Project Details

Search


File Number
SKP237
Project Name
Esteban Rodriguez Sketch Plan
Description
450+ acres of mixed use commercial and varying levels of residential density
Parcels
4300000534 4300000534 4300000537 4300000537 4300000538 4300000538
Applicant
William Guman & Associates, Ltd.
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
EA Number
EA2297
File Prefix
SKP - Sketch Plan
Year
2023
Project Manager
Ryan Howser
Status
Closed
Created
6/15/2022 10:19:47 AM

View: Review Comments


Approved Documents (3)

Link Document
View Sketch Plan Drawing(s)
View Traffic Impact Study
View Master Development Drainage Plan (MDDP)


Additional Documents (21)

Link Document Comment
View Hearing Notice with Vicinity Map Hearing Notice for Planning Commission hearing on 9/19/2024 and BoCC hearing on 10/10/2024. MM
View Selected Range - Parcel 4300000534 Selected range was 500 feet. MM
View Selected Range - Parcel 4300000537 Selected range was 500 feet. MM
View Selected Range - Parcel 4300000538 Selected range was 500 feet. MM
View Mailing Labels for all 3 parcel numbers PCD mailed 22 notifications to surrounding property owners on 9/9/2024. MM
View PC & BoCC Poster Poster for Planning Commission hearing on 9/19/2024 and BoCC hearing on 10/10/2024. MM
View Notarized - Affidavit for Notice of Public Hearing
View Staff Report Final with Attachments ( with RES and PG#s) MM
View Posted Picture - Poster All posters are installed along Judge Orr Road frontage.
View Posted Picture - Poster All posters are installed along Judge Orr Road frontage.
View Posted Picture - Poster All posters are installed along Judge Orr Road frontage.
View Posted Picture - Poster All posters are installed along Judge Orr Road frontage.
View Opposition - Lance Erickson
View Opposition - Kailina Erickson
View Opposition - Jeannette and Kevin Weaver
View PC SIGNED RESOLUTION PC Hearing 9/19/24
View Returned Notice - 9/27/24
View BOCC MEMO PACKET WITH ATTACHMENTS For BoCC Hearing on 10/10/24 MM
View Adopted PC Minutes
View BOCC Hearing Agenda
View Recorded BoCC Resolution 24-391 For BoCC hearing on 10/10/24


Review Documents (27)

Link Document Date
View Adjacent Property Owner Notification (Includes letter and certified mailing receipts) 6/5/2023 12:52:59 PM
View Application/Petition Form 8/30/2023 12:39:20 PM
View Legal Description (MS WORD Version required) 5/15/2023 3:44:44 PM
View Letter of Intent 6/19/2024 4:39:19 PM
View Title Commitment (Current within 30 days of submittal) 10/17/2023 12:28:45 PM
View Colorado Geological Survey Receipt 6/19/2023 9:13:38 AM
View Mineral Rights Certification 5/30/2023 4:39:21 PM
View Sketch Plan Drawing(s) 9/4/2024 1:42:03 PM
View Wildlife Report 6/20/2023 3:50:16 PM
View Natural Landforms, Vegetation, Riparian Analysis 6/20/2023 3:52:54 PM
View Soils & Geology Report 2/22/2024 10:59:02 AM
View Subdivision Summary Sheet 8/2/2023 3:24:09 PM
View Traffic Impact Study 9/13/2024 11:29:25 AM
View Wastewater Disposal Report 7/5/2023 9:43:45 AM
View Water Resources Report 7/5/2023 9:52:34 AM
View Water Supply Information Summary 7/5/2023 9:59:16 AM
View LSC Responses to Comments CDOT 5/9/2024 1:53:51 PM
View LSC Responses to Comments Wilson 5/9/2024 1:55:34 PM
View LSC Responses to EPC TIS redlines 5/9/2024 1:56:48 PM
View LSC Responses to Improvements Table Redlines 8/1/2024 1:42:10 PM
View LSC Responses to TIS Redline Comments 8/1/2024 1:42:11 PM
View Master Development Drainage Plan (MDDP) 9/4/2024 7:03:36 AM
View MDDP Comment Responses 7/26/2024 1:42:53 PM
View soils report response to comments 2/22/2024 11:02:00 AM
View Transmission Easement Agreement 8/22/2023 4:02:18 PM
View Wastewater Letter- central services 7/31/2023 1:29:03 PM
View Water Letter- Central Service 7/31/2023 1:13:43 PM



Events (151)

Date Comment
10/10/2024 10:22:35 AM Project Closed
10/10/2024 10:22:35 AM Project Approved: 10/10/2024
9/24/2024 5:10:30 PM Project Ready for Approval requests. Review Comment period is complete.
9/24/2024 4:43:48 PM Request for Review Comments returned by PCD Engineering Division
9/13/2024 3:59:44 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
9/13/2024 3:59:42 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
9/13/2024 3:58:50 PM Submission Triaged
9/13/2024 3:58:20 PM Fees paid: 9/13/2024 (Receipt: 1009582)
9/13/2024 2:14:32 PM Submission received from Applicant
8/23/2024 9:26:57 AM Submission request sent to Applicant
8/22/2024 10:35:03 PM Request for Review Comments returned by PCD Engineering Division
8/22/2024 5:07:08 PM Request for Review Comments returned by PCD Project Manager
8/2/2024 2:24:17 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
8/2/2024 2:24:13 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
8/2/2024 2:24:12 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
8/2/2024 2:21:16 PM Submission Triaged
8/2/2024 2:18:12 PM Submission received from Applicant
7/13/2024 5:55:29 PM Request for Review Comments returned by EPC Health Department
6/10/2024 2:04:54 PM Request for Review Comments returned by Peyton 23
6/3/2024 9:17:49 AM Submission request sent to Applicant
5/31/2024 11:54:15 PM Request for Review Comments returned by PCD Engineering Division
5/28/2024 8:06:59 AM Request for Review Comments returned by PCD Project Manager
5/22/2024 3:42:25 PM Request for Review Comments returned by EPC Stormwater Review
5/20/2024 4:17:27 PM Request for Review Comments returned by EPC Parks Department
5/13/2024 8:09:58 AM Request for Review Comments returned by RBD Floodplain
5/13/2024 7:49:52 AM Request for Review Comments returned by Mountain View Electric Association, Inc.
5/10/2024 10:20:49 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Greg Land on behalf of Peyton 23
5/10/2024 10:20:47 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Derek Burnside on behalf of Peyton 23
5/10/2024 10:20:45 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
5/10/2024 10:20:43 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain
5/10/2024 10:20:41 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
5/10/2024 10:20:39 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
5/10/2024 10:20:37 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
5/10/2024 10:20:35 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Shannon Mustoe on behalf of EPC Stormwater Review
5/10/2024 10:20:34 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
5/10/2024 10:20:32 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Glenn Reese on behalf of EPC Stormwater Review
5/10/2024 10:20:30 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Christina Prete on behalf of EPC Stormwater Review
5/10/2024 10:20:28 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by on behalf of EPC Parks Department
5/10/2024 10:20:26 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Mike McCarthy on behalf of EPC Health Department
5/10/2024 10:20:24 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Catherine McGarvy on behalf of EPC Health Department
5/10/2024 10:20:22 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by HEAEH LandUse on behalf of EPC Health Department
5/10/2024 10:20:18 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Kari Parsons on behalf of PCD Project Manager
5/10/2024 10:20:12 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
5/10/2024 10:20:10 AM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
5/10/2024 10:09:29 AM Submission Triaged
5/10/2024 9:28:07 AM Submission received from Applicant
1/3/2024 12:36:53 PM Request for Review Comments returned by Colorado Department of Transportation - Pueblo Office
12/30/2023 10:02:01 AM Request for Review Comments returned by Colorado Parks and Wildlife
12/14/2023 11:17:57 AM Request for Review Comments returned by Parks Advisory Board
12/5/2023 1:08:26 PM Submission request sent to Applicant
12/5/2023 1:07:25 PM Request for Review Comments returned by PCD Project Manager
12/4/2023 9:06:01 AM Request for Review Comments returned by EPC Stormwater Review
12/3/2023 10:27:13 PM Request for Review Comments returned by PCD Engineering Division
12/3/2023 3:34:37 PM Request for Review Comments returned by Upper Black Squirrel Creek GWMD
12/1/2023 4:08:56 PM Request for Review Comments returned by Pikes Peak Regional Building Department
12/1/2023 1:49:23 PM Request for Review Comments returned by PCD Project Manager
11/27/2023 2:15:06 PM Request for Review Comments returned by Colorado Geological Survey
11/22/2023 8:52:50 AM Request for Review Comments returned by Traffic Consultant Wilson Co
11/21/2023 3:33:34 PM Request for Review Comments returned by Peyton 23
11/21/2023 10:42:11 AM Request for Review Comments returned by El Paso County Conservation Dist
11/21/2023 9:44:44 AM Request for Review Comments returned by EPC Parks Department
11/20/2023 3:33:51 PM Request for Review Comments returned by Mountain View Electric Association, Inc.
11/14/2023 10:48:04 AM Request for Review Comments returned by Schriever AFB
11/13/2023 9:03:40 AM Request for Review Comments returned by Falcon Fire Protection District
11/9/2023 1:30:28 PM Request for Review Comments returned by County Attorney - Development Review
11/9/2023 1:13:13 PM Request for Review Comments returned by Colorado Division of Water Resources
11/9/2023 9:51:57 AM Request for Review Comments returned by Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/8/2023 5:58:11 AM Request for Review Comments returned by Meadow Lake Airport Association
11/7/2023 2:57:38 PM Request for Review Comments returned by County Attorney - Water
11/7/2023 8:41:05 AM Request for Review Comments returned by RBD Floodplain
11/6/2023 2:25:34 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Wilson & Company ,Inc on behalf of Traffic Consultant Wilson Co
11/6/2023 2:25:31 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Eric Lundberg on behalf of Traffic Consultant Wilson Co
11/6/2023 2:25:28 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Darren Horstmeier on behalf of Schriever AFB
11/6/2023 2:25:26 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Greg Land on behalf of Peyton 23
11/6/2023 2:25:24 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Derek Burnside on behalf of Peyton 23
11/6/2023 2:25:21 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Tyson Floersheim on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:19 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Travis Sauder on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:17 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Tim Kroening on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:15 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Sarah Watson on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:13 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Philip Gurule on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:11 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Karen Voltura on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:09 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Corey Adler on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:07 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Cassidy English on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:05 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Drew Vrbenec on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:03 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Aaron Berscheid on behalf of Colorado Parks and Wildlife
11/6/2023 2:25:01 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Colorado Geological Survey on behalf of Colorado Geological Survey
11/3/2023 5:08:17 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Rob MacDonald on behalf of Pikes Peak Area Council of Governments
11/3/2023 5:08:15 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by General Email on behalf of Mountain View Electric Association, Inc.
11/3/2023 5:08:13 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Dave Elliott on behalf of Meadow Lake Airport Association
11/3/2023 5:08:10 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Trent Harwig on behalf of Falcon Fire Protection District
11/3/2023 5:08:08 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by John Paget on behalf of El Paso County Fire Marshall
11/3/2023 5:08:06 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Mariah Hudson on behalf of El Paso County Conservation Dist
11/3/2023 5:08:04 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Dave Munger on behalf of Council of Neighborhood Organizations (CONO)
11/3/2023 5:08:01 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Tim Thomas on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/3/2023 5:07:59 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Paul Clifton on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/3/2023 5:07:57 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by LBS Review on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/3/2023 5:07:55 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Gary Rust on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/3/2023 5:07:53 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Caelen Went on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/3/2023 5:07:51 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by on behalf of Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/3/2023 5:07:49 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Pamela Davidson on behalf of Central CO Conservation District
11/3/2023 5:07:47 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
11/3/2023 5:07:45 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Keith Curtis on behalf of RBD Floodplain
11/3/2023 5:07:43 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by on behalf of Pikes Peak Regional Building Department
11/3/2023 5:07:40 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by george san miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/3/2023 5:07:38 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/3/2023 5:07:36 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Joseph Martinez on behalf of US Army Corps of Engineers-Pueblo
11/3/2023 5:07:34 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Melissa Van Der Poel on behalf of Colorado Division of Water Resources
11/3/2023 5:07:32 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Joanna Williams on behalf of Colorado Division of Water Resources
11/3/2023 5:07:30 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Teresa Guagliardo on behalf of Colorado Department of Transportation - Pueblo Office
11/3/2023 5:07:28 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Michelle Regalado on behalf of Colorado Department of Transportation - Pueblo Office
11/3/2023 5:07:26 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Arthur Gonzales on behalf of Colorado Department of Transportation - Pueblo Office
11/3/2023 5:07:24 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Adam Lancaster on behalf of Colorado Department of Transportation - Pueblo Office
11/3/2023 5:07:22 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by on behalf of Parks Advisory Board
11/3/2023 5:07:19 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Mikayla Hartford on behalf of EPC Stormwater Review
11/3/2023 5:07:17 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Glenn Reese on behalf of EPC Stormwater Review
11/3/2023 5:07:15 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Christina Prete on behalf of EPC Stormwater Review
11/3/2023 5:07:13 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Jeff Kramer on behalf of EPC Sheriff's Department
11/3/2023 5:07:11 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Jane Fromme on behalf of EPC Sheriff's Department
11/3/2023 5:07:09 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Christopher Gonzalez on behalf of EPC Sheriff's Department
11/3/2023 5:07:06 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Andrew Prehm on behalf of EPC Sheriff's Department
11/3/2023 5:07:04 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by on behalf of EPC Parks Department
11/3/2023 5:07:02 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Mike McCarthy on behalf of EPC Health Department
11/3/2023 5:07:00 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Catherine McGarvy on behalf of EPC Health Department
11/3/2023 5:06:58 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by HEAEH LandUse on behalf of EPC Health Department
11/3/2023 5:06:56 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Lori Seago on behalf of County Attorney - Water
11/3/2023 5:06:54 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by April Willie on behalf of County Attorney - Water
11/3/2023 5:06:51 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Lori Seago on behalf of County Attorney - Development Review
11/3/2023 5:06:49 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by April Willie on behalf of County Attorney - Development Review
11/3/2023 5:06:45 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Lupe Packman on behalf of PCD Engineering Division
11/3/2023 5:06:43 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Gilbert LaForce on behalf of PCD Engineering Division
11/3/2023 5:06:41 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
11/3/2023 5:06:39 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Edward Schoenheit on behalf of PCD Engineering Division
11/3/2023 5:06:37 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Engineering Manager on behalf of PCD Engineering Division
11/3/2023 5:06:35 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Charlene Durham on behalf of PCD Engineering Division
11/3/2023 5:06:33 PM Request for Review Comments email sent for Project Esteban Rodriguez Sketch Plan for review by Carlos Hernandez Martinez on behalf of PCD Engineering Division
10/17/2023 5:25:29 PM Payment Request sent: 10/17/2023
10/17/2023 5:25:22 PM File # Assigned: SKP237
10/17/2023 5:25:02 PM Submission Triaged
10/17/2023 5:07:12 PM Submission received from Applicant
10/17/2023 3:38:03 PM Project Manager Assigned: Ryan Howser
10/17/2023 3:36:53 PM Submission request sent to Applicant
10/17/2023 3:36:43 PM Submission Triaged
10/17/2023 12:28:55 PM Submission received from Applicant
10/17/2023 11:56:50 AM Submission request sent to Applicant
10/17/2023 11:53:41 AM Project reopened for Review Comments
6/15/2023 12:00:00 AM Project Closed
6/15/2023 12:00:00 AM Project Expired one year after 06/15/2022 Submission Request 06/15/2023
6/15/2022 2:28:31 PM Submission request sent to Applicant
6/15/2022 10:20:14 AM Project Manager Assigned: Kari Parsons
6/15/2022 10:20:14 AM EA Assigned: EA2297
6/15/2022 10:20:14 AM Project Created