11/13/2024 2:13:40 PM
|
Project Closed
|
11/13/2024 2:13:40 PM
|
Project Approved: 11/13/2024
|
11/13/2024 1:55:23 PM
|
Request for Review Comments returned by Donald Wescott Fire Protection District
|
11/6/2024 8:42:32 AM
|
Request for Review Comments returned by PCD Engineering Division
|
11/5/2024 8:46:07 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
11/5/2024 8:46:05 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Vicki Wood on behalf of Lewis Palmer 38
|
11/5/2024 8:46:03 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Melissa Andrews on behalf of Lewis Palmer 38
|
11/5/2024 8:46:01 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Brett Ridgway on behalf of Lewis Palmer 38
|
11/5/2024 8:45:59 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Jonathan Bradley on behalf of Donald Wescott Fire Protection District
|
11/5/2024 8:45:57 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
11/5/2024 8:45:55 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
11/5/2024 8:45:53 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
11/5/2024 8:45:51 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
11/5/2024 8:45:49 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Engineering Manager on behalf of PCD Engineering Division
|
11/5/2024 8:44:28 AM
|
Submission Triaged
|
11/4/2024 5:41:34 PM
|
Submission received from Applicant
|
10/31/2024 10:34:09 AM
|
Submission request sent to Applicant
|
10/22/2024 2:32:08 PM
|
Request for Review Comments returned by County Attorney - Water
|
10/16/2024 10:28:05 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
10/16/2024 10:28:03 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
10/16/2024 10:28:02 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by April Willie on behalf of County Attorney - Water
|
10/16/2024 10:26:49 AM
|
Submission Triaged
|
10/15/2024 9:32:56 PM
|
Submission received from Applicant
|
10/9/2024 10:51:21 AM
|
Submission request sent to Applicant
|
10/9/2024 10:38:54 AM
|
Request for Review Comments returned by County Attorney - Water
|
10/7/2024 2:31:41 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
10/7/2024 2:31:39 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
10/7/2024 2:31:38 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by April Willie on behalf of County Attorney - Water
|
10/3/2024 1:14:51 PM
|
Request for Review Comments returned by County Attorney - Water
|
9/25/2024 9:03:59 AM
|
Request for Review Comments email resent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by April Willie on behalf of County Attorney - Water
|
9/23/2024 2:50:24 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
9/23/2024 2:50:22 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
9/23/2024 2:50:21 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by April Willie on behalf of County Attorney - Water
|
9/23/2024 2:49:24 PM
|
Submission Triaged
|
9/23/2024 2:31:54 PM
|
Submission received from Applicant
|
9/18/2024 8:58:04 AM
|
Submission request sent to Applicant
|
9/13/2024 2:52:29 PM
|
Request for Review Comments returned by EPC Health Department
|
9/12/2024 10:52:47 AM
|
Submission Triaged
|
9/11/2024 6:26:39 AM
|
Submission received from Applicant
|
8/12/2024 7:07:29 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Mike McCarthy on behalf of EPC Health Department
|
8/12/2024 7:07:27 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Catherine McGarvy on behalf of EPC Health Department
|
8/12/2024 7:07:25 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by HEAEH LandUse on behalf of EPC Health Department
|
8/7/2024 9:44:08 AM
|
Submission request sent to Applicant
|
7/19/2024 1:23:09 PM
|
Request for Review Comments returned by Tri-Lakes-Monument Fire Protection District
|
7/18/2024 4:12:23 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Jamey Bumgarner on behalf of Tri-Lakes-Monument Fire Protection District
|
7/18/2024 4:12:21 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Jonathan Bradley on behalf of Tri-Lakes-Monument Fire Protection District
|
7/15/2024 2:34:15 PM
|
Request for Review Comments returned by County Attorney - Water
|
7/9/2024 4:59:35 PM
|
Request for Review Comments email resent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Vicki Wood on behalf of Lewis Palmer 38
|
7/8/2024 5:13:52 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/1/2024 8:19:40 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
7/1/2024 8:19:39 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
7/1/2024 8:19:37 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by April Willie on behalf of County Attorney - Water
|
7/1/2024 8:19:35 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Kari Parsons on behalf of PCD Project Manager
|
7/1/2024 8:18:33 AM
|
Submission Triaged
|
7/1/2024 8:17:56 AM
|
Submission received from Applicant
|
6/27/2024 10:13:58 AM
|
Submission request sent to Applicant
|
6/27/2024 10:13:32 AM
|
Request for Review Comments returned by PCD Project Manager
|
6/27/2024 9:35:30 AM
|
Request for Review Comments returned by County Attorney - Water
|
6/26/2024 3:53:45 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
6/24/2024 1:52:10 PM
|
Submission Triaged
|
6/21/2024 8:12:53 AM
|
Submission received from Applicant
|
6/20/2024 2:51:48 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
6/20/2024 2:51:47 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
6/20/2024 2:51:44 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
6/20/2024 2:51:43 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Erika Keech on behalf of County Attorney - Water
|
6/20/2024 2:51:41 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by April Willie on behalf of County Attorney - Water
|
6/20/2024 2:51:39 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Kari Parsons on behalf of PCD Project Manager
|
6/20/2024 2:50:25 PM
|
Submission request sent to Applicant
|
6/20/2024 2:46:38 PM
|
Submission Triaged
|
6/20/2024 2:35:53 PM
|
Submission received from Applicant
|
6/20/2024 2:29:34 PM
|
Submission request sent to Applicant
|
5/15/2024 1:55:46 PM
|
Request for Review Comments returned by EPC Sheriff's Department
|
5/8/2024 10:25:04 AM
|
Submission Triaged
|
5/8/2024 9:56:44 AM
|
Submission received from Applicant
|
5/8/2024 7:40:12 AM
|
Submission request sent to Applicant
|
5/8/2024 7:39:45 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/6/2024 3:59:48 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/23/2024 8:33:36 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Kari Parsons on behalf of PCD Project Manager
|
4/23/2024 8:33:32 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
4/23/2024 8:33:30 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Engineering Manager on behalf of PCD Engineering Division
|
4/23/2024 8:32:25 AM
|
Submission Triaged
|
4/22/2024 4:51:48 PM
|
Submission received from Applicant
|
4/22/2024 12:29:19 PM
|
Submission request sent to Applicant
|
4/22/2024 12:28:51 PM
|
Submission Triaged
|
4/19/2024 8:23:21 PM
|
Submission received from Applicant
|
4/12/2024 11:15:04 AM
|
Request for Review Comments returned by PCD Administrative Notice
|
4/10/2024 8:02:48 AM
|
Request for Review Comments returned by Parks Advisory Board
|
4/9/2024 5:13:07 PM
|
Submission request sent to Applicant
|
4/9/2024 3:46:46 PM
|
Request for Review Comments returned by PCD Project Manager
|
4/9/2024 10:19:25 AM
|
Request for Review Comments returned by PCD Engineering Division
|
4/9/2024 9:33:09 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
4/9/2024 8:20:00 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
4/3/2024 8:48:04 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
4/2/2024 12:52:32 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
4/1/2024 3:54:07 PM
|
Request for Review Comments returned by County Attorney - Water
|
3/29/2024 9:46:49 AM
|
Request for Review Comments returned by EPC Stormwater Review
|
3/26/2024 1:50:22 PM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by on behalf of PCD Administrative Notice
|
3/26/2024 10:40:34 AM
|
Request for Review Comments returned by EPC Parks Department
|
3/22/2024 11:08:25 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/22/2024 6:55:59 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
3/19/2024 2:01:36 PM
|
Request for Review Comments returned by Lewis Palmer 38
|
3/19/2024 10:22:37 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Bill Crimmel on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
3/19/2024 10:22:34 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by General Email on behalf of Mountain View Electric Association, Inc.
|
3/19/2024 10:22:32 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Vicki Wood on behalf of Lewis Palmer 38
|
3/19/2024 10:22:30 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Melissa Andrews on behalf of Lewis Palmer 38
|
3/19/2024 10:22:28 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Brett Ridgway on behalf of Lewis Palmer 38
|
3/19/2024 10:22:26 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Scott Ridings on behalf of Donald Wescott Fire Protection District
|
3/19/2024 10:22:24 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Santiago Tijerina on behalf of Black Hills Energy-Aquila
|
3/19/2024 10:22:22 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Bob Swatek on behalf of Black Hills Energy-Aquila
|
3/19/2024 10:22:20 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Adam Magoon on behalf of Black Hills Energy-Aquila
|
3/19/2024 10:22:17 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by on behalf of Pikes Peak Regional Building Department
|
3/19/2024 10:22:15 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
3/19/2024 10:22:13 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Glenn West on behalf of 911 Authority - El Paso/Teller County
|
3/19/2024 10:22:11 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
3/19/2024 10:22:09 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
|
3/19/2024 10:22:07 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
3/19/2024 10:22:05 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by on behalf of Parks Advisory Board
|
3/19/2024 10:22:03 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Mikayla Hartford on behalf of EPC Stormwater Review
|
3/19/2024 10:22:01 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Glenn Reese on behalf of EPC Stormwater Review
|
3/19/2024 10:21:59 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Christina Prete on behalf of EPC Stormwater Review
|
3/19/2024 10:21:57 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Jeff Kramer on behalf of EPC Sheriff's Department
|
3/19/2024 10:21:55 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
|
3/19/2024 10:21:53 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Andrew Prehm on behalf of EPC Sheriff's Department
|
3/19/2024 10:21:51 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by on behalf of EPC Parks Department
|
3/19/2024 10:21:49 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Mike McCarthy on behalf of EPC Health Department
|
3/19/2024 10:21:47 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Catherine McGarvy on behalf of EPC Health Department
|
3/19/2024 10:21:45 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by HEAEH LandUse on behalf of EPC Health Department
|
3/19/2024 10:21:43 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Lori Seago on behalf of County Attorney - Water
|
3/19/2024 10:21:41 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by April Willie on behalf of County Attorney - Water
|
3/19/2024 10:21:39 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Lori Seago on behalf of County Attorney - Development Review
|
3/19/2024 10:21:37 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by April Willie on behalf of County Attorney - Development Review
|
3/19/2024 10:21:35 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Kari Parsons on behalf of PCD Project Manager
|
3/19/2024 10:21:33 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Gilbert LaForce on behalf of PCD Engineering Division
|
3/19/2024 10:21:31 AM
|
Request for Review Comments email sent for Project McLean- Hodgen Subdivision (2 Lot Final Plat) for review by Engineering Manager on behalf of PCD Engineering Division
|
3/18/2024 6:11:16 PM
|
Fees paid: 3/18/2024 (Receipt: 1008894)
|
3/18/2024 7:25:34 AM
|
File # Assigned: MS243
|
3/18/2024 7:25:26 AM
|
Submission Triaged
|
3/16/2024 5:36:51 PM
|
Submission received from Applicant
|
10/24/2023 3:37:28 PM
|
Project reopened for Review Comments
|
10/24/2023 3:25:00 PM
|
Payment Request sent: 10/24/2023
|
10/24/2023 3:25:00 PM
|
Project Ready for Approval, pending fees: 10/24/2023
|
10/17/2023 12:56:41 PM
|
Submission request sent to Applicant
|
10/17/2023 10:03:46 AM
|
Submission request canceled
|
10/17/2023 7:03:21 AM
|
Submission request sent to Applicant
|
10/16/2023 3:21:54 PM
|
Project Manager Assigned: Joe Letke
|
10/16/2023 3:21:54 PM
|
EA Assigned: EA2398
|
10/16/2023 3:21:53 PM
|
Project Created
|