Project Review Comments
- Project Name
- McLean- Hodgen Subdivision (2 Lot Final Plat)
- Description
- 2 Lot Final Plat (Previously 4-lot subdivision)
- Location
- 2415 HODGEN RD
- Parcels
- 6128100014 6128100014
- Applicant
-
Vertex Consulting Services
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606 Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606 - EA Number
- EA2398
- File Number
- MS243
- Project Manager
- Joe Letke
- Status
- Closed
- Created
- 10/16/2023 3:21:05 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
Donald Wescott Fire Protection District
11/13/2024 1:55:13 PM |
No additional comment | 11/13/2024 1:55:13 PM | |
PCD Engineering Division
11/6/2024 8:41:42 AM |
EPC DPW Engineering has no further comment. Signed Drainage Report has been received. Bret Dilts, PE bretdilts@elpasoco.com 719-520-6864 |
11/6/2024 8:41:42 AM | |
County Attorney - Water
10/22/2024 2:31:52 PM |
No further comments from County Attorney - Water. | 10/22/2024 2:31:52 PM | |
County Attorney - Water
10/9/2024 10:38:42 AM |
1. Please amend paragraph 4 of the Covenants to read as required in Requirement C.8 of the Water Supply Review. 2. Please remove paragraph 5 of the Covenants. 3. Please provide a form or sample deed for review as required in Requirements E and F of the Water Supply Review. |
10/9/2024 10:38:42 AM | |
View |
EPC Health Department
9/13/2024 2:52:14 PM |
9/13/2024 2:52:14 PM | |
View |
Tri-Lakes-Monument Fire Protection District
7/19/2024 1:23:02 PM |
Fire department comment | 7/19/2024 1:23:02 PM |
View |
County Attorney - Water
7/15/2024 2:34:01 PM |
See Water Supply Review and Recommendations. | 7/15/2024 2:34:01 PM |
PCD Project Manager
7/8/2024 5:13:46 PM |
Planning has no further comments. Joe Letke Planner 719-520-7964 |
7/8/2024 5:13:46 PM | |
PCD Project Manager
6/27/2024 10:13:22 AM |
Planning has no further comments. Please review CAO comments on the Water Supply Information Summary document. Joe Letke Planner II 719-520-7964 |
6/27/2024 10:13:22 AM | |
County Attorney - Water
6/27/2024 9:35:24 AM |
Please update the Water Supply Information Summary to reflect the amounts of 1.0 and 0.76 AF/year (total 1.76 AF) for the two lots to match the Water Resources Report. The County Attorney's Office can begin an initial review once findings from the Colorado Division of Water have been received. Thank you. | 6/27/2024 9:35:24 AM | |
View |
Colorado Division of Water Resources
6/26/2024 3:53:28 PM |
6/26/2024 3:53:28 PM | |
EPC Sheriff's Department
5/15/2024 1:55:32 PM |
No issues EPSO | 5/15/2024 1:55:32 PM | |
PCD Engineering Division
5/6/2024 3:59:37 PM |
Engineering Review 2 comments have been resolved on the following documents: Drainage Letter Reviewed by: Bret Dilts, PE Engineer III bretdilts@elpasoco.com |
5/6/2024 3:59:37 PM | |
PCD Project Manager
5/8/2024 7:39:40 AM |
Planning has minor comments on the following documents: -Letter of Intent (please add file number at the top of page; outstanding comment from V1) -Plat Drawing (please add file number MS243 to both pages) Joe Letke Planner II 719-520-7964 |
5/8/2024 7:39:40 AM | |
PCD Administrative Notice
4/12/2024 11:14:43 AM |
On 4/12/2024, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (18 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $11.52. MB | 4/12/2024 11:14:43 AM | |
Parks Advisory Board
4/10/2024 8:02:39 AM |
El Paso County Park Planning Division Staff has the following administrative comments on behalf of El Paso County Parks: The Fox Run Regional Trail is located within the vicinity of the site, however, it is located along the northern side of Hodgen Road so no easement is necessary. The Hodgen Road Bicycle Route runs parallel to the site but will be accommodated within the public right-of-way. Fees in lieu of land dedication for regional park purposes in the amount of $920 will be required at the time of the recording of the final plat. This application does not require El Paso County Park Advisory Board consideration. | 4/10/2024 8:02:39 AM | |
View |
PCD Project Manager
4/9/2024 3:46:24 PM |
Water Resources Report | 4/9/2024 3:46:24 PM |
View |
PCD Project Manager
4/9/2024 3:46:01 PM |
Water Supply Information Summary | 4/9/2024 3:46:01 PM |
View |
PCD Project Manager
4/9/2024 3:45:27 PM |
Plat Drawings | 4/9/2024 3:45:27 PM |
View |
PCD Project Manager
4/9/2024 3:45:05 PM |
Drainage Letter | 4/9/2024 3:45:05 PM |
View |
PCD Project Manager
4/9/2024 3:43:25 PM |
Application Form | 4/9/2024 3:43:25 PM |
PCD Engineering Division
4/9/2024 10:19:03 AM |
Engineering Review 1 comments have been provided on the following documents: - V1_Drainage Letter Reviewed by: Bret Dilts, PE Engineer III bretdilts@elpasoco.com |
4/9/2024 10:19:03 AM | |
Colorado Geological Survey
4/9/2024 9:32:29 AM |
The available referral documents include the Final Plat (Apex Land Surveying and Mapping LLC, March 4, 2024), Wastewater Study (Entech Engineering, Inc., Revised March 11, 2024), Soil and Geology Study (Entech Engineering, Inc., Revised March 11, 2024), and other documents. The applicant desires to subdivide 38.68 acres into two rural residential lots. Entech’s characterization of the geologic hazards and constraints associated with the site is valid. Entech identifies areas that will impose geologic constraints/hazards, including (page 1) “potentially expansive soils, downslope creep, areas potential (sic) seasonally shallow groundwater, and shallow bedrock.” Provided Entech’s recommendations are adhered to, CGS has no objection to approval of the minor subdivision as proposed. We offer the following comments: 1. The final plat should be updated to reference Entech’s March 11, 2024 report and the geologic hazards listed. Lots located within areas of geologic hazards/constraints should be indicated on the plat. 2. Erosional setbacks should be established near drainages and noted in the plans. 3. CGS agrees with Entech (page 9), “Individual investigations for new building sites and septic systems will be required prior to construction.” A note requiring these investigations should be included in the plat. Submitted 4/9/2024 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu) |
4/9/2024 9:32:29 AM | |
PCD Project Manager
4/9/2024 8:55:49 AM |
Planning has comments on the following documents: -Application Form -Letter of Intent (one comment: please add file number to the top of page) -Plat Drawing -Water Resources Report -Water Supply Information Summary Joe Letke Planner II 719-520-7964 |
4/9/2024 8:55:49 AM | |
View |
Mountain View Electric Association, Inc.
4/9/2024 8:19:40 AM |
See attached comments | 4/9/2024 8:19:40 AM |
View |
Colorado Division of Water Resources
4/3/2024 8:47:48 AM |
4/3/2024 8:47:48 AM | |
Pikes Peak Regional Building Department
4/2/2024 12:52:18 PM |
Address for Lot 2 will be 2458 Hodgen Rd. Please add this address and the existing address to the final plat as close (North) to the named street as possible. Standard Final Plat comments apply: • Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. • A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). 1 new address, Plat fee will be $10.00. • A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. Please email the Enumerations staff member that reviewed your project. BeckyA@pprbd.org • Pre-plat reviews must be reviewed in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
4/2/2024 12:52:18 PM | |
County Attorney - Water
4/1/2024 3:53:57 PM |
The County Attorney's Office can begin an initial review once the Final Decree and Augmentation Plan have been provided, as well as receipt of findings from the Colorado Division of Water Resources. Thank you. | 4/1/2024 3:53:57 PM | |
EPC Stormwater Review
3/29/2024 9:46:41 AM |
Review 1: As stated in the Drainage Letter, the proposed disturbance is <1ac so an ESQCP and PBMP are not required. And project is not located near any sensitive areas and is not considered part of a larger common plan of development. As such, EPC DPW Stormwater does not have comments on any of the uploaded documents. Thank you. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
3/29/2024 9:46:41 AM | |
EPC Parks Department
3/26/2024 10:40:27 AM |
The Park Planning Division has the following administrative comments on behalf of El Paso County Parks: The Fox Run Regional Trail is located within the vicinity of the site; however, it is located along the northern side of Hodgen Road so no easement is necessary. The Hodgen Road Bicycle Route runs parallel to the site but will be accommodated within the public right-of-way. Fees in lieu of land dedication for regional park purposes in the amount of $920 will be required at the time of the recording of the final plat. | 3/26/2024 10:40:27 AM | |
County Attorney - Development Review
3/22/2024 11:08:14 AM |
No comments from County Attorney - Development Review at this time. | 3/22/2024 11:08:14 AM | |
911 Authority - El Paso/Teller County
3/22/2024 6:55:48 AM |
No action for E911 on this submittal. Thank you. Justin |
3/22/2024 6:55:48 AM |