Project Review Comments

Back to List


Project Name
Flying Horse East Phase 1 Sketch Plan
Description
Approximately 1800 acres (final boundary and acreage not determined at this time) Mix of low, medium and high density residential with Business Park, Commercial uses, with a potential school complex and hotel site. Densities and total unit count is not final at this time but estimated to be 2000-3000 units
Location
Parcels
4400000438 4400000438
Applicant
HR Green Inc.
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
Phil Stuepfert ( pstuepfert@hrgreen.com )
(630) 220-7936
EA Number
EA2425
File Number
SKP242
Project Manager
Ryan Howser
Status
Active
Created
2/29/2024 3:33:14 PM

View: Project Documents



Review Comments (27)

Link Agency Comment
View Parks Advisory Board
2/12/2025 4:10:05 PM
El Paso County Parks and Community Services Department, Final Comments - Please See Attached Documentation (Endorsed by the Park Advisory Board on February 12, 2025) 2/12/2025 4:10:05 PM
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
2/10/2025 1:48:54 PM
The Colorado Ecological Services Field Office of the U.S. Fish and Wildlife Service has reviewed the Flying Horse East Phase 1 project and has no concerns with this project resulting in impacts to species listed as candidate, proposed, threatened, or endangered. The survey work done by Bristlecone Ecology found that suitable habitat for these species was not present within the project area. 2/10/2025 1:48:54 PM
Ellicott Fire Protection District
2/7/2025 12:10:29 PM
This is preliminary as the need for further infrastructure for fire protection needs to be discussed. 2/7/2025 12:10:29 PM
PCD Administrative Notice
2/5/2025 4:01:08 PM
On 02/05/2025, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (35 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $24.15. JM 2/5/2025 4:01:08 PM
View Colorado Department of Transportation - Pueblo Office
2/3/2025 2:52:13 PM
Please see the attached letter. 2/3/2025 2:52:13 PM
View PCD Project Manager
1/30/2025 4:55:52 PM
V1: Wastewater Report Comments 1/30/2025 4:55:52 PM
View PCD Project Manager
1/30/2025 4:55:35 PM
V1: Water Report Comments 1/30/2025 4:55:35 PM
View PCD Project Manager
1/30/2025 4:55:17 PM
V1: Sketch Plan Comments (Includes Engineering Comments) 1/30/2025 4:55:17 PM
View PCD Project Manager
1/30/2025 4:54:57 PM
V1: Letter of Intent Comments 1/30/2025 4:54:57 PM
View PCD Project Manager
1/30/2025 4:54:41 PM
V1: Impact Identification Statement Comments 1/30/2025 4:54:41 PM
View PCD Engineering Division
1/30/2025 10:34:14 PM
MDDP comments 1/30/2025 10:34:14 PM
PCD Project Manager
1/30/2025 4:54:06 PM
Review 1: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Impact Identification Statement
- Letter of Intent
- Sketch Plan Drawing (includes Engineering comments)
- Water Report
- Wastewater Report
1/30/2025 4:54:06 PM
View PCD Engineering Division
1/30/2025 5:01:43 PM
Traffic Impact Study comments 1/30/2025 5:01:43 PM
PCD Engineering Division
1/30/2025 4:39:21 PM
Engineering Review 1 has comments on the following documents:
- Traffic Impact Study
- Sketch Plan Drawings
- Master Development Drainage Plan (MDDP)

Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864

Daniel Torres, PE
danieltorres@elpasoco.com
1/30/2025 4:39:21 PM
View Schriever AFB
1/30/2025 4:03:36 PM
Schriever SFB review comments included in uploaded memo. 1/30/2025 4:03:36 PM
EPC Stormwater Review
1/30/2025 3:30:39 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- MDDP......(to be uploaded with Development Services comments)

Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
1/30/2025 3:30:39 PM
View Colorado Parks and Wildlife
1/26/2025 5:19:05 PM
1/26/2025 5:19:05 PM
View EPC Parks Department
1/24/2025 11:10:45 AM
El Paso County Parks and Community Services Department, Preliminary Comments - Please See Attached Documentation (To be presented to the Park Advisory Board for endorsement on February 12, 2025) 1/24/2025 11:10:45 AM
View Colorado Division of Water Resources
1/24/2025 9:34:56 AM
1/24/2025 9:34:56 AM
Pikes Peak Regional Building Department
1/22/2025 10:39:27 AM
Enumerations has no comments.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
1/22/2025 10:39:27 AM
Colorado Geological Survey
1/22/2025 9:12:45 AM
The available referral documents include the Sketch Plan (HR Green Development, LLC, December 19, 2024), Letter of Intent (HR Green Development, LLC, December 31, 2024), Soil and Geology Study (Entech Engineering, Inc., December 20, 2024), and other documents. We understand that the applicant desires to develop a range of residential densities, a business park, commercial facilities, mixed-use developments, and a future school site on 1,822 acres located to the east of Enoch Road and south of Highway 94.

A drainage traverses the development that is mapped as a FEMA Floodplain (FIRM Panels: 08041C0785G, dated 12/7/2018). Entech indicates that this drainage will be developed as open space. This area should be designated as a “No-Build Area,” and an erosional non-buildable setback from the floodplain boundary should be established. Entech identifies areas that will impose geologic constraints, including (page 1) “artificial fill, expansive soils, hydrocompaction, floodplain, potential seasonally shallow and seasonally shallow/ponded areas of water, and the potential for elevated radon levels.” Entech’s characterization of the geologic hazards and constraints associated with the site is valid. Provided Entech’s recommendations are adhered to, CGS has no objection to approval of the sketch plan as proposed.

CGS looks forward to reviewing this development during the preliminary and final plat stages.
Considering the size of the parcel of land, it is likely that not all geologic hazards and constraints to development have been identified. Future reviews by CGS may include additional comments about the conditions in more site-specific investigations.

Submitted 1/22/2025 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
1/22/2025 9:12:45 AM
View EPC Health Department
1/19/2025 5:19:05 PM
1/19/2025 5:19:05 PM
County Attorney - Development Review
1/15/2025 11:51:36 AM
No comments from County Attorney - Development Review at this time. 1/15/2025 11:51:36 AM
911 Authority - El Paso/Teller County
1/9/2025 1:19:46 PM
Comments for E911 as follows:

Streetnaming information (criteria, existing/reserved streetnames) for the internal streets of this development can be found at:
https://elpasoteller911.org/191/Street-Name-Database

Thank you
Justin
1/9/2025 1:19:46 PM
View EPC Environmental Services
1/9/2025 10:13:43 AM
1/9/2025 10:13:43 AM
Mountain View Electric Association, Inc.
1/6/2025 9:26:36 AM
Due to the projected zoning and housing density of this new subdivision, MVEA will need to construct an electrical substation within this parcel. MVEA is requesting a mutually agreed upon site for the future substation. This substation will require on and off site transmission lines. Easements will be discussed with the preliminary plan 1/6/2025 9:26:36 AM
County Attorney - Water
1/2/2025 2:00:49 PM
Given the general and preliminary nature of water information available at the sketch plan stage, the CAO
will not provide recommendations or comments on the sufficiency of the water supply for sketch plan.