Project Review Comments
- Project Name
- Bartlett Hay Variance of use
- Description
- 2012 Variance has expired in 2022. BoCC recorded Resolution expired 5 years; PCD Letter allowed 10 year expiration. Requests for hay variance business and related retail sales on the property, requesting no time limit as well.
- Location
- Parcels
- 5312110004 5312110004 5312110009 5312110009
- Applicant
-
land dev consultants
Daniel Kupferer ( dkupferer@ldc-inc.com )
(719) 528-6133 Daniel Kupferer ( dkupferer@ldc-inc.com )
(719) 528-6133 - EA Number
- EA1935
- File Number
- VA241
- Project Manager
- Joe Letke
- Status
- Closed
- Created
- 3/29/2023 8:22:00 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
9/26/2024 1:53:19 PM |
Planning has no further comments. Joe Letke Planner 719-520-7964 |
9/26/2024 1:53:19 PM | |
View |
PCD Project Manager
9/12/2024 10:47:12 AM |
Planning has comments on the following documents: -Site Plan Drawing Joe Letke Planner 719-520-7964 |
9/12/2024 10:47:12 AM |
PCD Engineering Division
9/11/2024 2:57:43 PM |
Engineering Review Ver.2 No further engineer comments Note that the direct access from Old Meridian will be condition limited as there is a local road (Chicago) that provides lower road classification access. This driveway entrance may be required to be closed in the future. Commercial development of the parcels to the west along Chicago will trigger this. A one-way driveway entrance access from Old Meridian will be approved in the interim Driveway access permit has been approved. Thank you. Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
9/11/2024 2:57:43 PM | |
EPC Stormwater Review
9/10/2024 5:24:38 PM |
Review 2: EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Note: The project area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction. Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
9/10/2024 5:24:38 PM | |
PCD Administrative Notice
3/19/2024 1:00:04 PM |
On 3/19/2024, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (12 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $7.68. MB | 3/19/2024 1:00:04 PM | |
EPC Code Enforcement
3/14/2024 11:56:34 AM |
No concerns from Code Enforcement. | 3/14/2024 11:56:34 AM | |
View |
EPC Health Department
3/8/2024 2:29:33 PM |
3/8/2024 2:29:33 PM | |
Upper Black Squirrel Creek GWMD
2/27/2024 2:51:18 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. | 2/27/2024 2:51:18 PM | |
View |
PCD Project Manager
2/20/2024 5:25:42 PM |
-Application Form | 2/20/2024 5:25:42 PM |
View |
PCD Project Manager
2/20/2024 5:25:26 PM |
-Site Plan Drawing | 2/20/2024 5:25:26 PM |
View |
PCD Project Manager
2/20/2024 5:25:12 PM |
-LOI | 2/20/2024 5:25:12 PM |
PCD Project Manager
2/20/2024 5:24:52 PM |
Planning has comments on the following documents: -Application Form -LOI -Site Plan Joe Letke Planner II 719-520-7964 |
2/20/2024 5:24:52 PM | |
PCD Engineering Division
2/20/2024 5:14:00 PM |
Engineering Review Ver.1 Please see engineering comments on the following documents Driveway access permits are required along Old Meridian and Chicago. LOI_V1 SDP_V1 Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
2/20/2024 5:14:00 PM | |
EPC Stormwater Review
2/20/2024 9:52:24 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - Site Plan Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
2/20/2024 9:52:24 AM | |
Falcon School District 49
2/20/2024 8:01:36 AM |
District 49 does not have any comments at this time but respectfully reserves the right to comment on any future submittals. | 2/20/2024 8:01:36 AM | |
Mountain View Electric Association, Inc.
2/19/2024 8:49:37 AM |
MVEA has no objection to the Variance renewal | 2/19/2024 8:49:37 AM | |
Pikes Peak Regional Building Department
2/14/2024 6:59:49 AM |
Enumerations has no comment. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
2/14/2024 6:59:49 AM | |
View |
Falcon Fire Protection District
2/8/2024 8:24:11 AM |
2/8/2024 8:24:11 AM | |
911 Authority - El Paso/Teller County
2/7/2024 9:06:20 AM |
Comments for E911 as follows: Chicago Ave is an acceptable logical continuation In regard to the previously platted 7th Street ROW. It does not appear that there is any intention to construct this roadway. If it is the intention that this ROW be constructed, E911 recommends a name change for this road as it does not fit the criteria for new development. Thank you Justin |
2/7/2024 9:06:20 AM |