Project Review Comments

Back to List


Project Name
Meridian Service Metropolitan District -Latigo Well Sites 2 & 3
Description
Meridian Service Metropolitan District is planning the development of Well Sites #2 and #3 to connect proposed wells to the water system. A major portion of both well site facilities are located underground, however, the electrical equipment is proposed to be enclosed in an 180+/- SF above-grade structure (each site). Site appurtenances include underground vaults, pumps and piping.
Location
well Site 2: 0.8 mi SW of Latigo Blvd and Eastonville Rd Well Site 3: 0.1 mi SW of Latigo Blvd and Eastonville Rd
Parcels
4200000345 4200000345 4200000352 4200000352
Applicant
JDS-Hydro Consultants, Inc.
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
File Number
COM2333
Project Manager
Ashlyn Mathy
Status
Closed
Created
5/3/2023 1:01:52 PM

View: Project Documents



Review Comments (8)

Link Agency Comment
PCD Project Manager
9/26/2023 1:31:41 PM
planning comments have been resolved. 9/26/2023 1:31:41 PM
PCD Engineering Division
9/26/2023 11:32:06 AM
Engineer Review Ver.3

1. No further engineering comments. Drainage Report pending Cnty approval once standard statements have been added with owner and engineer signatures and stamp. Please return FDR V3 with statements added and signatures.

2. A driveway permit application is required. The permit will include a condition of approval noting the Eastonville Road driveway access shown on the site plan is temporary.

3. Road Impact Fee applies to be paid now or with the building permit if applicable. The fees will be based on the "Public/Institutional" unit cost of $3,372 per 1,000 sq ft. Based on the plans provided the road impact fee is anticipated to be $606.96.

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
9/26/2023 11:32:06 AM
View PCD Project Manager
8/30/2023 1:02:25 PM
site plan, engineering comments 8/30/2023 1:02:25 PM
PCD Engineering Division
8/29/2023 4:46:29 PM
Engineer Review Ver.1

1. Comments not addressed on V2_SDP from previous comments listed on V1. Please address comments dealing with temp/perm access and culvert sizing drainage letter.

2. A driveway permit application is required. The permit will include a condition of approval noting the Eastonville Road driveway access shown on the site plan is temporary and will need to be removed and relocated to the west once the future Latigo Trails subdivision and it's associated internal road is constructed. Access to Eastonville is temporary.

3. Road Impact Fee applies to be paid now or with the building permit if applicable. The fees will be based on the "Public/Institutional" unit cost of $3,372 per 1,000 sq ft. Based on the plans provided the road impact fee is anticipated to be $606.96.

Redline comments to the site plan drawing will be uploaded by the project manager.

Thank you.

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
8/29/2023 4:46:29 PM
View PCD Project Manager
6/9/2023 8:33:09 AM
site plan comments 6/9/2023 8:33:09 AM
EPC Stormwater Review
6/7/2023 5:49:47 PM
No ESQCP (stormwater permit) is required for this project, so no detailed review is necessary by EPC DPW Stormwater.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
6/7/2023 5:49:47 PM
Mountain View Electric Association, Inc.
6/7/2023 2:04:07 PM
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. 6/7/2023 2:04:07 PM
PCD Engineering Division
6/7/2023 10:47:20 AM
Review #1.
1. A driveway permit application is required. The permit will include a condition of approval noting the Eastonville Road driveway access shown on the site plan is temporary and will need to be removed and relocated to the west once the future Latigo Trails subdivision and it's associated internal road is constructed.

2. Road Impact Fee applies to be paid now or with the building permit if applicable. The fees will be based on the "Public/Institutional" unit cost of $3,372 per 1,000 sq ft. Based on the plans provided the road impact fee is anticipated to be $606.96.

3. Redline comments to the site plan drawing will be uploaded by the project manager.

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
6/7/2023 10:47:20 AM