PCD Engineering Division
10/17/2022 8:05:55 AM |
Review 3 comments will be uploaded by the project manager. Review comments on the following documents: - Site Map Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
10/17/2022 8:05:55 AM | |
PCD Engineering Division
8/16/2022 9:33:07 AM |
Review 2 comments will be uploaded by the project manager. Review comments on the following documents: - Site Drawing Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
8/16/2022 9:33:07 AM | |
PCD Project Manager
8/16/2022 8:43:57 AM |
scheduled for hearing on 8/24/2022 | 8/16/2022 8:43:57 AM | |
Pikes Peak Regional Building Department
6/13/2022 8:06:58 AM |
Enumerations has no comment regarding the request for a variance to allow a change in yard setbacks for the proposed garage. Thank you, Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
6/13/2022 8:06:58 AM | |
View |
Colorado Springs Airport Advisory Commission
6/10/2022 11:58:11 AM |
The attached summary with comments will be presented at the June 22nd, 2022 Airport Advisory Commission meeting. | 6/10/2022 11:58:11 AM |
View |
El Paso County Conservation Dist
6/2/2022 7:42:29 PM |
EPCCD grass seed native shotgun mix added as .jpg. | 6/2/2022 7:42:29 PM |
View |
El Paso County Conservation Dist
6/2/2022 7:35:07 PM |
EPCCD brief comments added as a .docx. | 6/2/2022 7:35:07 PM |
View |
PCD Project Manager
6/2/2022 3:52:31 PM |
see comments on the drawing and the letter of intent from Engineering and Planning. | 6/2/2022 3:52:31 PM |
View |
PCD Project Manager
6/2/2022 3:50:19 PM |
6/2/2022 3:50:19 PM | |
PCD Engineering Division
5/31/2022 3:25:07 PM |
Review 1 comments will be uploaded by the project manager. Review comments on the following documents: - Letter of Intent - Site Map - Draft Sketch FYI: - Per El Paso County Engineering Criteria Manual Chapter 2.4.1.B "accesses shall be separated by a distance equal to the entering sight distance values in Table 2-35." The parcel does not meet the referenced criteria for multiple access points. No new driveway access will be allowed for the proposed structure. - There is no Driveway Access Permit on file for existing driveway. A Driveway Access Permit is required for all access points within unincorporated El Paso County and is required for building permit applications. Please apply for a driveway access permit through EDARP, https://epcdevplanreview.com/ . Under "Getting Started" click on "Initiate a minor application", select Access Permit, and enter a valid email address. A verification code will be sent to the email provided. The verification code will be needed to access the application online. Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
5/31/2022 3:25:07 PM | |
PCD Project Manager
5/25/2022 2:12:46 PM |
Additional comments to follow once engineering reviews the project: please make sure you include all the items in the checklists. BOA228-Review #1 - 5/25/22 Planning Please address the following items on your site plan: - Brief description of request - The setback request on this sheet should match the letter of intent. - Include setback requirements and what is being proposed. Include the side setback. - Include the proposed driveway location - Include the distance from the house to the proposed garage - draw the 24'x24' garage to scale - it is a rectangle - graphic scale - include the location and width of all sidewalks - height of the proposed garage - Do you have documentation that the easement was vacated? - if applicable, indicate the location of existing and proposed water and wastewater infrastructure, including well(s) and septic system(s) - if applicable, location of all no-build areas, floodplain(s), and drainage facilities - Note the existing/proposed land use, parcel size, and zoning |
5/25/2022 2:12:46 PM | |
View |
Widefield SD 3
5/24/2022 3:30:45 PM |
5/24/2022 3:30:45 PM | |
Fountain
5/23/2022 11:12:35 AM |
City of Fountain Electric - Upon reviewing the materials submitted the City of Fountain Electric Department noted that there are no objections to this request. | 5/23/2022 11:12:35 AM |