Project Review Comments

Back to List


File Number
CDR2510
Project Name
CSU Southern Transmission Line replacement
Description
Project consists of: - Rebuild of existing 115 kV transmission line to a double-circuit 230 kV and 115 kV line. - Existing wood poles to be replaced with steel poles (larger pole diameter, drilled pier foundations) - Existing alignment to be maintained. - Existing pole locations to be maintained, although new poles will be offset a few feet from the existing so as to not disrupt service. - Some land disturbance due to larger footprint of individual poles, potential during construction
Applicant
Stanley Consultants
Tyler Marshall ( MarshallTyler@stanleygroup.com )
(319) 259-6607
Tyler Marshall ( MarshallTyler@stanleygroup.com )
(319) 259-6607
File Number
CDR2510
Project Manager
Bret Dilts
Status
Closed
Created
12/1/2023 10:47:15 AM

View: Project Documents



Review Comments (14)

Link Agency Review # Comment
PCD Engineering Division
12/2/2025 9:08:12 AM
2 Review V2

The previous comments have been resolved; we are waiting on a couple of minor items that will be emailed to Jalal to finalize the approval.

The documents will be approved as soon as we receive the revised drainage report with the seal and the FAE (the signature shall be crossing the seal).


Jalal
J. Saleh, PE, MBA
Senior Engineer
Department of Public Works
O: 719-520-7550
https://publicworks.elpasoco.com
12/2/2025 9:08:12 AM
EPC Stormwater Review
11/24/2025 1:52:51 PM
2 Review 2: EPC DPW Stormwater comments have been resolved on the following document(s):
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- PCM Applicability Form
- SWMP
- SWMP Checklist

EPC DPW Stormwater has no further comments. EPC Project Manager: no re-review necessary.

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
11/24/2025 1:52:51 PM
Fountain
11/17/2025 12:27:22 PM
1 No comments. 11/17/2025 12:27:22 PM
View EPC Stormwater Review
11/5/2025 4:06:23 PM
1 SWMP 11/5/2025 4:06:23 PM
View EPC Stormwater Review
11/5/2025 4:06:03 PM
1 SWMP Checklist 11/5/2025 4:06:03 PM
View EPC Stormwater Review
11/5/2025 4:05:48 PM
1 PCM Applicability Form 11/5/2025 4:05:48 PM
View EPC Stormwater Review
11/5/2025 4:05:30 PM
1 GEC Plan 11/5/2025 4:05:30 PM
View EPC Stormwater Review
11/5/2025 4:05:09 PM
1 GEC Checklist 11/5/2025 4:05:09 PM
View EPC Stormwater Review
11/5/2025 4:04:54 PM
1 FAE 11/5/2025 4:04:54 PM
View EPC Stormwater Review
11/5/2025 4:04:43 PM
1 ESQCP 11/5/2025 4:04:43 PM
PCD Engineering Division
11/5/2025 10:37:02 AM
1 Review 1.

Engineering comments on the following documents (to be uploaded by project manager):
- GE Plan
- Drainage Report

Please upload the following documents with the next submittal:
- GE Plan
- Financial Assurance Estimate and/or Letter of Responsibility
- Revised letter of Intent
- Revised drainage Report

Applicant Notes:

I am requesting a response letter with your next submittal explaining how each comment was addressed (please copy and paste all comments to your response letter and respond below each comment). Please do not use the words done, fixed, etc. instead explain how you addressed each comment and indicate the sheet number and the precise location on the sheet where you addressed the comment.

Please call me at the phone number indicated below for a TEAMS meeting review prior to submittal to make sure all comments are addressed, so that we can move this project forward to approval.

FYI:
1. Please note that IF you are doing work in the floodplain, please contact Mr. Keith Curtis who is the regional floodplain administrator and he can be contacted at keith@pprbd.org or 719-327-2898 for any permits may be required in the floodplain area, please report your findings to us.
2. After approval of the Construction plans, the contractor shall obtain from EPC all necessary permits.
3. The ECM Administrator will sign and date the drainage report after all the comments are addressed.


Reviewed by:
Jalal Saleh, PE, MBA, Senior Engineer
jalalsaleh@elpasoco.com
(719) 520-7550
11/5/2025 10:37:02 AM
PCD Project Manager
11/5/2025 7:10:01 AM
1 PCD planning division has no comments on this item. 11/5/2025 7:10:01 AM
EPC Stormwater Review
11/5/2025 4:01:24 PM
1 Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- PCM Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
11/5/2025 4:01:24 PM
Colorado Department of Transportation - Pueblo Office
10/28/2025 2:11:25 PM
1 The necessary utility permit applications have been submitted and are being reviewed. No further comments. 10/28/2025 2:11:25 PM