Project consists of:
- Rebuild of existing 115 kV transmission line to a double-circuit 230 kV and 115 kV line.
- Existing wood poles to be replaced with steel poles (larger pole diameter, drilled pier foundations)
- Existing alignment to be maintained.
- Existing pole locations to be maintained, although new poles will be offset a few feet from the existing so as to not disrupt service.
- Some land disturbance due to larger footprint of individual poles, potential during construction
-