Project Review Comments

Back to List


Project Name
I68 Training Facility Phase 1 Site Development Plan
Description
Site development plan for outdoor shooting range. Special use approval AL249. Phase 1 includes ranges and parking areas, but no structures.
Location
Parcels
1300000712 1300000712
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA2462
File Number
PPR2440
Project Manager
Lacey Dean
Status
Active
Created
5/17/2024 3:57:12 PM

View: Project Documents



Review Comments (21)

Link Agency Comment
PCD Engineering Division
12/19/2024 3:58:59 PM
Engineering Review 2.

Project Manager: Please include a Deviation Request as an optional document for the next submittal.

Engineering comments on the following documents (to be uploaded by project manager):
- Letter of Intent
- Site Development Plan
- Drainage Report
- Traffic Impact Study
- Additional comment: Staff is determining the method for calculating the Road Impact Fee. The applicant will be notified once the determination has been made.

Reviewed by:

Joe Sandstrom
josephsandstrom@elpasoco.com
(719)520-6314

and

Daniel Torres
danieltorres@elpasoco.com
(719) 520-6305
12/19/2024 3:58:59 PM
View EPC Stormwater Review
12/16/2024 10:19:50 AM
ESQCP 12/16/2024 10:19:50 AM
EPC Stormwater Review
12/16/2024 10:08:34 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP
- FAE..............................(to be uploaded with Development services comments)
- GEC Plan.....................(to be uploaded with Development services comments)

EPC DPW Stormwater comments have been resolved on the following document(s):
- Drainage Report
- GEC Checklist
- Landscape Plan
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
12/16/2024 10:08:34 AM
View EPC Health Department
12/6/2024 11:54:13 AM
12/6/2024 11:54:13 AM
View PCD Engineering Division
11/20/2024 10:16:50 PM
Grading and Erosion Control Plan comments 11/20/2024 10:16:50 PM
View PCD Engineering Division
11/20/2024 10:15:53 PM
Traffic Study comments 11/20/2024 10:15:53 PM
View PCD Engineering Division
11/20/2024 10:15:17 PM
Drainage Report comments 11/20/2024 10:15:17 PM
PCD Engineering Division
11/20/2024 10:13:44 PM
Review 1 comments on the following documents shall be uploaded:
-Drainage Report
-Traffic Impact Study
-Letter of intent (uploaded by project manager)
-Grading and Erosion Control Plan
-Site Development Plan (uploaded by project manager)

reviewed by:
Joseph Sandstrom
josephsandstrom@elpasoco.com

and

Daniel Torres
danieltorres@elpasoco.com
11/20/2024 10:13:44 PM
View PCD Project Manager
11/20/2024 5:27:55 PM
Letter of Intent_comments 11/20/2024 5:27:55 PM
View PCD Project Manager
11/20/2024 5:27:19 PM
Site Development Plan_comments 11/20/2024 5:27:19 PM
View PCD Project Manager
11/20/2024 5:26:45 PM
Landscape Plan_comments 11/20/2024 5:26:45 PM
View EPC Stormwater Review
11/20/2024 5:20:50 PM
SWMP Checklist 11/20/2024 5:20:50 PM
View EPC Stormwater Review
11/20/2024 5:20:36 PM
SWMP 11/20/2024 5:20:36 PM
View EPC Stormwater Review
11/20/2024 5:20:17 PM
PBMP 11/20/2024 5:20:17 PM
View EPC Stormwater Review
11/20/2024 5:18:05 PM
GEC Checklist 11/20/2024 5:18:05 PM
View EPC Stormwater Review
11/20/2024 5:17:46 PM
ESQCP 11/20/2024 5:17:46 PM
PCD Project Manager
11/20/2024 4:32:08 PM
Review 1: EPC Planning Division has comments (in green boxes) on the following documents:

- Landscape Plan Drawings
- Site Development Plan
- Letter of Intent

Reviewed by:
Lacey Dean, Associate Planner
laceydean2@elpasoco.com
11/20/2024 4:32:08 PM
EPC Stormwater Review
11/20/2024 5:13:41 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report....................(to be uploaded by Development Services Engineering)
- ESQCP
- GEC Plan..............................(to be uploaded by Development Services Engineering)
- GEC Checklist
- Landscape Plan....................(to be uploaded by the Project Manager)
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal (the planner will send an upload request):
- FAE

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
11/20/2024 5:13:41 PM
Pikes Peak Regional Building Department
11/18/2024 2:30:21 PM
1. The summary in EDARP mentions this submittal does not include structures; however the site plan shows shooting overhead covers.
2. If this site development plan review includes the overhead cover/shooting platform in all phases they will require separate addresses and permits.
3. Enumerations suggests that we address all of the structures at the same time to be able to provide a comprehensive addressing plan for the facility.


Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
11/18/2024 2:30:21 PM
View Mountain View Electric Association, Inc.
11/18/2024 10:40:13 AM
See attached comments 11/18/2024 10:40:13 AM
Upper Black Squirrel Creek GWMD
11/12/2024 1:26:46 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 11/12/2024 1:26:46 PM