6/13/2025 2:32:56 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
6/13/2025 2:27:01 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
6/13/2025 2:27:00 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
6/13/2025 2:26:59 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
6/6/2025 9:13:08 AM
|
Fees paid: 6/6/2025 (Receipt: 1010635)
|
6/5/2025 4:16:05 PM
|
Payment Request sent: 6/5/2025
|
5/16/2025 1:40:39 PM
|
Submission request sent to Applicant
|
5/16/2025 12:19:47 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
5/16/2025 12:00:03 PM
|
Request for Review Comments returned by Schriever AFB
|
5/16/2025 9:27:25 AM
|
Submission request sent to Applicant
|
5/14/2025 3:16:57 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/14/2025 3:00:16 PM
|
Request for Review Comments email resent for Project Flying Horse East Phase 1 Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
5/14/2025 2:24:03 PM
|
Request for Review Comments returned by PCD Engineering Division
|
5/12/2025 1:34:53 PM
|
Request for Review Comments returned by Colorado Springs Planning & Community Development
|
5/9/2025 3:03:28 PM
|
Request for Review Comments returned by PCD Project Manager
|
5/7/2025 1:26:02 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Gabe Sevigny on behalf of Colorado Springs Planning & Community Development
|
5/7/2025 1:26:01 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Drew Fox on behalf of Colorado Springs Planning & Community Development
|
5/7/2025 10:04:24 AM
|
Request for Review Comments returned by EPC Environmental Services
|
4/30/2025 2:20:32 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
4/30/2025 2:20:31 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
4/30/2025 2:20:30 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
4/30/2025 2:20:29 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
4/30/2025 2:20:27 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
4/30/2025 2:20:26 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/30/2025 2:20:25 PM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
4/30/2025 2:18:52 PM
|
Submission Triaged
|
4/27/2025 9:13:10 PM
|
Submission received from Applicant
|
4/25/2025 12:19:08 PM
|
Submission request sent to Applicant
|
4/25/2025 12:18:53 PM
|
Submission Triaged
|
4/24/2025 2:22:30 PM
|
Submission received from Applicant
|
4/14/2025 3:27:59 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/8/2025 4:56:23 PM
|
Submission request sent to Applicant
|
4/8/2025 4:54:53 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/8/2025 4:08:25 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/8/2025 6:05:23 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
4/2/2025 12:44:27 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
3/24/2025 2:45:21 PM
|
Request for Review Comments returned by EPC Parks Department
|
3/19/2025 12:22:45 PM
|
Request for Review Comments returned by EPC Environmental Services
|
3/19/2025 9:51:27 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/18/2025 9:03:00 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Darren Horstmeier on behalf of Schriever AFB
|
3/18/2025 9:02:59 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Michael Henley on behalf of Ellicott Fire Protection District
|
3/18/2025 9:02:58 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Norma Houghton on behalf of Ellicott Fire Protection District
|
3/18/2025 9:02:57 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/18/2025 9:02:56 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
3/18/2025 9:02:54 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
3/18/2025 9:02:53 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/18/2025 9:02:51 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
3/18/2025 9:02:50 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
3/18/2025 9:02:49 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
3/18/2025 9:02:48 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/18/2025 9:02:47 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/18/2025 9:02:46 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
3/18/2025 9:02:45 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by on behalf of EPC Parks Department
|
3/18/2025 9:02:44 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
3/18/2025 9:02:42 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
3/18/2025 9:02:40 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/18/2025 9:02:39 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
3/18/2025 9:00:25 AM
|
Submission Triaged
|
3/16/2025 5:07:38 PM
|
Submission received from Applicant
|
2/12/2025 4:10:25 PM
|
Request for Review Comments returned by Parks Advisory Board
|
2/10/2025 1:54:48 PM
|
Fees paid: 2/10/2025 (Receipt: 1010149)
|
2/10/2025 1:48:59 PM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
2/7/2025 12:10:45 PM
|
Request for Review Comments returned by Ellicott Fire Protection District
|
2/5/2025 4:09:39 PM
|
Payment Request sent: 2/5/2025
|
2/5/2025 4:01:18 PM
|
Request for Review Comments returned by PCD Administrative Notice
|
2/3/2025 2:52:36 PM
|
Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
|
1/31/2025 3:11:27 PM
|
Request for Review Comments sent for Project Flying Horse East Phase 1 Sketch Plan for review by on behalf of PCD Administrative Notice
|
1/31/2025 7:38:32 AM
|
Submission request sent to Applicant
|
1/30/2025 10:35:19 PM
|
Request for Review Comments returned by PCD Engineering Division
|
1/30/2025 4:56:11 PM
|
Request for Review Comments returned by PCD Project Manager
|
1/30/2025 4:04:38 PM
|
Request for Review Comments returned by Schriever AFB
|
1/30/2025 3:30:51 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
1/26/2025 5:19:20 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
1/24/2025 11:12:15 AM
|
Request for Review Comments returned by EPC Parks Department
|
1/24/2025 9:35:04 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
1/22/2025 11:46:45 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
1/22/2025 11:46:44 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
1/22/2025 10:51:02 AM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
1/22/2025 9:13:00 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
1/19/2025 5:19:52 PM
|
Request for Review Comments returned by EPC Health Department
|
1/15/2025 11:51:43 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/9/2025 1:20:07 PM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
1/9/2025 10:16:35 AM
|
Request for Review Comments returned by EPC Environmental Services
|
1/6/2025 9:26:45 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/2/2025 2:01:00 PM
|
Request for Review Comments returned by County Attorney - Water
|
1/2/2025 7:28:14 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Darren Horstmeier on behalf of Schriever AFB
|
1/2/2025 7:28:12 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
|
1/2/2025 7:28:10 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
|
1/2/2025 7:28:08 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Chris Smith on behalf of Ellicott SD 22
|
1/2/2025 7:28:06 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Peggy Current on behalf of Ellicott Metro
|
1/2/2025 7:28:04 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Michael Henley on behalf of Ellicott Fire Protection District
|
1/2/2025 7:28:02 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Norma Houghton on behalf of Ellicott Fire Protection District
|
1/2/2025 7:28:00 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
1/2/2025 7:27:58 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
1/2/2025 7:27:56 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
1/2/2025 7:27:54 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
1/2/2025 7:27:52 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by on behalf of Pikes Peak Regional Building Department
|
1/2/2025 7:27:50 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
1/2/2025 7:27:48 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
1/2/2025 7:27:46 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
|
1/2/2025 7:27:45 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
1/2/2025 7:27:43 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
|
1/2/2025 7:27:41 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Carolyn Craveiro de Sa on behalf of Colorado Parks and Wildlife
|
1/2/2025 7:27:39 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
1/2/2025 7:27:37 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
1/2/2025 7:27:35 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
1/2/2025 7:27:33 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
|
1/2/2025 7:27:31 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
|
1/2/2025 7:27:29 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
|
1/2/2025 7:27:27 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by on behalf of Colorado Department of Public Health and Environment
|
1/2/2025 7:27:25 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Brendan Cicione on behalf of Colorado Department of Public Health and Environment
|
1/2/2025 7:27:23 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by on behalf of Parks Advisory Board
|
1/2/2025 7:27:21 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
1/2/2025 7:27:19 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Glenn Reese on behalf of EPC Stormwater Review
|
1/2/2025 7:27:18 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Christina Prete on behalf of EPC Stormwater Review
|
1/2/2025 7:27:16 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
1/2/2025 7:27:14 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
1/2/2025 7:27:12 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
1/2/2025 7:27:10 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by on behalf of EPC Public Works, County Engineer
|
1/2/2025 7:27:08 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by on behalf of EPC Public Works, County Engineer
|
1/2/2025 7:27:06 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by on behalf of EPC Parks Department
|
1/2/2025 7:27:04 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Mike McCarthy on behalf of EPC Health Department
|
1/2/2025 7:27:02 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Catherine McGarvy on behalf of EPC Health Department
|
1/2/2025 7:27:00 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by HEAEH LandUse on behalf of EPC Health Department
|
1/2/2025 7:26:58 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Kathy Andrew on behalf of EPC Environmental Services
|
1/2/2025 7:26:56 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Lori Seago on behalf of County Attorney - Water
|
1/2/2025 7:26:54 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Erika Keech on behalf of County Attorney - Water
|
1/2/2025 7:26:52 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by April Willie on behalf of County Attorney - Water
|
1/2/2025 7:26:50 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Lori Seago on behalf of County Attorney - Development Review
|
1/2/2025 7:26:48 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Erika Keech on behalf of County Attorney - Development Review
|
1/2/2025 7:26:46 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by April Willie on behalf of County Attorney - Development Review
|
1/2/2025 7:26:43 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Justin Kilgore on behalf of PCD Project Manager
|
1/2/2025 7:26:41 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
|
1/2/2025 7:26:39 AM
|
Request for Review Comments email sent for Project Flying Horse East Phase 1 Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
|
1/1/2025 11:39:35 AM
|
Fees paid: 1/1/2025 (Receipt: 1010005)
|
12/31/2024 2:32:35 PM
|
Payment Request sent: 12/31/2024
|
12/31/2024 2:32:35 PM
|
File # Assigned: SKP242
|
12/31/2024 2:32:22 PM
|
Submission Triaged
|
12/31/2024 2:04:37 PM
|
Submission received from Applicant
|
12/20/2024 9:23:38 AM
|
Submission request sent to Applicant
|
12/17/2024 12:22:02 PM
|
Submission request sent to Applicant
|
10/24/2024 9:17:07 AM
|
Submission request sent to Applicant
|
3/6/2024 5:28:30 PM
|
Submission request sent to Applicant
|
2/29/2024 3:33:20 PM
|
Project Manager Assigned: Ryan Howser
|
2/29/2024 3:33:20 PM
|
EA Assigned: EA2425
|
2/29/2024 3:33:20 PM
|
Project Created
|