Project Details
Search
-
File Number
-
COM2333
-
Project Name
-
Meridian Service Metropolitan District -Latigo Well Sites 2 & 3
-
Description
-
Meridian Service Metropolitan District is planning the development of Well Sites #2 and #3 to connect proposed wells to the water system. A major portion of both well site facilities are located underground, however, the electrical equipment is proposed to be enclosed in an 180+/- SF above-grade structure (each site). Site appurtenances include underground vaults, pumps and piping.
-
Location
-
well Site 2: 0.8 mi SW of Latigo Blvd and Eastonville Rd Well Site 3: 0.1 mi SW of Latigo Blvd and Eastonville Rd
-
Parcels
-
4200000345
4200000345
4200000352
4200000352
-
Applicant
-
JDS-Hydro Consultants, Inc.
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
Gina Mangino ( gmangino@jdshydro.com )
(719) 227-0072 x107
-
File Prefix
-
COM - Commercial over the counter
-
Year
-
2023
-
Project Manager
-
Ashlyn Mathy
-
Status
-
Closed
-
Created
-
5/3/2023 1:01:52 PM
View:
Review Comments
Approved Documents (3)
|
Link
|
Document
|
Date
|
View
|
PBMP Applicability Form
|
10/5/2023 4:00:58 PM
|
View
|
Site Plan Drawing
|
12/3/2024 3:00:31 PM
|
View
|
Drainage Letter
|
10/5/2023 4:00:18 PM
|
Review Documents (7)
Link
|
Document
|
Date
|
View
|
Letter of Intent
|
5/26/2023 10:40:42 AM
|
View
|
PBMP Applicability Form
|
5/26/2023 10:40:44 AM
|
View
|
Site Plan Drawing
|
9/19/2023 2:50:44 PM
|
View
|
Comment Response Letter
|
8/18/2023 3:40:04 PM
|
View
|
Drainage Letter
|
8/18/2023 3:41:05 PM
|
View
|
Drainage Letter
|
9/19/2023 2:50:45 PM
|
View
|
Elevation Plans
|
5/26/2023 10:40:41 AM
|