Project Review Comments

Back to List


Project Name
Security Fire Station 4 Site Development Plan
Description
Site Development plan for a new fire station
Location
Candelabra Drive and Wayfarer Drive
Parcels
5528200005 5528200005
Applicant
Security Fire Protection District
Jason Caddick ( jcaddick@securityfiredept.org )
(719) 392-3271
Jason Caddick ( jcaddick@securityfiredept.org )
(719) 392-3271
File Number
ASB2421
Project Manager
Brad Walters
Status
Active
Created
4/30/2024 8:54:56 AM

View: Project Documents



Review Comments (5)

Link Agency Comment
PCD Engineering Division
9/3/2024 9:34:31 AM
There are no comments relating to drainage or transportation.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
9/3/2024 9:34:31 AM
PCD Engineering Inspections
9/3/2024 7:45:01 AM
No Comments from Inspections 9/3/2024 7:45:01 AM
View EPC Stormwater Review
8/29/2024 3:48:51 PM
Pond Certification Letter 8/29/2024 3:48:51 PM
View EPC Stormwater Review
8/29/2024 3:48:36 PM
As-Built Drawings 8/29/2024 3:48:36 PM
EPC Stormwater Review
8/29/2024 3:48:19 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As-Built Drawings
- Pond Certification Letter

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
8/29/2024 3:48:19 PM