Project Review Comments
- Project Name
- CDR Fishers Canyon Channel
- Description
- Fischers Canon Creek and across from Walmart-Sams Club, north of Pikes Peak State College. Potential for trails and open space along creek
- Location
- Parcels
- 6504300049 6504300049
- Applicant
-
Kimley-Horn Associates
Jim Houk ( jim.houk@kimley-horn.com )
(719) 284-7280 Jim Houk ( jim.houk@kimley-horn.com )
(719) 284-7280 - EA Number
- EA2343
- File Number
- CDR246
- Project Manager
- Daniel Torres
- Status
- Active
- Created
- 5/15/2024 1:31:18 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
Fountain
11/5/2024 10:41:20 AM |
Please refer to attached City of Fountain comments. | 11/5/2024 10:41:20 AM |
EPC Stormwater Review
10/31/2024 1:48:03 PM |
Review 2: EPC DPW Stormwater review completed by Development Services Engineers for this submittal. Reviewed by: Christina Prete, P.E. Stormwater Manager ChristinaPrete@elpasoco.com |
10/31/2024 1:48:03 PM | |
PCD Project Manager
10/30/2024 9:58:55 PM |
Review 2 comments on the following documents will be uploaded: -Construction Drawings -Channel Design Report -ESQCP See attached final submittal checklist Comments have been provided based on the information provided in the submitted documents. Additional comments should be expected as more information/analysis is provided in the design report, construction drawings, and other project documents. reviewed by: Jeff Rice Jeffrice@elpasoco.com & Daniel Torres danieltorres@elpasoco.com |
10/30/2024 9:58:55 PM | |
View |
PCD Engineering Division
10/30/2024 9:56:26 PM |
ESQCP comments | 10/30/2024 9:56:26 PM |
View |
PCD Engineering Division
10/30/2024 9:55:14 PM |
Construction Drawings comments | 10/30/2024 9:55:14 PM |
View |
PCD Engineering Division
10/30/2024 9:54:14 PM |
Channel Design Report comments | 10/30/2024 9:54:14 PM |
View |
PCD Engineering Division
10/30/2024 9:53:34 PM |
Review 2 comments on the following documents will be uploaded: -Construction Drawings -Channel Design Report -ESQCP See attached final submittal checklist Comments have been provided based on the information provided in the submitted documents. Additional comments should be expected as more information/analysis is provided in the design report, construction drawings, and other project documents. reviewed by: Jeff Rice Jeffrice@elpasoco.com & Daniel Torres danieltorres@elpasoco.com |
10/30/2024 9:53:34 PM |
Colorado Department of Transportation - Pueblo Office
10/24/2024 7:53:28 AM |
CDOTs previous comments have been addressed. No further comments. | 10/24/2024 7:53:28 AM | |
RBD Floodplain
10/16/2024 8:01:39 AM |
This project needs either a no-rise report or an approved CLOMR from FEMA. Either of these documents will need to be submitted as part of the local floodplain permit application to be approved prior to earth work. |
10/16/2024 8:01:39 AM | |
View |
PCD Engineering Division
7/2/2024 10:52:37 PM |
Channel Design Report comments | 7/2/2024 10:52:37 PM |
View |
PCD Engineering Division
7/3/2024 9:59:09 AM |
Construction Drawing Comments | 7/3/2024 9:59:09 AM |
PCD Engineering Division
7/2/2024 9:52:28 PM |
Review 1 comments on the following documents will be uploaded: -Construction Drawings -Channel Design Report Comments have been provided based on the information provided in the submitted documents. Additional comments should be expected as more information/analysis is provided in the design report, construction drawings, and other project documents. reviewed by: Daniel Torres danieltorres@elpasoco.com & Jeff Rice |
7/2/2024 9:52:28 PM | |
Colorado Department of Transportation - Pueblo Office
7/2/2024 4:31:41 PM |
• As the design progresses, suggest including additional notes or detail to identify how channel runoff is treated before discharging from the site. • The check dams are shown in the initial condition, but there is not a note indicating when they are removed. Verify they are removed after the grouted boulder structure is installed. |
7/2/2024 4:31:41 PM | |
EPC Stormwater Review
7/2/2024 9:00:28 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs.....(to be uploaded with Development Services comments) Per the information that the applicant uploaded with Submittal #1, all ESQCP related documents were not uploaded with Submittal #1 but will be uploaded with Submittal #2. So I'm just documenting that I will review those documents when they are submitted with Submittal #2. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
7/2/2024 9:00:28 AM | |
Stratmoor HIlls Fire Department
6/18/2024 2:12:14 PM |
The Stratmoor Hills Fire Department has no objections to this plan as described. Mark Stanwood for SHVFD |
6/18/2024 2:12:14 PM | |
PCD Project Manager
6/14/2024 11:48:48 AM |
Construction documents for review - no comment. | 6/14/2024 11:48:48 AM | |
Mountain View Electric Association, Inc.
6/11/2024 2:28:15 PM |
This property is not within MVEA territory | 6/11/2024 2:28:15 PM | |
RBD Floodplain
6/11/2024 12:37:22 PM |
Floodplain documentation to be provided in the 3rd submittal | 6/11/2024 12:37:22 PM |