Project Review Comments

Back to List


Project Name
Utah-Nevada Lane - RV and Self Storage
Description
Site Development Plan for RV and self storage on RR-5 lot
Location
Parcels
5308000002 5308000002 5308000071 5308000071 5308000082 5308000082
Applicant
N.E.S.
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
Andrea Barlow ( abarlow@nescolorado.com )
(719) 471-0073
EA Number
EA2333
File Number
PPR2526
Project Manager
Lacey Dean
Status
Active
Created
5/4/2023 10:23:12 AM

View: Project Documents



Review Comments (25)

Link Agency Comment
View County Attorney - Development Review
10/7/2025 12:51:27 PM
Edits to DMA attached.

Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com.
10/7/2025 12:51:27 PM
View Mountain View Electric Association, Inc.
10/7/2025 11:35:25 AM
See attached comment 10/7/2025 11:35:25 AM
View PCD Project Manager
9/29/2025 5:40:33 PM
V1_SWMP checklist_comments 9/29/2025 5:40:33 PM
View PCD Project Manager
9/29/2025 5:40:19 PM
V1_Storm Water Management Plan (SWMP)_comments 9/29/2025 5:40:19 PM
View PCD Project Manager
9/29/2025 5:39:54 PM
V1_Stormwater Detention & Infiltration Design Data Worksheet (SDI Worksheet)_comments 9/29/2025 5:39:54 PM
View PCD Project Manager
9/29/2025 5:39:12 PM
V1_Grading & Erosion Control checklist_comments 9/29/2025 5:39:12 PM
View PCD Project Manager
9/29/2025 5:38:54 PM
V1_Detention Maintenance Agreement_comments 9/29/2025 5:38:54 PM
View PCD Project Manager
9/29/2025 5:38:40 PM
V1_Grading & Erosion Control Plan_comments 9/29/2025 5:38:40 PM
View PCD Project Manager
9/29/2025 5:37:58 PM
V1_Financial Assurance Forms_comments 9/29/2025 5:37:58 PM
View PCD Project Manager
9/29/2025 5:37:42 PM
V1_Drainage Report - Final_comments 9/29/2025 5:37:42 PM
View PCD Project Manager
9/29/2025 5:29:11 PM
V1_Site Development Plan_comments 9/29/2025 5:29:11 PM
View PCD Project Manager
9/29/2025 5:28:54 PM
V1_Lighting Plan_commetns 9/29/2025 5:28:54 PM
View PCD Project Manager
9/29/2025 5:28:37 PM
V1_Letter of Intent_comments 9/29/2025 5:28:37 PM
View PCD Project Manager
9/29/2025 5:28:23 PM
V1_Landscape Plan drawings_comments 9/29/2025 5:28:23 PM
View PCD Project Manager
9/29/2025 5:28:09 PM
V1_Floor Plans (24 x 36)_comments 9/29/2025 5:28:09 PM
View PCD Project Manager
9/29/2025 5:27:47 PM
V1_Elevation Plans_comments 9/29/2025 5:27:47 PM
PCD Project Manager
9/29/2025 5:27:09 PM
Review 1: EPC Planning Division has comments in green text boxes on the following documents:

- Elevation Plans
- Floor Plans
- Landscape Plan Drawings
- Letter of Intent
- Lighting Plan
- Sie Development Plan

Reviewed by:
Lacey Dean, Associate Planner
laceydean2@elpasoco.com
9/29/2025 5:27:09 PM
View Falcon Fire Protection District
9/29/2025 2:25:22 PM
9/29/2025 2:25:22 PM
Pikes Peak Regional Building Department
9/29/2025 11:53:15 AM
1. Wrecking permits have been issued and finalized for the former structures at 7525 Adventure Way (53080-00-002).
2. A wrecking permit is required for any structures at 7425 Adventure Way (53080-00-071). Enumerations will not approve plans for this project until the wrecking permit for 7425 Adventure Way has been issued.
3. Parcel 53080-00-082 - does not have any building permit history.
4. The first building with the office can use the parcel address of 7525 ADVENTURE WAY, all other buidings and canopies will use the 7525 Adventure Way address with a letter designation (A-N)
5. The trash enclosure is over 7’ in height and will require a separate address and permit. The address for the trash enclosure is 7537 Adventure Way.
6. The fence appears to be 7’ in height. Fences over 7’ in height receive a separate address or permit. In this case, a permit is not required for the fence.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
9/29/2025 11:53:15 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
9/29/2025 9:01:17 AM
Action Item: Gas meter locations on plan view and building elevations must be shown and labeled.

Action Item: Add note " Gas meters must be a minimum of 3-feet from doors, operable windows, or any vents or openings in walls."

Action Item: Add note “CSU Field Engineer to determine final gas meter and service line locations. Contact Field Engineering at 719-668-4985 (Gas) with any questions.”
9/29/2025 9:01:17 AM
PCD Engineering Division
9/29/2025 1:42:54 PM
DPW Engineering review 1 has comments on the following documents:

- Drainage Report
- Financial Assurance Forms
- Letter of Intent
- Grading and erosion control plans

Please include the Road Impact Fee Acknowledgment form with the next submittal.

Review by
Bret Dilts, PE
bretdilts@elpasoco.com
719-520-6864
9/29/2025 1:42:54 PM
EPC Fire and Wildfire Program Manager
9/24/2025 11:21:42 AM
Fire Safety and Wildfire Mitigation Program comments added to the following documents:
- Site Development Plan

Roland Peterson
Fire Safety and Wildfire Mitigation Program Manager
Planning & Community Development
719.520.6075
rolandpeterson@elpasoco.com
9/24/2025 11:21:42 AM
EPC Stormwater Review
9/29/2025 3:36:42 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by PM):
- DMA
- Drainage Report
- FAE
- GEC Plan
- GEC Checklist
- Landscape Plan
- SDI Form
- Site Development Plan
- SWMP
- SWMP Checklist

Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- PCM O&M Manual (You are not required to use it but a template is available at https://publicworks.elpasoco.com/stormwater/)
- PCM - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal) (It's not clear to me from the design if it is necessary to submit the form to the state. Confirm if form is required by state and provide proof of submittal if it is.)

Reviewed by:
Zachary Jannusch
Associate Engineer - Stormwater
719.500.3170
ZacharyJannusch@elpasoco.com
9/29/2025 3:36:42 PM
View EPC Environmental Services
9/18/2025 10:16:02 AM
9/18/2025 10:16:02 AM
EPC Parks Department
9/16/2025 8:57:37 AM
El Paso County Parks Department: The 2022 El Paso County Parks Master Plan shows no impacts to existing or proposed parks, trails, or open space. No regional or urban park fees are necessary for this type of site development application, and El Paso County Parks does not object to the construction of the storage facility at this location. 9/16/2025 8:57:37 AM