8/5/2025 11:36:14 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
|
8/5/2025 11:36:13 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
8/5/2025 11:36:12 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Amy Kelley on behalf of USAFA Base Planner
|
8/5/2025 11:36:11 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of USAFA Base Planner
|
8/5/2025 11:30:10 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
|
8/5/2025 11:30:09 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
|
8/5/2025 11:29:41 AM
|
Submission Triaged
|
8/1/2025 12:32:15 PM
|
Submission received from Applicant
|
7/18/2025 10:39:33 AM
|
Submission request sent to Applicant
|
7/18/2025 9:56:14 AM
|
Request for Review Comments returned by EPC DPW Development Services - Engineering
|
7/11/2025 7:20:42 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
|
7/11/2025 7:20:41 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
|
7/11/2025 7:19:54 AM
|
Submission Triaged
|
7/10/2025 5:17:01 PM
|
Submission received from Applicant
|
7/9/2025 1:35:57 PM
|
Submission request sent to Applicant
|
7/9/2025 1:30:02 PM
|
Request for Review Comments returned by EPC DPW Development Services - Engineering
|
7/9/2025 11:58:09 AM
|
Request for Review Comments returned by USAFA Base Planner
|
7/9/2025 9:24:22 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/27/2025 2:36:23 PM
|
Request for Review Comments returned by County Attorney - 1041
|
6/26/2025 1:38:26 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
6/25/2025 7:09:25 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
|
6/25/2025 7:09:24 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
6/25/2025 7:09:23 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Amy Kelley on behalf of USAFA Base Planner
|
6/25/2025 7:09:22 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of USAFA Base Planner
|
6/25/2025 7:09:20 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
|
6/25/2025 7:09:19 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
|
6/25/2025 7:09:16 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of County Attorney - 1041
|
6/25/2025 7:09:15 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Erika Keech on behalf of County Attorney - 1041
|
6/25/2025 7:09:14 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of County Attorney - 1041
|
6/25/2025 7:09:12 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Justin Kilgore on behalf of PCD Project Manager
|
6/25/2025 7:08:10 AM
|
Submission Triaged
|
6/24/2025 5:28:18 PM
|
Submission received from Applicant
|
6/10/2025 10:07:32 AM
|
Submission request sent to Applicant
|
6/10/2025 10:06:49 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/10/2025 9:57:44 AM
|
Request for Review Comments returned by USAFA Base Planner
|
6/9/2025 1:09:09 PM
|
Request for Review Comments returned by EPC DPW Development Services - Engineering
|
6/4/2025 8:28:53 AM
|
Request for Review Comments returned by County Attorney - 1041
|
6/2/2025 8:13:48 AM
|
Request for Review Comments returned by EPC DPW Stormwater
|
5/20/2025 8:13:42 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
|
5/20/2025 8:13:41 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
5/20/2025 8:13:40 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Amy Kelley on behalf of USAFA Base Planner
|
5/20/2025 8:13:39 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of USAFA Base Planner
|
5/20/2025 8:13:37 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
5/20/2025 8:13:36 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Zachary Jannusch on behalf of EPC DPW Stormwater
|
5/20/2025 8:13:35 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Mikayla Hartford on behalf of EPC DPW Stormwater
|
5/20/2025 8:13:34 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Glenn Reese on behalf of EPC DPW Stormwater
|
5/20/2025 8:13:33 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Christina Prete on behalf of EPC DPW Stormwater
|
5/20/2025 8:13:32 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
|
5/20/2025 8:13:31 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
|
5/20/2025 8:13:28 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of County Attorney - 1041
|
5/20/2025 8:13:27 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Erika Keech on behalf of County Attorney - 1041
|
5/20/2025 8:13:26 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of County Attorney - 1041
|
5/20/2025 8:13:24 AM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Justin Kilgore on behalf of PCD Project Manager
|
5/20/2025 8:10:04 AM
|
Submission Triaged
|
5/16/2025 5:24:47 PM
|
Submission received from Applicant
|
5/4/2025 7:42:11 PM
|
Request for Review Comments returned by EPC Health Department
|
4/15/2025 9:47:48 AM
|
Request for Review Comments returned by County Attorney - 1041
|
4/15/2025 9:00:57 AM
|
Submission request sent to Applicant
|
4/15/2025 8:58:20 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/14/2025 5:37:42 PM
|
Request for Review Comments returned by EPC DPW Development Services - Engineering
|
4/14/2025 4:05:32 PM
|
Request for Review Comments returned by EPC DPW Stormwater
|
4/14/2025 10:17:58 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
4/11/2025 12:52:40 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
4/4/2025 2:51:40 PM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/3/2025 8:02:59 AM
|
Request for Review Comments returned by USAFA Base Planner
|
3/25/2025 4:11:27 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
3/21/2025 12:25:06 PM
|
Fees paid: 3/21/2025 (Receipt: 1010323)
|
3/21/2025 8:20:44 AM
|
Request for Review Comments returned by Schriever AFB
|
3/20/2025 8:24:29 AM
|
Request for Review Comments returned by EPC Parks Department
|
3/19/2025 11:13:32 AM
|
Request for Review Comments returned by Colorado Department of Public Health and Environment
|
3/19/2025 9:09:28 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/18/2025 2:51:30 PM
|
Request for Review Comments returned by EPC Environmental Services
|
3/18/2025 2:16:25 PM
|
Payment Request sent: 3/18/2025
|
3/18/2025 1:59:40 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
3/18/2025 11:40:06 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
3/17/2025 9:41:23 AM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/14/2025 4:04:21 PM
|
Request for Review Comments returned by Meadow Lake Airport Association
|
3/14/2025 3:48:53 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Sabrina Untal on behalf of USAFA Base Planner
|
3/14/2025 3:48:52 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Matthew Fitzsimmons on behalf of USAFA Base Planner
|
3/14/2025 3:48:51 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Amy Kelley on behalf of USAFA Base Planner
|
3/14/2025 3:48:50 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of USAFA Base Planner
|
3/14/2025 3:48:49 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Mark Stanwood on behalf of Tri-County Fire Protection District
|
3/14/2025 3:48:48 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Wyatt Manson on behalf of Tri-County Fire Protection District
|
3/14/2025 3:48:47 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of Springs East Airport
|
3/14/2025 3:48:46 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Darren Horstmeier on behalf of Schriever AFB
|
3/14/2025 3:48:44 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
3/14/2025 3:48:43 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by General Email on behalf of Mountain View Electric Association, Inc.
|
3/14/2025 3:48:42 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Dwight Barnes on behalf of Miami Yoder 60 JT
|
3/14/2025 3:48:41 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Dave Elliott on behalf of Meadow Lake Airport Association
|
3/14/2025 3:48:40 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Harry Thomas on behalf of El Paso County Conservation Dist
|
3/14/2025 3:48:39 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Oliver Watkins on behalf of El Paso County Conservation Dist
|
3/14/2025 3:48:38 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Katie Miller on behalf of El Paso County Conservation Dist
|
3/14/2025 3:48:36 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Erica Carter on behalf of El Paso County Conservation Dist
|
3/14/2025 3:48:35 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of El Paso County Conservation Dist
|
3/14/2025 3:48:34 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Mariah Hudson on behalf of El Paso County Conservation Dist
|
3/14/2025 3:48:33 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Cassie Olgren on behalf of El Paso County Conservation Dist
|
3/14/2025 3:48:32 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Billy Richard on behalf of El Paso County Conservation Dist
|
3/14/2025 3:48:31 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Chris Padilla on behalf of Colorado Springs Airport Advisory Commission
|
3/14/2025 3:48:30 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
3/14/2025 3:48:28 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of Pikes Peak Regional Building Department
|
3/14/2025 3:48:27 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/14/2025 3:48:26 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
3/14/2025 3:48:25 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Julie Reeves on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/14/2025 3:48:24 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/14/2025 3:48:23 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
3/14/2025 3:48:22 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
|
3/14/2025 3:48:21 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by John Sweeney on behalf of Federal Aviation Administration (FAA)
|
3/14/2025 3:48:20 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by John Bauer on behalf of Federal Aviation Administration (FAA)
|
3/14/2025 3:48:18 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Justin Osborne on behalf of Colorado State Land Board
|
3/14/2025 3:48:17 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
3/14/2025 3:48:16 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
3/14/2025 3:48:15 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
3/14/2025 3:48:14 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
3/14/2025 3:48:13 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/14/2025 3:48:12 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
3/14/2025 3:48:11 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
3/14/2025 3:48:10 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
3/14/2025 3:48:09 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of Colorado Department of Public Health and Environment
|
3/14/2025 3:48:08 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
|
3/14/2025 3:48:06 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
3/14/2025 3:48:05 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
3/14/2025 3:48:04 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
3/14/2025 3:48:03 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of EPC Public Works, County Engineer
|
3/14/2025 3:48:02 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of EPC Public Works, County Engineer
|
3/14/2025 3:48:01 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of EPC Parks Department
|
3/14/2025 3:48:00 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Mike McCarthy on behalf of EPC Health Department
|
3/14/2025 3:47:59 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Catherine McGarvy on behalf of EPC Health Department
|
3/14/2025 3:47:58 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by HEAEH LandUse on behalf of EPC Health Department
|
3/14/2025 3:47:56 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Jim Schanel on behalf of EPC Fire Marshal
|
3/14/2025 3:47:55 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Shanna Smith on behalf of EPC Finance
|
3/14/2025 3:47:54 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Nikki Simmons on behalf of EPC Finance
|
3/14/2025 3:47:53 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/14/2025 3:47:52 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Mikayla Hartford on behalf of EPC DPW Stormwater
|
3/14/2025 3:47:51 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Glenn Reese on behalf of EPC DPW Stormwater
|
3/14/2025 3:47:50 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Christina Prete on behalf of EPC DPW Stormwater
|
3/14/2025 3:47:49 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Gilbert LaForce on behalf of EPC DPW Development Services - Engineering
|
3/14/2025 3:47:48 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Engineering Manager on behalf of EPC DPW Development Services - Engineering
|
3/14/2025 3:47:47 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of County Attorney - 1041
|
3/14/2025 3:47:46 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Erika Keech on behalf of County Attorney - 1041
|
3/14/2025 3:47:45 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of County Attorney - 1041
|
3/14/2025 3:47:43 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by Justin Kilgore on behalf of PCD Project Manager
|
3/14/2025 3:47:42 PM
|
Request for Review Comments email sent for Project Tri-State Crosspoint Substation 1041 for review by on behalf of PCD Administrative Notice
|
3/14/2025 2:18:52 PM
|
Fees paid: 3/14/2025 (Receipt: 1010287)
|
3/10/2025 5:03:09 PM
|
Payment Request sent: 3/10/2025
|
3/10/2025 5:03:09 PM
|
File # Assigned: AASI251
|
3/10/2025 5:03:06 PM
|
Submission Triaged
|
3/10/2025 11:33:35 AM
|
Submission received from Applicant
|
3/4/2025 4:40:34 PM
|
Submission request sent to Applicant
|
3/4/2025 2:56:35 PM
|
EA Assigned: EA23124
|
3/4/2025 2:14:49 PM
|
Project Manager Assigned: Ryan Howser
|
3/4/2025 2:14:49 PM
|
Project Created
|