55:32 AM
View PCD Project Manager
4/15/2025 8:55:06 AM
V1: Attachment B - Application 4/15/2025 8:55:06 AM
View PCD Project Manager
4/15/2025 8:54:48 AM
V1: 1041 Documents Related to 5.201 and 5.202 4/15/2025 8:54:48 AM
View PCD Project Manager
4/15/2025 8:54:28 AM
V1: 1041 Documents Related to 2.303 and 2.405 4/15/2025 8:54:28 AM
PCD Project Manager
4/15/2025 8:53:58 AM
Review 1: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- 1041 Documents Related to 2.303 and 2.405
- 1041 Documents Related to 5.201 and 5.202
- Attachment B - Application
- Attachment C - TIS
- Attachment G - Design Drawings
- Attachment H - Drainage Report (engineering and stormwater comments only)
- Attachment N - Project Maps
4/15/2025 8:53:58 AM
EPC DPW Development Services - Engineering
4/14/2025 5:37:15 PM
Engineering review 1 has comments on the following documents (to be uploaded by the Project Manager):

- Traffic Impact Study
- Drainage Report
- Design Drawings

Reviewed by:
Bret Dilts, PE
bredilts@elpasoco.com
719-520-6864
4/14/2025 5:37:15 PM
Colorado Springs Airport Advisory Commission
4/14/2025 10:17:49 AM
No comments, outside of airport overlay 4/14/2025 10:17:49 AM
County Attorney - 1041
4/14/2025 8:21:56 AM
No comments from County Attorney – Development Review at this time.

Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com
4/14/2025 8:21:56 AM
View Colorado Parks and Wildlife
4/11/2025 12:52:34 PM
4/11/2025 12:52:34 PM
EPC DPW Stormwater
4/14/2025 4:05:26 PM
Review 1: EPC DPW Stormwater does not have any comments regarding the approval of this special interest application. However, I have provided preliminary comments on the following documents that you can revise prior to your PPR or CDR submittal, where all construction documents will be required and reviewed.
- CDs...(to be uploaded by Ryan)
- Drainage Report...(to be uploaded by Ryan)

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
4/14/2025 4:05:26 PM
Colorado Geological Survey
4/4/2025 2:51:25 PM
No geologic hazards are present that would preclude the proposed Crosspoint Substation project (38.844, -104.242). The characterization of subsurface conditions and geotechnical recommendations in Terracon's Geotechnical Engineering Report, Tri-State Crosspoint Substation #3570, East of Calhan Highway, and West of North Lauppe Road, El Paso County, Colorado (Terracon Project No. 23245062, August 8, 2024) are valid. Provided Terracon's recommendations are adhered to, the Colorado Geological Survey has no objection to approval of AASI251. 4/4/2025 2:51:25 PM
View USAFA Base Planner
4/3/2025 8:02:29 AM
Thank you for sending USAFA the “Tri-State Crosspoint Substation 1041” project review request (File #: AASI251). As this project is in close vicinity of Bullseye’s flight training and activities, we request that the developer includes a noise notice and avigation easement. The instructions to complete these requests are attached in EDARP. Please note that USAFA would like to be informed of the future construction for the proposed MEVA and SECPA powerlines that were referenced in this application. 4/3/2025 8:02:29 AM
Pikes Peak Regional Building Department
3/25/2025 4:11:18 PM
Address to the parcel will be 780 N. Lauppe Road.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
3/25/2025 4:11:18 PM
Schriever AFB
3/21/2025 8:20:31 AM
No comments. 3/21/2025 8:20:31 AM
EPC Parks Department
3/20/2025 8:24:23 AM
El Paso County Parks and Community Services has reviewed the 1041 application and has no comments. This application does not have any substantial impact on the El Paso County Parks Master Plan. 3/20/2025 8:24:23 AM
View Colorado Department of Public Health and Environment
3/19/2025 11:12:59 AM
3/19/2025 11:12:59 AM
911 Authority - El Paso/Teller County
3/19/2025 9:09:19 AM
No action for E911 on this submittal.
Thank you.
Justin
3/19/2025 9:09:19 AM
View EPC Environmental Services
3/18/2025 2:50:16 PM
3/18/2025 2:50:16 PM
PCD Administrative Notice
3/18/2025 1:59:31 PM
On 03/18/2025, PCD mailed "Notice of Administrative Determination" letters for AASI257 to surrounding property owners within a 500-foot range (17 addresses). The potential date an administrative decision can be made is 04/01/2025. Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage = $11.73 JM 3/18/2025 1:59:31 PM
Mountain View Electric Association, Inc.
3/18/2025 11:39:59 AM
MVEA will continue to work with Tri-State on this development 3/18/2025 11:39:59 AM
Colorado Department of Transportation - Pueblo Office
3/17/2025 9:41:06 AM
We are in receipt of the above-referenced development submittal. After review of the provided documents, CDOT Staff currently has NO COMMENT pertaining to this submittal. 3/17/2025 9:41:06 AM
Meadow Lake Airport Association
3/14/2025 4:04:08 PM
No comments ... Project location appears to be well outside the Meadow Lake Airport traffic area and Airport Influence Area.
Thank you.
3/14/2025 4:04:08 PM