Project Details

Search | All Active Projects


File Number
CDR246
Project Name
CDR Fishers Canyon Channel
Description
Fishers Canyon channel improvements across from Walmart-Sams Club, north of Pikes Peak State College. Potential for trails and open space along creek.
Parcels
6504300049 6504300049
Applicant
Kimley-Horn Associates
Jim Houk ( jim.houk@kimley-horn.com )
(719) 284-7280
Jim Houk ( jim.houk@kimley-horn.com )
(719) 284-7280
EA Number
EA2343
File Prefix
CDR - Construction Drawing Review
Year
2024
Project Manager
Daniel Torres
Status
Active
Created
5/15/2024 1:31:18 PM

View: Review Comments


Approved Documents (5)

Project pending final approval. Some approved documents are available prior to the overall Approval.

Link Document
View Erosion and Stormwater Quality Control Permit (ESQCP)
View Financial Assurance Forms
View PBMP Applicability Form
View Construction Drawings (Plans/Profiles)
View Channel Design Report


Additional Documents (1)

Link Document Comment
View MS4 Overlap Letter - SIGNED


Review Documents (17)

Link Document Date
View Grading & Erosion Control checklist 5/31/2025 9:34:34 PM
View Letter of Intent 7/11/2025 2:21:24 PM
View Vicinity/Location Map 6/4/2024 10:54:24 AM
View Erosion and Stormwater Quality Control Permit (ESQCP) 8/15/2025 2:26:16 PM
View Financial Assurance Forms 11/5/2025 11:22:02 AM
View Floodplain Development Permit 2/24/2025 10:40:14 PM
View PBMP Applicability Form 5/31/2025 9:34:35 PM
View PCM Operations & Maintenance (O&M) Manual 8/15/2025 2:26:16 PM
View SWMP checklist 5/31/2025 9:34:35 PM
View US Army Corps of Engineer's Permit 2/24/2025 10:40:15 PM
View Construction Drawings (Plans/Profiles) 9/18/2025 11:25:18 AM
View Storm Water Management Plan (SWMP) 5/31/2025 9:34:32 PM
View Wetlands Analysis Report 7/11/2025 2:21:25 PM
View Channel Design Report 10/22/2025 2:38:37 PM
View Channel Maintenance Agreement 11/19/2025 8:16:16 AM
View Comment Response Tracker 7/14/2025 5:20:16 PM
View Reponses to Comments 2/24/2025 10:40:21 PM



Events (247)

Date Comment
11/20/2025 9:04:10 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
11/20/2025 9:04:09 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
11/20/2025 9:04:08 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
11/20/2025 9:03:41 AM Submission Triaged
11/19/2025 8:17:10 AM Submission received from Applicant
11/17/2025 12:54:33 PM Submission request sent to Applicant
11/14/2025 6:48:53 AM Submission request sent to Applicant
11/13/2025 3:00:36 PM Request for Review Comments returned by County Attorney - Development Review
11/12/2025 9:01:14 PM Request for Review Comments returned by PCD Project Manager
11/12/2025 8:31:12 AM Submission request sent to Applicant
11/5/2025 2:49:40 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
11/5/2025 2:49:39 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
11/5/2025 2:49:38 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
11/5/2025 2:49:37 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
11/5/2025 2:48:49 PM Submission Triaged
11/5/2025 11:22:31 AM Submission received from Applicant
11/3/2025 10:49:01 AM Submission request sent to Applicant
11/3/2025 10:47:25 AM Request for Review Comments returned by PCD Project Manager
10/30/2025 3:06:02 PM Request for Review Comments returned by County Attorney - Development Review
10/23/2025 12:51:40 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
10/23/2025 12:51:39 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
10/23/2025 12:51:39 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
10/23/2025 12:51:37 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
10/23/2025 12:50:40 PM Submission Triaged
10/22/2025 2:39:13 PM Submission received from Applicant
10/8/2025 4:06:06 PM Submission request sent to Applicant
10/8/2025 4:05:08 PM Request for Review Comments returned by PCD Project Manager
10/7/2025 10:19:09 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
10/7/2025 12:56:58 PM Request for Review Comments returned by County Attorney - Development Review
9/30/2025 7:11:43 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
9/30/2025 7:11:42 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
9/30/2025 7:11:41 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
9/30/2025 7:11:40 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
9/30/2025 7:10:37 AM Submission Triaged
9/29/2025 12:31:25 PM Submission received from Applicant
9/25/2025 5:59:01 PM Request for Review Comments returned by PCD Project Manager
9/24/2025 10:01:47 PM Request for Review Comments returned by PCD Engineering Division
9/22/2025 8:54:15 AM Submission request sent to Applicant
9/22/2025 8:54:02 AM Submission request sent to Applicant
9/22/2025 8:53:47 AM Submission Triaged
9/18/2025 1:20:57 PM Request for Review Comments returned by County Attorney - Development Review
9/18/2025 11:25:53 AM Submission received from Applicant
9/18/2025 10:24:46 AM Submission request sent to Applicant
9/18/2025 9:09:16 AM Submission Triaged
9/18/2025 8:54:08 AM Submission received from Applicant
9/18/2025 8:40:37 AM Submission request sent to Applicant
9/17/2025 4:12:48 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
9/17/2025 4:12:47 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
9/17/2025 4:12:46 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
9/17/2025 4:12:45 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
9/17/2025 4:12:41 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Gilbert LaForce on behalf of PCD Engineering Division
9/17/2025 4:12:40 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
9/17/2025 4:09:00 PM Submission Triaged
9/17/2025 7:58:39 AM Submission received from Applicant
8/26/2025 5:05:36 PM Submission request sent to Applicant
8/26/2025 5:04:55 PM Request for Review Comments returned by PCD Project Manager
8/26/2025 5:03:27 PM Request for Review Comments returned by PCD Engineering Division
8/26/2025 9:32:38 AM Request for Review Comments returned by County Attorney - Development Review
8/19/2025 5:41:12 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
8/19/2025 5:41:11 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
8/19/2025 5:41:10 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
8/19/2025 5:41:09 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
8/19/2025 5:41:06 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Gilbert LaForce on behalf of PCD Engineering Division
8/19/2025 5:41:05 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
8/19/2025 5:38:09 PM Submission Triaged
8/15/2025 3:13:37 PM Submission received from Applicant
8/11/2025 1:18:55 PM Submission request sent to Applicant
8/11/2025 1:17:58 PM Submission request sent to Applicant
8/8/2025 12:23:34 PM Request for Review Comments returned by County Attorney - Development Review
7/29/2025 2:30:07 PM Project Manager Assigned: Daniel Torres
7/29/2025 2:03:10 PM Request for Review Comments returned by PCD Project Manager
7/29/2025 1:59:12 PM Request for Review Comments email resent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
7/25/2025 5:00:00 PM Request for Review Comments returned by County Attorney - Development Review
7/25/2025 3:49:21 PM Request for Review Comments returned by PCD Engineering Division
7/24/2025 2:39:59 PM Request for Review Comments returned by EPC Stormwater Review
7/15/2025 11:53:16 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Zachary Jannusch on behalf of EPC Stormwater Review
7/15/2025 11:53:15 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mikayla Hartford on behalf of EPC Stormwater Review
7/15/2025 11:53:14 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Glenn Reese on behalf of EPC Stormwater Review
7/15/2025 11:53:13 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Christina Prete on behalf of EPC Stormwater Review
7/15/2025 11:53:11 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
7/15/2025 11:53:10 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
7/15/2025 11:53:09 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
7/15/2025 11:53:08 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
7/15/2025 11:53:04 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Gilbert LaForce on behalf of PCD Engineering Division
7/15/2025 11:53:03 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
7/15/2025 11:45:51 AM Submission Triaged
7/14/2025 5:28:34 PM Submission received from Applicant
7/8/2025 1:46:05 PM Project Manager Assigned: Jeff Rice
6/19/2025 2:22:45 PM Request for Review Comments returned by County Attorney - Development Review
6/18/2025 7:28:37 AM Submission request sent to Applicant
6/17/2025 5:31:01 PM Request for Review Comments returned by PCD Project Manager
6/16/2025 9:53:22 PM Request for Review Comments returned by PCD Engineering Division
6/12/2025 9:30:04 AM Request for Review Comments returned by EPC Stormwater Review
6/2/2025 3:40:51 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Gilbert LaForce on behalf of PCD Engineering Division
6/2/2025 3:40:50 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
6/2/2025 3:39:44 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kristy Martinez on behalf of Fountain
6/2/2025 3:39:43 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Brandy Williams on behalf of Fountain
6/2/2025 3:39:42 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Ben Sheets on behalf of Fountain
6/2/2025 3:39:41 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Zachary Jannusch on behalf of EPC Stormwater Review
6/2/2025 3:39:40 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mikayla Hartford on behalf of EPC Stormwater Review
6/2/2025 3:39:39 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Glenn Reese on behalf of EPC Stormwater Review
6/2/2025 3:39:38 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Christina Prete on behalf of EPC Stormwater Review
6/2/2025 3:39:37 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
6/2/2025 3:39:36 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
6/2/2025 3:39:35 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
6/2/2025 3:39:33 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
6/2/2025 3:35:43 PM Request for Review Comments sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
6/2/2025 3:28:12 PM Submission Triaged
5/31/2025 9:36:06 PM Submission received from Applicant
3/20/2025 4:33:06 PM Request for Review Comments returned by Fountain
3/20/2025 7:24:08 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kristy Martinez on behalf of Fountain
3/20/2025 7:24:07 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Brandy Williams on behalf of Fountain
3/20/2025 7:24:06 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Ben Sheets on behalf of Fountain
3/18/2025 1:34:46 PM Submission request sent to Applicant
3/18/2025 1:28:55 PM Request for Review Comments returned by PCD Project Manager
3/18/2025 1:21:59 PM Request for Review Comments returned by Stratmoor Hills Water & San
3/18/2025 1:17:11 PM Request for Review Comments returned by PCD Engineering Division
3/18/2025 12:17:56 PM Request for Review Comments returned by County Attorney - Development Review
3/17/2025 2:48:36 PM Request for Review Comments returned by EPC Stormwater Review
3/17/2025 8:15:19 AM Request for Review Comments email resent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
3/11/2025 12:24:11 PM Request for Review Comments returned by County Attorney - Development Review
2/25/2025 11:11:17 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kirk Medina on behalf of Stratmoor Hills Water & San
2/25/2025 11:11:16 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kevin Niles on behalf of Stratmoor Hills Water & San
2/25/2025 11:11:15 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kristy Martinez on behalf of Fountain
2/25/2025 11:11:14 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Brandy Williams on behalf of Fountain
2/25/2025 11:11:12 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Ben Sheets on behalf of Fountain
2/25/2025 11:11:11 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Harry Thomas on behalf of El Paso County Conservation Dist
2/25/2025 11:11:10 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Oliver Watkins on behalf of El Paso County Conservation Dist
2/25/2025 11:11:09 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Katie Miller on behalf of El Paso County Conservation Dist
2/25/2025 11:11:08 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erica Carter on behalf of El Paso County Conservation Dist
2/25/2025 11:11:07 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by on behalf of El Paso County Conservation Dist
2/25/2025 11:11:06 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mariah Hudson on behalf of El Paso County Conservation Dist
2/25/2025 11:11:05 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Cassie Olgren on behalf of El Paso County Conservation Dist
2/25/2025 11:11:03 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Billy Richard on behalf of El Paso County Conservation Dist
2/25/2025 11:11:02 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
2/25/2025 11:11:01 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Marcus Henderson on behalf of Black Hills Energy-Aquila
2/25/2025 11:11:00 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Bob Swatek on behalf of Black Hills Energy-Aquila
2/25/2025 11:10:59 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Adam Magoon on behalf of Black Hills Energy-Aquila
2/25/2025 11:10:57 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
2/25/2025 11:10:56 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mikayla Hartford on behalf of EPC Stormwater Review
2/25/2025 11:10:55 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Glenn Reese on behalf of EPC Stormwater Review
2/25/2025 11:10:54 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Christina Prete on behalf of EPC Stormwater Review
2/25/2025 11:10:53 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Lori Seago on behalf of County Attorney - Development Review
2/25/2025 11:10:52 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Erika Keech on behalf of County Attorney - Development Review
2/25/2025 11:10:51 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by April Willie on behalf of County Attorney - Development Review
2/25/2025 11:10:50 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
2/25/2025 11:10:45 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Gilbert LaForce on behalf of PCD Engineering Division
2/25/2025 11:10:44 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
2/25/2025 10:32:45 AM Submission Triaged
2/24/2025 10:40:46 PM Submission received from Applicant
1/23/2025 4:14:01 PM Request for Review Comments returned by Fountain
1/13/2025 10:01:33 PM Submission request sent to Applicant
1/13/2025 9:54:39 PM Request for Review Comments returned by PCD Project Manager
1/13/2025 9:48:25 PM Request for Review Comments returned by PCD Engineering Division
1/9/2025 1:22:36 PM Request for Review Comments returned by EPC Stormwater Review
12/23/2024 3:44:39 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kristy Martinez on behalf of Fountain
12/23/2024 3:44:37 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Brandy Williams on behalf of Fountain
12/23/2024 3:44:35 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Ben Sheets on behalf of Fountain
12/23/2024 3:44:33 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mikayla Hartford on behalf of EPC Stormwater Review
12/23/2024 3:44:31 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Glenn Reese on behalf of EPC Stormwater Review
12/23/2024 3:44:29 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Christina Prete on behalf of EPC Stormwater Review
12/23/2024 3:44:27 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Justin Kilgore on behalf of PCD Project Manager
12/23/2024 3:44:18 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Gilbert LaForce on behalf of PCD Engineering Division
12/23/2024 3:44:16 PM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
12/23/2024 3:36:47 PM Submission Triaged
12/23/2024 12:32:14 PM Submission received from Applicant
11/20/2024 10:52:25 AM Project Manager Assigned: Daniel Torres
11/6/2024 3:50:44 PM Submission request sent to Applicant
11/6/2024 3:44:20 PM Request for Review Comments returned by Fountain
10/31/2024 2:30:40 PM Request for Review Comments returned by EPC Stormwater Review
10/30/2024 9:59:20 PM Request for Review Comments returned by PCD Project Manager
10/30/2024 9:57:12 PM Request for Review Comments returned by PCD Engineering Division
10/24/2024 7:53:36 AM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
10/16/2024 8:01:59 AM Request for Review Comments returned by RBD Floodplain
10/16/2024 7:40:00 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kevin Niles on behalf of Stratmoor Hills Water & San
10/16/2024 7:39:58 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kristy Martinez on behalf of Fountain
10/16/2024 7:39:56 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Brandy Williams on behalf of Fountain
10/16/2024 7:39:54 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Ben Sheets on behalf of Fountain
10/16/2024 7:39:52 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Keith Curtis on behalf of RBD Floodplain
10/16/2024 7:39:50 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
10/16/2024 7:39:48 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
10/16/2024 7:39:46 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
10/16/2024 7:39:43 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
10/16/2024 7:39:40 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mikayla Hartford on behalf of EPC Stormwater Review
10/16/2024 7:39:39 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Glenn Reese on behalf of EPC Stormwater Review
10/16/2024 7:39:37 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Christina Prete on behalf of EPC Stormwater Review
10/16/2024 7:39:35 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kari Parsons on behalf of PCD Project Manager
10/16/2024 7:39:26 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Gilbert LaForce on behalf of PCD Engineering Division
10/16/2024 7:39:24 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
10/16/2024 7:37:23 AM Submission Triaged
10/16/2024 7:36:11 AM Project Manager Assigned: Engineering Manager
9/16/2024 2:16:04 PM Project Manager Assigned: Gilbert LaForce
9/15/2024 10:52:56 PM Submission received from Applicant
7/10/2024 3:12:06 PM Submission request sent to Applicant
7/3/2024 1:05:53 PM Submission request sent to Applicant
7/3/2024 11:05:19 AM Request for Review Comments returned by PCD Engineering Division
7/3/2024 11:02:05 AM Request for Review Comments email resent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
7/3/2024 10:00:19 AM Request for Review Comments returned by PCD Engineering Division
7/3/2024 9:57:25 AM Request for Review Comments email resent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
7/2/2024 10:54:51 PM Request for Review Comments returned by PCD Engineering Division
7/2/2024 4:31:50 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
7/2/2024 9:01:15 AM Request for Review Comments returned by EPC Stormwater Review
6/18/2024 2:12:33 PM Request for Review Comments returned by Stratmoor HIlls Fire Department
6/14/2024 11:49:03 AM Request for Review Comments returned by PCD Project Manager
6/12/2024 12:30:27 PM Submission request canceled
6/11/2024 2:28:23 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
6/11/2024 12:37:31 PM Request for Review Comments returned by RBD Floodplain
6/11/2024 8:44:21 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kevin Niles on behalf of Stratmoor Hills Water & San
6/11/2024 8:44:19 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mark Stanwood on behalf of Stratmoor HIlls Fire Department
6/11/2024 8:44:17 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Dottie Barrett on behalf of Stratmoor HIlls Fire Department
6/11/2024 8:44:15 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Jim Pesicka on behalf of Stratmoor Hills
6/11/2024 8:44:13 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by General Email on behalf of Mountain View Electric Association, Inc.
6/11/2024 8:44:11 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kristy Martinez on behalf of Fountain
6/11/2024 8:44:09 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Brandy Williams on behalf of Fountain
6/11/2024 8:44:06 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Ben Sheets on behalf of Fountain
6/11/2024 8:44:04 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Oliver Watkins on behalf of El Paso County Conservation Dist
6/11/2024 8:44:02 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Katie Miller on behalf of El Paso County Conservation Dist
6/11/2024 8:44:00 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mariah Hudson on behalf of El Paso County Conservation Dist
6/11/2024 8:43:57 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
6/11/2024 8:43:55 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Bob Swatek on behalf of Black Hills Energy-Aquila
6/11/2024 8:43:53 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Adam Magoon on behalf of Black Hills Energy-Aquila
6/11/2024 8:43:51 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Keith Curtis on behalf of RBD Floodplain
6/11/2024 8:43:48 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Daniel Delgado on behalf of US Army Corps of Engineers-Pueblo
6/11/2024 8:43:46 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
6/11/2024 8:43:44 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
6/11/2024 8:43:42 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
6/11/2024 8:43:40 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
6/11/2024 8:43:38 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Shannon Mustoe on behalf of EPC Stormwater Review
6/11/2024 8:43:35 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Mikayla Hartford on behalf of EPC Stormwater Review
6/11/2024 8:43:33 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Glenn Reese on behalf of EPC Stormwater Review
6/11/2024 8:43:31 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Christina Prete on behalf of EPC Stormwater Review
6/11/2024 8:43:27 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Kari Parsons on behalf of PCD Project Manager
6/11/2024 8:43:25 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Gilbert LaForce on behalf of PCD Engineering Division
6/11/2024 8:43:23 AM Request for Review Comments email sent for Project CDR Fishers Canyon Channel for review by Engineering Manager on behalf of PCD Engineering Division
6/10/2024 4:00:46 PM Submission request sent to Applicant
6/6/2024 5:22:27 PM Fees paid: 6/6/2024 (Receipt: 1009215)
6/4/2024 2:20:43 PM Payment Request sent: 6/4/2024
6/4/2024 2:20:43 PM File # Assigned: CDR246
6/4/2024 2:20:33 PM Submission Triaged
6/4/2024 10:58:48 AM Submission received from Applicant
5/15/2024 1:49:35 PM Submission request sent to Applicant
5/15/2024 1:47:10 PM Project Manager Assigned: Scott Weeks
5/15/2024 1:43:54 PM Set Applicant to Kimley-Horn Associates
5/15/2024 1:43:10 PM Set Applicant to Kimley Horn & Associates
5/15/2024 1:31:21 PM Project Manager Assigned: Kari Parsons
5/15/2024 1:31:21 PM EA Assigned: EA2343
5/15/2024 1:31:21 PM Project Created