10850 E Woodmen Road D49 Addition PPR
Description
D49 is adding covered parking and storage buildings to their existing site.
Location
Parcels
5301002006 5301002006
Applicant
DLR Group
David Riggs ( driggs@DLRGROUP.com )
(719) 313-5730
David Riggs ( driggs@DLRGROUP.com )
(719) 313-5730
File Number
PPR253
Project Manager
Lacey Dean
Status
Active
Created
1/22/2025 7:36:00 AM

View: Project Documents



Review Comments (16)

Link Agency Comment
View PCD Engineering Division
2/19/2025 5:10:29 PM
2/19/2025 5:10:29 PM
PCD Engineering Division
2/19/2025 5:09:54 PM
Engineering Review Ver.1

See comments on the following documents

FDR_V1

Note EPC Road Impact fees for the two new buildings is being reviewed and comments are forthcoming.

Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
2/19/2025 5:09:54 PM
View PCD Engineering Division
2/19/2025 5:10:51 PM
FDR_V1 2/19/2025 5:10:51 PM
View PCD Project Manager
2/18/2025 5:11:44 PM
V1_Site Development Plan_comments 2/18/2025 5:11:44 PM
View PCD Project Manager
2/18/2025 5:11:24 PM
V1_Landscape Plan drawings_comments 2/18/2025 5:11:24 PM
View PCD Project Manager
2/18/2025 5:10:42 PM
V1_Letter of Intent_comments 2/18/2025 5:10:42 PM
PCD Project Manager
2/18/2025 5:14:15 PM
Review 1: EPC Planning Division has comments in green text boxes on the following documents:

- Letter of Intent
- Landscape Plan Drawings
- Site Development Plan

Reviewed by:
Lacey Dean, Associate Planner
laceydean2@elpasoco.com
2/18/2025 5:14:15 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/18/2025 10:07:11 AM
Good morning Lacey,
CSU has three (3) outstanding comments to be addressed:

Action Item: Gas meter locations on plan view and building elevations must be shown and labeled.

Action Item: Add note " Gas meters must be a minimum of 3-feet from doors, operable windows, or any vents or openings in walls."

Action Item: Add note “CSU Field Engineer to determine final gas meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) with any questions.”

Best,
Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Colorado Springs Utilities | Utilities Development Services
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
2/18/2025 10:07:11 AM
EPC Stormwater Review
2/18/2025 1:24:42 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s) (to be uploaded by the Project Manager):
- Drainage Analysis

Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- Maintenance Agreement (see comments on the drainage report)

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
2/18/2025 1:24:42 PM
View EPC Health Department
2/14/2025 4:40:42 PM
2/14/2025 4:40:42 PM
County Attorney - Development Review
2/13/2025 9:21:52 AM
No comments at this time. 2/13/2025 9:21:52 AM
View Falcon Fire Protection District
2/10/2025 1:54:31 PM
2/10/2025 1:54:31 PM
View EPC Environmental Services
2/7/2025 9:34:05 AM
2/7/2025 9:34:05 AM
Falcon School District 49
2/7/2025 9:17:00 AM
District 49 is in support of the addition of covered parking and storage buildings. 2/7/2025 9:17:00 AM
Pikes Peak Regional Building Department
2/5/2025 2:54:55 PM
New commercial detached structure are required to have a separate structure. This was not the case long ago when the other structure were built. The covered parking address is 10868 E Woodmen Road. The new barn address is 10878 E Woodmen Road.
No further comments.

Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
2/5/2025 2:54:55 PM
EPC Parks Department
2/3/2025 3:51:52 PM
El Paso County Parks and Community Services. The 2022 El Paso County Parks Master Plan shows no impacts to existing or proposed parks, trails, or open space. As such, no trail easements or park land dedications are necessary. As this is a site development plan for an existing school facility, no park fees will be assessed. Thank you! 2/3/2025 3:51:52 PM