Project Review Comments
- Project Name
- I68 Training Facility Phase 1 Site Development Plan
- Description
- Site development plan for outdoor shooting range. Special use approval AL249. Phase 1 includes ranges and parking areas, but no structures.
- Location
- Parcels
- 1300000712 1300000712
- Applicant
-
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736 David Gorman ( daveg@mvecivil.com )
(719) 635-5736 - EA Number
- EA2462
- File Number
- PPR2440
- Project Manager
- Lacey Dean
- Status
- Active
- Created
- 5/17/2024 3:57:12 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
12/19/2024 3:58:59 PM |
Engineering Review 2. Project Manager: Please include a Deviation Request as an optional document for the next submittal. Engineering comments on the following documents (to be uploaded by project manager): - Letter of Intent - Site Development Plan - Drainage Report - Traffic Impact Study - Additional comment: Staff is determining the method for calculating the Road Impact Fee. The applicant will be notified once the determination has been made. Reviewed by: Joe Sandstrom josephsandstrom@elpasoco.com (719)520-6314 and Daniel Torres danieltorres@elpasoco.com (719) 520-6305 |
12/19/2024 3:58:59 PM | |
View |
EPC Stormwater Review
12/16/2024 10:19:50 AM |
ESQCP | 12/16/2024 10:19:50 AM |
EPC Stormwater Review
12/16/2024 10:08:34 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - ESQCP - FAE..............................(to be uploaded with Development services comments) - GEC Plan.....................(to be uploaded with Development services comments) EPC DPW Stormwater comments have been resolved on the following document(s): - Drainage Report - GEC Checklist - Landscape Plan - PBMP Applicability Form - SWMP - SWMP Checklist Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
12/16/2024 10:08:34 AM | |
View |
EPC Health Department
12/6/2024 11:54:13 AM |
12/6/2024 11:54:13 AM | |
View |
PCD Engineering Division
11/20/2024 10:16:50 PM |
Grading and Erosion Control Plan comments | 11/20/2024 10:16:50 PM |
View |
PCD Engineering Division
11/20/2024 10:15:53 PM |
Traffic Study comments | 11/20/2024 10:15:53 PM |
View |
PCD Engineering Division
11/20/2024 10:15:17 PM |
Drainage Report comments | 11/20/2024 10:15:17 PM |
PCD Engineering Division
11/20/2024 10:13:44 PM |
Review 1 comments on the following documents shall be uploaded: -Drainage Report -Traffic Impact Study -Letter of intent (uploaded by project manager) -Grading and Erosion Control Plan -Site Development Plan (uploaded by project manager) reviewed by: Joseph Sandstrom josephsandstrom@elpasoco.com and Daniel Torres danieltorres@elpasoco.com |
11/20/2024 10:13:44 PM | |
View |
PCD Project Manager
11/20/2024 5:27:55 PM |
Letter of Intent_comments | 11/20/2024 5:27:55 PM |
View |
PCD Project Manager
11/20/2024 5:27:19 PM |
Site Development Plan_comments | 11/20/2024 5:27:19 PM |
View |
PCD Project Manager
11/20/2024 5:26:45 PM |
Landscape Plan_comments | 11/20/2024 5:26:45 PM |
View |
EPC Stormwater Review
11/20/2024 5:20:50 PM |
SWMP Checklist | 11/20/2024 5:20:50 PM |
View |
EPC Stormwater Review
11/20/2024 5:20:36 PM |
SWMP | 11/20/2024 5:20:36 PM |
View |
EPC Stormwater Review
11/20/2024 5:20:17 PM |
PBMP | 11/20/2024 5:20:17 PM |
View |
EPC Stormwater Review
11/20/2024 5:18:05 PM |
GEC Checklist | 11/20/2024 5:18:05 PM |
View |
EPC Stormwater Review
11/20/2024 5:17:46 PM |
ESQCP | 11/20/2024 5:17:46 PM |
PCD Project Manager
11/20/2024 4:32:08 PM |
Review 1: EPC Planning Division has comments (in green boxes) on the following documents: - Landscape Plan Drawings - Site Development Plan - Letter of Intent Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com |
11/20/2024 4:32:08 PM | |
EPC Stormwater Review
11/20/2024 5:13:41 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report....................(to be uploaded by Development Services Engineering) - ESQCP - GEC Plan..............................(to be uploaded by Development Services Engineering) - GEC Checklist - Landscape Plan....................(to be uploaded by the Project Manager) - PBMP Applicability Form - SWMP - SWMP Checklist Please provide the following documents upon resubmittal (the planner will send an upload request): - FAE Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
11/20/2024 5:13:41 PM | |
Pikes Peak Regional Building Department
11/18/2024 2:30:21 PM |
1. The summary in EDARP mentions this submittal does not include structures; however the site plan shows shooting overhead covers. 2. If this site development plan review includes the overhead cover/shooting platform in all phases they will require separate addresses and permits. 3. Enumerations suggests that we address all of the structures at the same time to be able to provide a comprehensive addressing plan for the facility. Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
11/18/2024 2:30:21 PM | |
View |
Mountain View Electric Association, Inc.
11/18/2024 10:40:13 AM |
See attached comments | 11/18/2024 10:40:13 AM |
Upper Black Squirrel Creek GWMD
11/12/2024 1:26:46 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. | 11/12/2024 1:26:46 PM |