Project Review Comments

Back to List


Project Name
El Dorado Springs Apartments SDP
Description
A request for a new Site Development Plan
Location
Off Venetucci BLVD northwest of the 87 and 25 intersection
Parcels
6433300012 6433300012 6433301049 6433301049
Applicant
WestWorks Engineering
Chad Kuzbek ( chad@westworksengineering.com )
(719) 685-1670 x20
Chad Kuzbek ( chad@westworksengineering.com )
(719) 685-1670 x20
File Number
ASB2423
Project Manager
Stormwater Glenn Reese
Status
Active
Created
5/20/2024 3:24:19 PM

View: Project Documents



Review Comments (4)

Link Agency Comment
EPC DPW Asset Management
9/8/2025 9:48:41 AM
Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points.

Reviewed by:
Matt Goolsby
Senior Geospatial Analyst
719.352.5937
MatthewGoolsby@elpasoco.com
9/8/2025 9:48:41 AM
View EPC Stormwater Review
11/14/2024 3:07:55 PM
As-Built CDs 11/14/2024 3:07:55 PM
EPC Stormwater Review
11/14/2024 3:07:35 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-Built CDs

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
11/14/2024 3:07:35 PM
PCD Engineering Division
11/8/2024 7:55:27 AM
There are no comments relating to drainage or transportation.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
11/8/2024 7:55:27 AM