Project Review Comments

Back to List


Project Name
Security Water lot line adjustment
Description
Security Water and Sanitation District is proposing to reconstruct a portion of their existing administration building. As part of the reconstruction, the parking area for the facility will be relocated onto a neighboring parcel (6513214023) already owned by Security Water and Sanitation. Additionally, a portion of the existing driveway and landscaping for the facility will be reconfigured to provide better traffic flow onsite. As part of the driveway and parking reconfiguration, the southernmost existing driveway for the facility will be shifted south along Security Boulevard. Site disturbance for the reconstruction will be less than 1-acre
Location
Parcels
6513214023 6513214023 6513214027 6513214027
Applicant
Kimley-Horn and Associates, Inc.
Mitchell Hess ( Mitchell.Hess@kimley-horn.com ) Mitchell Hess ( Mitchell.Hess@kimley-horn.com )
File Number
EXBL241
Project Manager
Kylie Bagley
Status
Active
Created
10/12/2023 3:38:48 PM

View: Project Documents



Review Comments (3)

Link Agency Comment
View PCD Project Manager
6/4/2024 11:14:39 AM
Map Drawing Redlines 6/4/2024 11:14:39 AM
PCD Engineering Division
6/3/2024 9:21:15 AM
EPC Engineering has no comments.

Reviewed by:

Hao Vo, PE
haovo@elpasoco.com
6/3/2024 9:21:15 AM
EPC Stormwater Review
5/28/2024 4:53:14 PM
Review 1: EPC DPW Stormwater does not have comments on any of the uploaded documents.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
5/28/2024 4:53:14 PM