View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
10/16/2022 9:44:35 AM |
All Stormwater comments have been addressed. Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
10/16/2022 9:44:35 AM | |
PCD Engineering Division
10/10/2022 3:34:00 PM |
PCD Engineering comments have been resolved. The engineering documents will be uploaded once approved by the ECM administrator. reviewed by: Daniel Torres danieltorres@elpasoco.com |
10/10/2022 3:34:00 PM | |
View |
PCD Engineering Division
9/8/2022 12:00:29 PM |
GEC Plan redlines | 9/8/2022 12:00:29 PM |
View |
PCD Engineering Division
9/8/2022 12:00:04 PM |
FAE redlines | 9/8/2022 12:00:04 PM |
View |
PCD Engineering Division
9/8/2022 11:59:05 AM |
Drainage Report Redlines | 9/8/2022 11:59:05 AM |
View |
EPC Stormwater Review
9/8/2022 11:25:25 AM |
SWMP Checklist_v1 | 9/8/2022 11:25:25 AM |
View |
EPC Stormwater Review
9/8/2022 11:24:59 AM |
SWMP_v1 | 9/8/2022 11:24:59 AM |
View |
EPC Stormwater Review
9/8/2022 11:24:11 AM |
GEC Checklist_v1 | 9/8/2022 11:24:11 AM |
EPC Stormwater Review
9/8/2022 11:12:31 AM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...(to be uploaded by PM with PCD comments) - FAE.......................(to be uploaded by PM with PCD comments) - GEC Plan...............(to be uploaded by PM with PCD comments) - GEC Checklist - SWMP - SWMP Checklist Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
9/8/2022 11:12:31 AM | |
PCD Project Manager
9/2/2022 2:39:46 PM |
Planning Division has no comments regarding this request. Comments will be uploaded by PCD Engineering / EPC Stormwater. | 9/2/2022 2:39:46 PM | |
PCD Engineering Division
9/1/2022 3:48:07 PM |
Review 1 comments on the following documents will be uploaded: -Drainage Report -FAE -GEC Plan reviewed by: Daniel Torres danieltorres@elpasoco.com |
9/1/2022 3:48:07 PM |