Project Review Comments
- Project Name
- Esteban Rodriguez Sketch Plan
- Description
- 450+ acres of mixed use commercial and varying levels of residential density
- Location
- Parcels
- 4300000534 4300000534 4300000537 4300000537 4300000538 4300000538
- Applicant
-
William Guman & Associates, Ltd.
Bill Guman ( bill@guman.net )
(719) 633-9700 Bill Guman ( bill@guman.net )
(719) 633-9700 - EA Number
- EA2297
- File Number
- SKP237
- Project Manager
- Ryan Howser
- Status
- Closed
- Created
- 6/15/2022 10:19:47 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
9/24/2024 4:40:51 PM |
No additional engineering comments. The approved engineering documents will be uploaded onto EDARP by the project manager once approved by the ECM Administrator. reviewed by: Daniel Torres danieltorres@elpasoco.com 719-520-6305 |
9/24/2024 4:40:51 PM | |
View |
PCD Engineering Division
8/22/2024 10:33:13 PM |
MDDP comments | 8/22/2024 10:33:13 PM |
View |
PCD Engineering Division
8/22/2024 10:32:14 PM |
TIS comments | 8/22/2024 10:32:14 PM |
View |
PCD Engineering Division
8/22/2024 10:30:53 PM |
Sketch Plan comments | 8/22/2024 10:30:53 PM |
PCD Project Manager
8/22/2024 5:07:00 PM |
Review 3: PCD Planning has no further comments at this time. | 8/22/2024 5:07:00 PM | |
PCD Engineering Division
8/22/2024 4:59:46 PM |
Review 3: Minor engineering comments on the following documents will be uploaded by the project manager: -Sketch Plan -TIS -MDDP reviewed By: Daniel Torres danieltorres@elpasoco.com |
8/22/2024 4:59:46 PM | |
View |
EPC Health Department
7/13/2024 5:52:05 PM |
7/13/2024 5:52:05 PM | |
Peyton 23
6/10/2024 1:53:32 PM |
Peyton School District 23jt does not have new comments at this time but still supports the comments submitted earlier. Greg Land Director of Facilities Peyton School District 13990 Bradshaw Rd. Peyton, CO 80831 719-749-2330 |
6/10/2024 1:53:32 PM | |
View |
PCD Engineering Division
5/31/2024 11:53:33 PM |
Letter of intent comment (planning comment) | 5/31/2024 11:53:33 PM |
View |
PCD Engineering Division
5/31/2024 11:52:47 PM |
TIS comments | 5/31/2024 11:52:47 PM |
View |
PCD Engineering Division
5/31/2024 11:52:01 PM |
MDDP comments | 5/31/2024 11:52:01 PM |
View |
PCD Engineering Division
5/31/2024 11:49:00 PM |
Sketch Plan Comments | 5/31/2024 11:49:00 PM |
PCD Engineering Division
5/31/2024 11:54:01 PM |
Review 2 engineering comments on the following documents will be uploaded: -Sketch Plan -MDDP -TIS reviewed By: Daniel Torres danieltorres@elpasoco.com |
5/31/2024 11:54:01 PM | |
PCD Project Manager
5/28/2024 7:29:27 AM |
Review 2: PCD Planning Division comments have been provided (in green) on the following uploaded documents: - Letter of Intent (informational comment only; no revision needed) - Sketch Plan Comments will be uploaded by the appropriate review engineer upon completion of their review. |
5/28/2024 7:29:27 AM | |
EPC Stormwater Review
5/22/2024 3:42:10 PM |
Review 2: EPC DPW Stormwater comments have been resolved on the following documents: - MDDP EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
5/22/2024 3:42:10 PM | |
View |
EPC Parks Department
5/20/2024 4:16:37 PM |
El Paso County Parks and Community Services Department, Final Comments, 2nd Submittal - Please See Attached Documents for Updated and Additional Comments and Recommendations (Originally endorsed by the Park Advisory Board on December 13, 2023) | 5/20/2024 4:16:37 PM |
Mountain View Electric Association, Inc.
5/13/2024 7:49:43 AM |
MVEA has no comment on the Sketch Plan | 5/13/2024 7:49:43 AM | |
View |
Colorado Department of Transportation - Pueblo Office
1/3/2024 12:36:45 PM |
1/3/2024 12:36:45 PM | |
View |
Colorado Parks and Wildlife
12/30/2023 10:01:51 AM |
12/30/2023 10:01:51 AM | |
View |
Parks Advisory Board
12/14/2023 11:17:05 AM |
El Paso County Parks and Community Services Department Final Comments - Please See Attached Documents (Park Advisory Board Endorsed 12/13/2023) | 12/14/2023 11:17:05 AM |
View |
PCD Project Manager
12/5/2023 1:07:20 PM |
Review 1: Sketch Plan comments | 12/5/2023 1:07:20 PM |
View |
EPC Stormwater Review
12/4/2023 9:03:49 AM |
TIS | 12/4/2023 9:03:49 AM |
View |
EPC Stormwater Review
12/4/2023 9:01:39 AM |
Soils and Geology Report | 12/4/2023 9:01:39 AM |
View |
EPC Stormwater Review
12/4/2023 8:59:22 AM |
Letter of Intent | 12/4/2023 8:59:22 AM |
View |
EPC Stormwater Review
12/4/2023 8:58:19 AM |
MDDP | 12/4/2023 8:58:19 AM |
View |
Upper Black Squirrel Creek GWMD
12/3/2023 3:34:20 PM |
12/3/2023 3:34:20 PM | |
PCD Engineering Division
12/3/2023 10:24:53 PM |
Review 1 comments on the following documents shall be uploaded: -Letter of Intent -MDDP -TIS: comments from outside traffic consultant and DPW -Sketch Plan -Soils and Geology Report Reviewed by: Daniel Torres danieltorres@elpasoco.com |
12/3/2023 10:24:53 PM | |
Pikes Peak Regional Building Department
12/1/2023 4:06:34 PM |
Due to the general nature of the sketch plan, Enumerations has no specific comments. Enumerations will have more comments to any development plans submitted for this sketch plan. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
12/1/2023 4:06:34 PM | |
PCD Project Manager
12/1/2023 1:49:16 PM |
Review 1: PCD Planning Division comments have been provided (in green) on the following uploaded documents: - Letter of Intent - Sketch Plan Comments will be uploaded by the appropriate review engineer upon completion of their review. |
12/1/2023 1:49:16 PM | |
EPC Stormwater Review
12/4/2023 9:04:42 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document: - MDDP Additional documents uploaded with Planning and Engineering comments on them that I did not have any comments on: - Letter of Intent - Sketch Plan - Soils and Geology Report - TIS Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
12/4/2023 9:04:42 AM | |
Colorado Geological Survey
11/27/2023 2:14:40 PM |
As requested, the Colorado Geological Survey (CGS) has reviewed the Esteban Rodriguez Sketch Plan (County File# SKP237, located 38.9534, -104.5328). Documents with the submittal include a Soil and Geology Study (RMG, Job No. 190388, April 27, 2023). CGS agrees, in general, with the geologic interpretation and identification of hazards and constraints related to the geology presented by RMG. As noted on the sketch plan, RMG’s recommendations should be strictly adhered to in the development of this subdivision. Potential flooding and shallow groundwater are significant constraints to development. CGS recommends that the sketch plan note that no basements or below-grade inhabitable space are allowed without a yearlong monitoring program that gathers groundwater elevation data. This information will determine if an underdrain system or combination of other mitigation, such as raising site grades or garden-level basement construction, is warranted for the subdivision. Submitted 11.27.2023 by Jonathan R. Lovekin, P.G. Senior Engineering Geologist, Colorado Geological Survey, jlovekin@mines.edu. |
11/27/2023 2:14:40 PM | |
View |
Traffic Consultant Wilson Co
11/22/2023 8:49:54 AM |
TIS Review Memo | 11/22/2023 8:49:54 AM |
View |
Peyton 23
11/21/2023 3:33:11 PM |
11/21/2023 3:33:11 PM | |
View |
El Paso County Conservation Dist
11/21/2023 10:42:02 AM |
Brief comments attached as a .pdf. | 11/21/2023 10:42:02 AM |
View |
EPC Parks Department
11/21/2023 9:44:00 AM |
El Paso County Parks and Community Services Department Preliminary Comments - Please See Attached Documents (To be presented to the Park Advisory Board for Endorsement on 12/13/2023) | 11/21/2023 9:44:00 AM |
Mountain View Electric Association, Inc.
11/20/2023 3:33:45 PM |
MVEA has no comment on the Sketch Plan | 11/20/2023 3:33:45 PM | |
Schriever AFB
11/14/2023 10:47:39 AM |
No comment. | 11/14/2023 10:47:39 AM | |
View |
Falcon Fire Protection District
11/13/2023 9:03:00 AM |
11/13/2023 9:03:00 AM | |
County Attorney - Development Review
11/9/2023 1:30:22 PM |
No comments at this time. | 11/9/2023 1:30:22 PM | |
View |
Colorado Division of Water Resources
11/9/2023 1:13:02 PM |
11/9/2023 1:13:02 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/9/2023 9:51:48 AM |
CSU does not have comments at this time | 11/9/2023 9:51:48 AM | |
View |
Meadow Lake Airport Association
11/8/2023 5:57:42 AM |
Thank you for the opportunity to review ... MLAA comments attached | 11/8/2023 5:57:42 AM |
County Attorney - Water
11/7/2023 2:57:29 PM |
The County Attorney's Office will not provide recommendations or comments on the sufficiency of water supply at the sketch plan phase. | 11/7/2023 2:57:29 PM | |
RBD Floodplain
11/7/2023 8:37:30 AM |
RBC313.18.5 Subdivision Proposals. FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on plats for subdivision proposals and other proposed developments that contain at least fifty lots or five (5) acres, whichever is less; All buildable lots less than two and one half (2½) acres in size are required to be located entirely outside of the 100-year floodplain. Lands within the 100-year floodplain shall be established in a tract, and require that the owner maintain the tract. Buildable lots two and one half (2½) acres and larger, are required to have the 100-year floodplain contained in a drainage easement dedicated by plat in the name of the governing body with the restrictions of “No Build” and “No Storage of any Materials”; The parcel is located within the current effective Zone A floodplain with no BFEs(no supporting model available). Draft model backed BFEs for this area have been developed as part of Phase 1 for the ongoing El Paso County, CO, Risk MAP Project”. The data has been reviewed and approved through FEMA’s QA/QC process (May 11, 2022) and is currently in the MIP (Case No. 19-08-0037s). The Phase 1/Base Level Engineering outputs and Zone A ready deliverables are, under the following folder: K:/FY2019/19-08-0037S/Discovery - BLE - El Paso and Teller Counties, CO - FY18 - 04/Discovery Data Capture - Discovery Data Capture - El Paso and Teller Counties, CO - 01/El Paso_Discovery_1 BFEs from the aforementioned study should be shown on the final plat to comply with RBC 313.18.5 |
11/7/2023 8:37:30 AM |