Project Details
Search |
All Active Projects
-
File Number
-
AASI251
-
Project Name
-
Tri-State Crosspoint Substation 1041
-
Description
-
Tri-State Generation and Transmission Association, Inc (Tri-State) is proposing a new 230-kV substation that sectionalizes the existing 230-kV Lincoln – Midway transmission line in El Paso County. The Project is being developed to increase the load serving capability for Tri-State’s Member, Mountain View Electric Association (MVEA), related to substantial residential growth east of Colorado Springs. The current 69-kV system is served by two delivery points at Falcon and Calhan that are increasingly incapable of serving the system and cannot maintain voltage in a contingency situation. The Project is also being developed to improve system reliability for Tri-State’s Member, Southeast Colorado Power Association (SECPA). SECPA’s 69-kV Edison Delivery Point is sourced from MVEA at the Edison Tap, which is 17 miles away, and from Calhan which is 20 miles away - the extended 69-kV system increases exposure and impacts to the system from line faults.
-
Parcels
-
1400000592
1400000592
-
Applicant
-
Ulteig
Derek Holscher ( derek.holscher@ulteig.com )
(720) 873-5876
Derek Holscher ( derek.holscher@ulteig.com )
(720) 873-5876
-
EA Number
-
EA23124
-
File Prefix
-
AASI - Areas and Activities of State Interest
-
Year
-
2025
-
Project Manager
-
Ryan Howser
-
Status
-
Active
-
Created
-
3/4/2025 2:14:48 PM
View:
Review Comments
Additional Documents (4)
Link
|
Document
|
Comment
|
Date
|
View
|
Neighbor Notice & Vicinity Map
|
"Notice of Administrative Decision" letters were mailed by PCD on 03/18/2025. The potential decision can be made after 04/01/2025. JM
|
3/18/2025 1:58:12 PM
|
View
|
Mailing Labels
|
Mailing Labels for the 17 surrounding property owners. The cost to be billed to the applicant = $11.73 JM
|
3/18/2025 1:58:12 PM
|
View
|
Selected Range
|
Selected Range was 500 feet. JM
|
3/18/2025 1:58:13 PM
|
View
|
Returned Notice - 3/24/2025
|
|
3/25/2025 9:21:13 AM
|
Review Documents (24)
Link
|
Document
|
Date
|
View
|
1041 Cover Sheet, Project Summary, Table of Contents
|
3/5/2025 2:40:33 PM
|
View
|
1041 Documents Related to 2.303 (Items 1-23) and 2.405 (Items 1-16)
|
3/5/2025 2:40:32 PM
|
View
|
1041 Documents Related to 5.201 (Items 1 - 11) and 5.202 (Items 1-5)
|
3/5/2025 2:40:32 PM
|
View
|
Attachment A - PUC – Certificate of Public Convenience and Necessity
|
3/5/2025 12:54:03 PM
|
View
|
Attachment B - Application Form
|
3/5/2025 12:54:03 PM
|
View
|
Attachment C - Traffic Impact Study with Haul Route
|
3/5/2025 12:54:04 PM
|
View
|
Attachment D - Mineral Rights Certification
|
3/5/2025 12:54:04 PM
|
View
|
Attachment E - Recorded Special Warranty Deed
|
3/5/2025 12:54:05 PM
|
View
|
Attachment F - 2023 Tri-State Annual Report
|
3/5/2025 12:54:05 PM
|
View
|
Attachment G - Design Drawings
|
3/5/2025 12:54:06 PM
|
View
|
Attachment H - Drainage Report
|
3/5/2025 12:54:07 PM
|
View
|
Attachment I - List of Adjacent Property Owners
|
3/5/2025 12:54:07 PM
|
View
|
Attachment J - Phase 1 Environmental Site Assessment
|
3/5/2025 12:54:08 PM
|
View
|
Attachment K - Biological Evaluation
|
3/5/2025 12:54:09 PM
|
View
|
Attachment L - Limited Results Cultural Survey Report
|
3/5/2025 12:54:09 PM
|
View
|
Attachment M - Geotechnical Report
|
3/5/2025 12:54:10 PM
|
View
|
Attachment N - Project Maps
|
3/5/2025 12:54:10 PM
|
View
|
Attachment O - Analysis of Magnetic Fields and Audible Noise
|
3/5/2025 12:54:11 PM
|
View
|
Attachment P - 2023 Renewable Energy Standard Annual Compliance Report
|
3/5/2025 12:54:12 PM
|
View
|
Attachment Q - Emergency Action Plan
|
3/5/2025 12:54:12 PM
|
View
|
Attachment R - Photo Simulations
|
3/5/2025 12:54:13 PM
|
View
|
Attachment S - Open House Summary Report
|
3/5/2025 12:54:15 PM
|
View
|
Attachment T - Environmental Protection Measures
|
3/5/2025 12:54:18 PM
|
View
|
Colorado Geological Survey Receipt
|
3/10/2025 11:33:12 AM
|