- Description
- To construct an approximate 1 mile long, 24 to 30-inch diameter wastewater redundancy line from just south of Judge Orr Road talong drainageway north east of Eastonville road to Snaffle Bit. Meridian Service Metropolitan District (MSMD, the District) is nearing construction of a parallel sewer line within the Woodmen Hills Metropolitan District (WHMD) service boundary. The reason for this project being within another district is because MSMD uses (and has for decades) WHMD’s gravity sewer system to convey flows to a shared wastewater lift station. This joint use of WHMD’s sewer system has been allowed via an intergovernmental agreement between the districts. The purpose of this project is to alleviate wastewater flows in existing, shared gravity sewer lines owned by WHMD.
- Location
- Parcels
- 4232302003 4232302003
- Applicant
-
JDS-Hydro Consultants, Inc.
Ryan Mangino ( rmangino@jdshydro.com )
(719) 227-0072 x103 Ryan Mangino ( rmangino@jdshydro.com )
(719) 227-0072 x103 - File Number
- CDR2317
- Project Manager
- Kari Parsons
- Status
- Closed
- Created
- 8/14/2023 8:07:11 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
10/17/2023 3:49:36 PM |
Stamped construction drawings were received. Engineering has no further comments at this time. Any approved documents will be uploaded by the project manager. Reviewed by: Daniel Torres P.E. Carlos Hernandez danieltorres@elpasoco.com carloshernandez@elpasoco.com |
10/17/2023 3:49:36 PM | |
PCD Project Manager
10/16/2023 2:03:59 PM |
Provide signatures on all required doc pages for approval. | 10/16/2023 2:03:59 PM | |
PCD Engineering Division
10/12/2023 7:36:01 AM |
Engineering comments have been resolved. Any approved documents will be uploaded by the project manager. Reviewed by: Carlos Hernandez Daniel Torres carloshernandez@elpasoco.com danieltorres@elpasoco.com |
10/12/2023 7:36:01 AM | |
View |
PCD Engineering Division
10/10/2023 7:57:41 AM |
V2 GEC Plan Comments | 10/10/2023 7:57:41 AM |
PCD Engineering Division
10/10/2023 8:01:30 AM |
Review 2 comments on the following documents will be uploaded. Please address the minor comments as discussed in the email sent 10-9-2023 and sign (owner & engineer) the GEC plan and CD's for approval. -GEC -CD Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com & Daniel Torres danieltorres@elpasoco.com |
10/10/2023 8:01:30 AM | |
View |
PCD Engineering Division
10/10/2023 7:57:18 AM |
V2 CD Comments | 10/10/2023 7:57:18 AM |
PCD Project Manager
10/9/2023 7:44:17 AM |
Please address all comments; sign and stamp docs so they can be approved if comments are addressed. | 10/9/2023 7:44:17 AM | |
View |
EPC Stormwater Review
10/6/2023 12:23:26 PM |
SWMP | 10/6/2023 12:23:26 PM |
View |
EPC Stormwater Review
10/6/2023 12:20:26 PM |
PBMP | 10/6/2023 12:20:26 PM |
View |
EPC Stormwater Review
10/6/2023 12:19:46 PM |
GEC Checklist (fill out attached copy of the checklist and sign) | 10/6/2023 12:19:46 PM |
View |
EPC Stormwater Review
10/6/2023 12:18:50 PM |
ESQCP | 10/6/2023 12:18:50 PM |
EPC Stormwater Review
10/6/2023 12:08:52 PM |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - ESQCP - GEC Checklist (all items addressed - provide signature on clean uploaded copy) - PBMP Applicability Form - SWMP EPC DPW Stormwater comments have been resolved on the following documents: - GEC Plan - SWMP Checklist Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
10/6/2023 12:08:52 PM | |
View |
EPC Environmental Services
9/26/2023 11:12:02 AM |
9/26/2023 11:12:02 AM | |
Mountain View Electric Association, Inc.
9/25/2023 4:13:43 PM |
See comment provided on September 6, 2023 | 9/25/2023 4:13:43 PM | |
Mountain View Electric Association, Inc.
9/6/2023 10:46:11 AM |
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. | 9/6/2023 10:46:11 AM | |
View |
PCD Engineering Division
9/5/2023 7:37:32 AM |
GEC plan comments | 9/5/2023 7:37:32 AM |
View |
PCD Engineering Division
9/5/2023 7:37:01 AM |
FAE comments | 9/5/2023 7:37:01 AM |
View |
PCD Engineering Division
9/5/2023 7:36:23 AM |
Letter of Intent comments | 9/5/2023 7:36:23 AM |
View |
EPC Stormwater Review
8/31/2023 9:00:09 AM |
SWMP Checklist | 8/31/2023 9:00:09 AM |
View |
EPC Stormwater Review
8/31/2023 8:59:45 AM |
SWMP | 8/31/2023 8:59:45 AM |
View |
EPC Stormwater Review
8/31/2023 8:58:40 AM |
PBMP | 8/31/2023 8:58:40 AM |
View |
EPC Stormwater Review
8/31/2023 8:58:21 AM |
GEC Checklist | 8/31/2023 8:58:21 AM |
View |
EPC Stormwater Review
8/31/2023 8:57:50 AM |
ESQCP | 8/31/2023 8:57:50 AM |
PCD Project Manager
8/30/2023 1:04:37 PM |
Engineering- Stormwater may provide comments. Planner has no comments. | 8/30/2023 1:04:37 PM | |
PCD Engineering Division
8/29/2023 5:01:35 PM |
Review 1 comments will be uploaded by the project manager. Review comments on the following documents: - Letter of Intent - Financial Assurance Estimate Form - GEC Plan Notes for Applicant: - A Work in the Right-of-Way permit from El Paso County Department of Public Works is required prior to any work within county right-of-way. Please contact Samantha Sherman Work in the Right-of-Way Permit Coordinator, samanthasherman@elpasoco.com - It is the applicant's responsibility to ensure all construction easements are obtained from private landowners. - Please submit construction drawings for the next review and easement documents. Notes for Planner: - Please open a slot for Construction Drawings on the next review. - Please open a slot for easement forms. Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
8/29/2023 5:01:35 PM | |
EPC Stormwater Review
8/30/2023 12:10:46 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - ESQCP - GEC Plan...............(to be uploaded with Development Services comments) - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Please provide the following documents upon resubmittal (the planner will send an upload request): - CDs Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
8/30/2023 12:10:46 PM | |
View |
EPC Environmental Services
8/25/2023 2:18:01 PM |
8/25/2023 2:18:01 PM |