MSMD Parallell Sewer Line in WHMD
Description
To construct an approximate 1 mile long, 24 to 30-inch diameter wastewater redundancy line from just south of Judge Orr Road talong drainageway north east of Eastonville road to Snaffle Bit. Meridian Service Metropolitan District (MSMD, the District) is nearing construction of a parallel sewer line within the Woodmen Hills Metropolitan District (WHMD) service boundary. The reason for this project being within another district is because MSMD uses (and has for decades) WHMD’s gravity sewer system to convey flows to a shared wastewater lift station. This joint use of WHMD’s sewer system has been allowed via an intergovernmental agreement between the districts. The purpose of this project is to alleviate wastewater flows in existing, shared gravity sewer lines owned by WHMD.
Location
Parcels
4232302003 4232302003
Applicant
JDS-Hydro Consultants, Inc.
Ryan Mangino ( rmangino@jdshydro.com )
(719) 227-0072 x103
Ryan Mangino ( rmangino@jdshydro.com )
(719) 227-0072 x103
File Number
CDR2317
Project Manager
Kari Parsons
Status
Closed
Created
8/14/2023 8:07:11 AM

View: Project Documents



Review Comments (27)

Link Agency Comment
PCD Engineering Division
10/17/2023 3:49:36 PM
Stamped construction drawings were received. Engineering has no further comments at this time. Any approved documents will be uploaded by the project manager.

Reviewed by:
Daniel Torres P.E.
Carlos Hernandez
danieltorres@elpasoco.com
carloshernandez@elpasoco.com
10/17/2023 3:49:36 PM
PCD Project Manager
10/16/2023 2:03:59 PM
Provide signatures on all required doc pages for approval. 10/16/2023 2:03:59 PM
PCD Engineering Division
10/12/2023 7:36:01 AM
Engineering comments have been resolved. Any approved documents will be uploaded by the project manager.

Reviewed by:
Carlos Hernandez
Daniel Torres
carloshernandez@elpasoco.com
danieltorres@elpasoco.com
10/12/2023 7:36:01 AM
View PCD Engineering Division
10/10/2023 7:57:41 AM
V2 GEC Plan Comments 10/10/2023 7:57:41 AM
PCD Engineering Division
10/10/2023 8:01:30 AM
Review 2 comments on the following documents will be uploaded. Please address the minor comments as discussed in the email sent 10-9-2023 and sign (owner & engineer) the GEC plan and CD's for approval.
-GEC
-CD


Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com

& Daniel Torres
danieltorres@elpasoco.com
10/10/2023 8:01:30 AM
View PCD Engineering Division
10/10/2023 7:57:18 AM
V2 CD Comments 10/10/2023 7:57:18 AM
PCD Project Manager
10/9/2023 7:44:17 AM
Please address all comments; sign and stamp docs so they can be approved if comments are addressed. 10/9/2023 7:44:17 AM
View EPC Stormwater Review
10/6/2023 12:23:26 PM
SWMP 10/6/2023 12:23:26 PM
View EPC Stormwater Review
10/6/2023 12:20:26 PM
PBMP 10/6/2023 12:20:26 PM
View EPC Stormwater Review
10/6/2023 12:19:46 PM
GEC Checklist (fill out attached copy of the checklist and sign) 10/6/2023 12:19:46 PM
View EPC Stormwater Review
10/6/2023 12:18:50 PM
ESQCP 10/6/2023 12:18:50 PM
EPC Stormwater Review
10/6/2023 12:08:52 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP
- GEC Checklist (all items addressed - provide signature on clean uploaded copy)
- PBMP Applicability Form
- SWMP

EPC DPW Stormwater comments have been resolved on the following documents:
- GEC Plan
- SWMP Checklist

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
10/6/2023 12:08:52 PM
View EPC Environmental Services
9/26/2023 11:12:02 AM
9/26/2023 11:12:02 AM
Mountain View Electric Association, Inc.
9/25/2023 4:13:43 PM
See comment provided on September 6, 2023 9/25/2023 4:13:43 PM
Mountain View Electric Association, Inc.
9/6/2023 10:46:11 AM
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. 9/6/2023 10:46:11 AM
View PCD Engineering Division
9/5/2023 7:37:32 AM
GEC plan comments 9/5/2023 7:37:32 AM
View PCD Engineering Division
9/5/2023 7:37:01 AM
FAE comments 9/5/2023 7:37:01 AM
View PCD Engineering Division
9/5/2023 7:36:23 AM
Letter of Intent comments 9/5/2023 7:36:23 AM
View EPC Stormwater Review
8/31/2023 9:00:09 AM
SWMP Checklist 8/31/2023 9:00:09 AM
View EPC Stormwater Review
8/31/2023 8:59:45 AM
SWMP 8/31/2023 8:59:45 AM
View EPC Stormwater Review
8/31/2023 8:58:40 AM
PBMP 8/31/2023 8:58:40 AM
View EPC Stormwater Review
8/31/2023 8:58:21 AM
GEC Checklist 8/31/2023 8:58:21 AM
View EPC Stormwater Review
8/31/2023 8:57:50 AM
ESQCP 8/31/2023 8:57:50 AM
PCD Project Manager
8/30/2023 1:04:37 PM
Engineering- Stormwater may provide comments. Planner has no comments. 8/30/2023 1:04:37 PM
PCD Engineering Division
8/29/2023 5:01:35 PM
Review 1 comments will be uploaded by the project manager. Review comments on the following documents:

- Letter of Intent
- Financial Assurance Estimate Form
- GEC Plan

Notes for Applicant:
- A Work in the Right-of-Way permit from El Paso County Department of Public Works is required prior to any work within county right-of-way. Please contact Samantha Sherman Work in the Right-of-Way Permit Coordinator, samanthasherman@elpasoco.com
- It is the applicant's responsibility to ensure all construction easements are obtained from private landowners.
- Please submit construction drawings for the next review and easement documents.

Notes for Planner:
- Please open a slot for Construction Drawings on the next review.
- Please open a slot for easement forms.

Reviewed by:
Carlos Hernandez
Review Engineer
carloshernandez@elpasoco.com
8/29/2023 5:01:35 PM
EPC Stormwater Review
8/30/2023 12:10:46 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP
- GEC Plan...............(to be uploaded with Development Services comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal (the planner will send an upload request):
- CDs

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
8/30/2023 12:10:46 PM
View EPC Environmental Services
8/25/2023 2:18:01 PM
8/25/2023 2:18:01 PM