1 story commercial development of two buildings on three lots totaling 1.86 acres Woodmen Road Fees due at the Building Permit. Bent Grass Metro District fees to District due to District,
Location
Parcels
5301101063 5301101063 5301101064 5301101064 5301101065 5301101065
Applicant
Bucher Design Studio
Nick Sallecchia ( nick@bucherdesign.com )
(719) 484-0480
Nick Sallecchia ( nick@bucherdesign.com )
(719) 484-0480
File Number
PPR2342
Project Manager
Christian Haas
Status
Closed
Created
8/14/2023 4:29:04 PM

View: Project Documents



Review Comments (29)

Link Agency Comment
PCD Project Manager
1/2/2024 3:24:46 PM
All Planning, Engineering and Stormwater comments have been resolved. Awaiting approval and recordation of VR2320. 1/2/2024 3:24:46 PM
PCD Engineering Division
1/2/2024 2:00:31 PM
Review 3:

Submit signed ESQCP; all other engineering documents are ready for approval/acceptance.

Reviewed by:
Jeff Rice
jeffrice@elpasoco.com
1/2/2024 2:00:31 PM
EPC Stormwater Review
12/19/2023 12:49:04 PM
Review 3: EPC DPW Stormwater comments have been resolved on the following documents:
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please sign and resubmit the following document:
- ESQCP

EPC DPW Stormwater has no further comments. Planner: no re-review necessary.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
12/19/2023 12:49:04 PM
PCD Project Manager
12/6/2023 11:11:48 AM
All Planning Comments have been resolved. 12/6/2023 11:11:48 AM
View PCD Engineering Division
12/4/2023 8:50:14 AM
FAE 12/4/2023 8:50:14 AM
PCD Engineering Division
12/4/2023 8:56:10 AM
Comments have been resolved on the following documents:

-Traffic memo

See attached comments for the following:

-FAE

Revise site plan to include "Utility and Site Plan" within it and not as a standalone document.

Submit signed/stamped engineering documents in the next submittal.

Reviewed By:
Lupe Packman
Lupepackman@elpasoco.com
12/4/2023 8:56:10 AM
View EPC Stormwater Review
11/30/2023 8:48:15 AM
SWMP 11/30/2023 8:48:15 AM
View EPC Stormwater Review
11/30/2023 8:47:59 AM
GEC Plan 11/30/2023 8:47:59 AM
EPC Stormwater Review
11/21/2023 2:51:40 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plan
- SWMP

Please see my previous V1 comments on the following documents. Revised versions were not uploaded with this submittal.
- GEC Checklist
- PBMP Applicability Form
- SWMP Checklist

Please provide the following document upon resubmittal (the planner will send an upload request). This was requested with Review 1 and not provided.
- ESQCP

EPC DPW Stormwater comments have been resolved on the following documents:
- Drainage Letter

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
11/21/2023 2:51:40 PM
View El Paso County Conservation Dist
11/14/2023 9:36:24 AM
11/14/2023 9:36:24 AM
Upper Black Squirrel Creek GWMD
11/8/2023 2:18:50 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. Thank you. 11/8/2023 2:18:50 PM
View Mountain View Electric Association, Inc.
11/7/2023 1:27:02 PM
See attached comments 11/7/2023 1:27:02 PM
PCD Project Manager
11/3/2023 4:51:52 PM
Building Height on Elevations sheet appears to list height as 123ft when I'm pretty sure you meant 23ft. Please update and resubmit. Site Plan, Lighting Plan, and Landscaping Plan are all good to go. 11/3/2023 4:51:52 PM
View PCD Engineering Division
11/2/2023 5:41:50 PM
Traffic memo 11/2/2023 5:41:50 PM
View PCD Engineering Division
11/2/2023 5:41:06 PM
FAE 11/2/2023 5:41:06 PM
View PCD Engineering Division
11/2/2023 5:40:34 PM
GEC plan 11/2/2023 5:40:34 PM
View PCD Engineering Division
11/2/2023 5:40:09 PM
Drainage letter 11/2/2023 5:40:09 PM
PCD Engineering Division
11/2/2023 5:39:26 PM
Review 1 comments are attached for the following:

-Traffic memo
-Gec plan
-Drainage letter
-FAE

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
11/2/2023 5:39:26 PM
Falcon School District 49
11/2/2023 3:25:22 PM
District 49 has no comment at this time. We respectfully request the opportunity to comment on any future alterations. 11/2/2023 3:25:22 PM
View EPC Stormwater Review
10/31/2023 8:54:38 AM
SWMP Checklist 10/31/2023 8:54:38 AM
View EPC Stormwater Review
10/31/2023 8:52:36 AM
SWMP 10/31/2023 8:52:36 AM
View EPC Stormwater Review
10/31/2023 8:51:46 AM
PBMP Applicability Form 10/31/2023 8:51:46 AM
View EPC Stormwater Review
10/31/2023 8:51:27 AM
GEC Checklist 10/31/2023 8:51:27 AM
Pikes Peak Regional Building Department
10/30/2023 11:36:25 AM
1. Enumerations will require the final recorded document vacating the lot lines prior to signing off any plan submitted to Regional Building Department for permit issuance.
2. Once the lot line is vacated please use 11694 Bent Grass Market View for the larger of the two buildings.
3. If the trash enclosure exceeds 7’ therefore, a separate address will need to be assigned along with a separate permit.




Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
10/30/2023 11:36:25 AM
EPC Stormwater Review
10/31/2023 8:55:30 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter...(to be uploaded with Development Services comments)
- GEC Plan............(to be uploaded with Development Services comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please provide the following document upon resubmittal (the planner will send an upload request):
- ESQCP

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
10/31/2023 8:55:30 AM
Bent Grass Metro
10/26/2023 2:21:13 PM
This proposed project is located within the Bent Grass Metropolitan District boundaries. The District assess’ platting and building permit fees for new development within the District Boundaries, the District also assess’ a mill levy on property within the District Boundaries.

The fees for this year are as follows:
Traffic Signal Fee:
Commercial - $10,000/ACRE
Residential - $1,000/ACRE

Platting Fees:
Commercial- $5500/ACRE
Residential- $5500/ACRE

Building Permit Fees:
Commercial-
Commercial/Industrial/Other non-residential- $1.00/SQUARE FOOT
10/26/2023 2:21:13 PM
View Falcon Fire Protection District
10/25/2023 9:05:48 AM
10/25/2023 9:05:48 AM
View Falcon Fire Protection District
10/25/2023 9:05:11 AM
10/25/2023 9:05:11 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/18/2023 11:00:22 AM
Coordinate with CSU Field Engineering for any gas service connections or designs 719-668-4985 10/18/2023 11:00:22 AM