Project Review Comments

Back to List


Project Name
Crossroads Mixed Use Filing No. 2, Lot 1
Description
Site development plan for Lot 1, Crossroads Mixed Use Filing 2 SF-22-038
Location
Parcels
5408305005 5408305005
Applicant
Kimley-Horn
Jim Houk ( jhouk@ttplan.net )
(719) 284-7830
Jim Houk ( jhouk@ttplan.net )
(719) 284-7830
EA Number
EA2055
File Number
PPR2311
Project Manager
Ryan Howser
Status
Closed
Created
2/14/2023 10:58:37 AM

View: Project Documents



Review Comments (37)

Link Agency Comment
PCD Project Manager
10/5/2023 4:12:38 PM
Planning Division has no further comments at this time. Approvals will be processed subject to final plat recordation. 10/5/2023 4:12:38 PM
PCD Engineering Division
10/5/2023 10:03:15 AM
All comments have been resolved. The project manager will upload any approved documents.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
10/5/2023 10:03:15 AM
View PCD Project Manager
10/3/2023 5:01:10 PM
PCD Planning Division review 4 - Letter of Intent comments attached 10/3/2023 5:01:10 PM
EPC Stormwater Review
9/21/2023 10:19:42 AM
Review 4: EPC DPW Stormwater comments have been resolved on the following documents:
- Drainage Letter

EPC DPW Stormwater has no further comments. Planner: no re-review necessary.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
9/21/2023 10:19:42 AM
PCD Project Manager
6/30/2023 5:00:37 PM
The letter of intent was not resubmitted. Comments from review 2 have not been addressed. 6/30/2023 5:00:37 PM
View PCD Project Manager
6/30/2023 5:00:13 PM
Site development plan comments attached 6/30/2023 5:00:13 PM
View EPC Stormwater Review
6/28/2023 10:30:51 AM
Drainage Letter 6/28/2023 10:30:51 AM
PCD Engineering Division
6/28/2023 10:04:33 AM
The project manager will upload comments for the following documents:

-Site plan

Submit all engineering documents for signatures.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
6/28/2023 10:04:33 AM
EPC Stormwater Review
6/28/2023 10:29:34 AM
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter

EPC DPW Stormwater comments have been resolved on the following documents:
- Site Development Plan

Please sign, stamp, and resubmit the following doc:
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
6/28/2023 10:29:34 AM
View PCD Project Manager
5/17/2023 4:57:59 PM
Planning and Stormwater comments - site development plan 5/17/2023 4:57:59 PM
View PCD Project Manager
5/17/2023 4:57:36 PM
Planning comments - LOI 5/17/2023 4:57:36 PM
View PCD Project Manager
5/17/2023 4:53:12 PM
Stormwater comments - drainage letter (includes markup summary in the back) 5/17/2023 4:53:12 PM
PCD Engineering Division
5/17/2023 4:28:44 PM
Comments have been resolved for the following documents:

-Drainage report
-FAE
-Site plan
-Gec Plan

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
5/17/2023 4:28:44 PM
EPC Stormwater Review
5/17/2023 4:07:51 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter.....(to be uploaded by Ryan)
- Site Development Plan....(to be uploaded by Ryan)

EPC DPW Stormwater comments have been resolved on the following documents:
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- Storm Plan
- SWMP
- SWMP Checklist
- Utility Plan

Please sign, stamp, and resubmit the following doc:
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
5/17/2023 4:07:51 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/4/2023 7:39:06 AM
CSU Water/Wastewater has not Comments,

Contact CSU Gas and Electric Field Engineering for service requirements(719)668-5564
5/4/2023 7:39:06 AM
View EPC Health Department
4/20/2023 9:32:50 PM
4/20/2023 9:32:50 PM
View PCD Project Manager
3/23/2023 3:35:55 PM
SDP comments 3/23/2023 3:35:55 PM
View PCD Project Manager
3/23/2023 3:35:43 PM
LOI comments 3/23/2023 3:35:43 PM
View PCD Project Manager
3/23/2023 3:35:23 PM
Landscape plan comments 3/23/2023 3:35:23 PM
View PCD Project Manager
3/23/2023 3:35:09 PM
GEC plan comments 3/23/2023 3:35:09 PM
View PCD Project Manager
3/23/2023 3:34:56 PM
FAE comments 3/23/2023 3:34:56 PM
View PCD Project Manager
3/23/2023 3:34:40 PM
Drainage letter comments 3/23/2023 3:34:40 PM
View EPC Stormwater Review
3/23/2023 10:24:56 AM
Utility Plan 3/23/2023 10:24:56 AM
View EPC Stormwater Review
3/23/2023 10:24:27 AM
SWMP Checklist 3/23/2023 10:24:27 AM
View EPC Stormwater Review
3/23/2023 10:24:06 AM
SWMP 3/23/2023 10:24:06 AM
View EPC Stormwater Review
3/23/2023 10:23:44 AM
Storm Plan 3/23/2023 10:23:44 AM
View EPC Stormwater Review
3/23/2023 10:23:22 AM
PBMP Applicability Form 3/23/2023 10:23:22 AM
View EPC Stormwater Review
3/23/2023 10:23:05 AM
GEC Checklist 3/23/2023 10:23:05 AM
View EPC Stormwater Review
3/23/2023 10:22:44 AM
ESQCP 3/23/2023 10:22:44 AM
EPC Stormwater Review
3/23/2023 10:25:51 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter.....(to be uploaded by Lupe)
- ESQCP
- FAE.......................(to be uploaded by Lupe)
- GEC Plan..............(to be uploaded by Lupe)
- GEC Checklist
- PBMP Applicability Form
- Site Development Plan....(to be uploaded by Lupe)
- Storm Plan
- SWMP
- SWMP Checklist
- Utility Plan

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
3/23/2023 10:25:51 AM
View Colorado Springs Airport Advisory Commission
3/22/2023 4:06:48 PM
The attached summary with comments was presented at the March 22, 2023 Airport Advisory Commission meeting with no objections. 3/22/2023 4:06:48 PM
PCD Engineering Division
3/23/2023 1:33:17 PM
Review 1 comments will be uploaded by the project manager for the following documents:

-FAE
-Drainage letter
-Site plan
-Grading and Erosion Control Plan

Reviewed By:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
3/23/2023 1:33:17 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/20/2023 10:55:26 AM
Add the following notes to the plan set.

General Notes for Preliminary Utility Plans
Property Owner(s) acknowledge and agree to the following upon approval of Preliminary Utility Plan:
1. Colorado Springs Utilities (Springs Utilities) shall make the final determination of the location of all water,
wastewater, electric and gas facilities, which may not be the same location as shown on this Preliminary Utility
Plan.
2. Property Owner(s) (“Owner”) acknowledges that the connection and/or extension of utility services to the
property identified in this Preliminary Utility Plan (“Property”) shall be in accord with all applicable codes and
regulations, Springs Utilities Line Extension & Service Standards (“Standards”), Tariffs, Colorado Springs City
Code, resolutions, and policies, and Pikes Peak Regional Building Department codes, in effect at the time of
utility service connection and/or extension.
3. Owner acknowledges responsibility for the costs of extensions or utility system improvements that Springs
Utilities determines necessary to provide utility services to the Property or to ensure timely development of
integrated utility systems serving the Property and areas outside the Property (including the costs to design and
install water systems, wastewater collection systems, and any gas or electric lines to and within the Property).
Owner may be eligible for a cost Recovery Agreement as provided in Utilities’ Rules and Regulations.
4. Springs Utilities utility services are available on a “first-come, first-served” basis, and therefore no specific
allocations or amounts of utility services, facilities, capacities or supplies are reserved for the Owner, and
Springs Utilities makes no commitment as to the availability of any utility service until such time as an
application for permanent service is approved by Springs Utilities.
5. The relocation or alteration of any existing utility facilities within the Property will be at the Owner’s sole cost and
expense. If Springs Utilities determines that Owner’s relocation or alteration requires new or updated
easements, Owner shall convey those easements prior to relocating or altering the existing utility facilities.
6. Owner shall dedicate by plat and/or convey by recorded document, all property and easements that Springs
Utilities determines are required for all utility system facilities necessary to serve the Property or to ensure
development of an integrated utility system. All easements granted by separate instrument shall utilize Springs
Utilities’ then-current Permanent Easement Agreement form.
7. The water system facilities must meet Springs Utilities criteria for water quality, reliability and pressure,
including looping requirements (see Springs Utilities Line Extension and Service Standards).
8. Owner recognizes that the extension of water system facilities may affect the quality of water in the Springs
Utilities water system. When water quality is affected, Owner acknowledges responsibility for any costs that
Springs Utilities determines necessary in order to maintain water quality in its system as a result of Owner’s
water system extensions. Owner may be required to submit a Water Quality Plan for the project.
9. Owner must contact Springs Utilities Field Engineering to determine the location of all natural gas and electric
meters and transformers and to secure approval of gas-service-line pressures in excess of Springs Utilities
standard gas system pressure. (Contact Field Engineering North 668-4985 or South 668-5564).
10. It shall not be permissible for any person to modify the grade of the earth within any Springs Utilities easement or
rights of way without the written approval of Springs Utilities. Improvements, structures and trees shall not be
located within utility easement, shall not violate National Electric Safety Code (NESC) provisions and
clearances, and shall not impair access or the ability to maintain utility facilities.
11. Springs Utilities approval of this Preliminary Utility Plan shall not be construed as a limitation upon the authority
of Springs Utilities to apply its Standards; and if there are any conflicts between any approved drawings and any
provision of Standards or the City Code, then the Standards or City Code shall apply. Springs Utilities’ approval
of this Preliminary Utility Plan shall not be construed as a limitation upon the authority of the City of Colorado
Springs or Springs Utilities to adopt different ordinances, rules, regulations, resolutions, policies or codes which
change any of the provisions of the Standards so long as these apply to the City generally and are in accord with
the then-current tariffs, rates and policies of Springs Utilities
3/20/2023 10:55:26 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/20/2023 10:54:51 AM
Show proposed gas and electric meter locations on the building elevation and plan drawings. 3/20/2023 10:54:51 AM
Pikes Peak Regional Building Department
3/20/2023 10:06:09 AM
1. Address assigned to lot 2 is 7331 Central Rail Point, not way. Please correct the suffix on the street name.
2. If the trash enclosure fencing is over 7’, an address will be assigned and a separate permit will be required.
No further comment.

Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
3/20/2023 10:06:09 AM
Cherokee Metro Dist
3/17/2023 9:23:12 AM
The attached plans are not accepted pending the following comments:

Maintain 10' of separation between water and sewer services for entire length
Show curb box at property line
3/17/2023 9:23:12 AM
Mountain View Electric Association, Inc.
3/16/2023 3:13:29 PM
This is not within MVEA territory 3/16/2023 3:13:29 PM