Project Review Comments
- Project Name
- Grandview Reserve Geick Basin Channel
- Description
- Unnamed Reaches A and B
- Location
- Parcels
- 4200000396 4200000396
- Applicant
-
HR Green
Lead Engineer Matt Jones ( matt.jones@hrgreen.com )
(720) 602-4999 Lead Engineer Matt Jones ( matt.jones@hrgreen.com )
(720) 602-4999 - EA Number
- EA20175
- File Number
- CDR228
- Project Manager
- Kari Parsons
- Status
- Active
- Created
- 3/22/2022 5:04:23 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
PCD Engineering Division
9/3/2024 12:57:32 PM |
(FAE redline notes) | 9/3/2024 12:57:32 PM |
View |
PCD Engineering Division
9/3/2024 12:55:58 PM |
(CLOMR Report redlines) | 9/3/2024 12:55:58 PM |
View |
PCD Engineering Division
9/3/2024 12:55:11 PM |
(CD redlines summary) | 9/3/2024 12:55:11 PM |
View |
PCD Engineering Division
9/3/2024 12:52:23 PM |
(CD redlines) | 9/3/2024 12:52:23 PM |
View |
PCD Engineering Division
9/3/2024 12:49:47 PM |
(FDR redlines summary) | 9/3/2024 12:49:47 PM |
View |
PCD Engineering Division
9/3/2024 12:49:21 PM |
(FDR redlines) | 9/3/2024 12:49:21 PM |
View |
PCD Engineering Division
9/3/2024 12:47:19 PM |
(O&M template - to be attached to maintenance agreement) | 9/3/2024 12:47:19 PM |
View |
PCD Engineering Division
9/3/2024 12:46:42 PM |
(redlined previously approved deviation request) | 9/3/2024 12:46:42 PM |
View |
PCD Engineering Division
9/3/2024 12:45:33 PM |
Review #6: See comment memo (link at left) and redlined previously approved deviation request. Redline comments on the following documents will be uploaded separately: - Channel Design Report (Due to the comments provided and missing information, additional comments may be generated on the next submittal.) Items in the channel modeling are still not matching with what had been previously agreed upon with county staff. - CLOMR report (pages) (No report provided for Review 4 & Review 1 comments remain unresolved). CLOMR needs to be provided for a re-review. - Construction Drawings - Financial Assurance Estimate (notes) - Comment Summaries Reviewed by: Jeff Rice, PE jeffrice@elpasoco.com |
9/3/2024 12:45:33 PM |
EPC Stormwater Review
8/29/2024 3:25:45 PM |
Review 6: Please include the 4-Step Process in the Drainage Report. This comment has been outstanding since Review #4. Feel free to give me a call if you have any questions. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
8/29/2024 3:25:45 PM | |
View |
PCD Engineering Division
8/1/2024 4:07:27 PM |
FAE Redlines | 8/1/2024 4:07:27 PM |
View |
PCD Engineering Division
8/1/2024 4:07:03 PM |
CDs Redlines | 8/1/2024 4:07:03 PM |
View |
PCD Engineering Division
8/1/2024 4:06:33 PM |
CLOMR Redlines | 8/1/2024 4:06:33 PM |
View |
PCD Engineering Division
8/1/2024 4:06:13 PM |
FDR Redlines | 8/1/2024 4:06:13 PM |
PCD Engineering Division
8/1/2024 4:05:14 PM |
Review #5: Redline comments on the following documents will be uploaded separately: - Drainage Report (Due to the comments provided and missing information, additional comments may be generated on the next submittal) Report was missing entirety of text. Please ensure review 4 comments have been addressed on the next submittal. Items in the channel modeling are not matching with what had been previously agreed upon with county staff. In order for channel to be accepted by county for maintenance, channel must meet design requirements. - CLOMR (No report provided for Review 4 & Review 1 comments remain unresolved). CLOMR needs to be provided for a re-review. - Construction Drawings - Financial Assurance Estimate Reviewed by: Jeff Rice, PE jeffrice@elpasoco.com Charlene Durham, PE charlenedurham@elpasoco.com |
8/1/2024 4:05:14 PM | |
EPC Stormwater Review
8/1/2024 3:58:06 PM |
Review 5: An incomplete drainage was submitted without any report text, only appendices. So a review could not be completed. Please address my comments from Review 4 and upload a complete drainage report for review. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III glennreese@elpasoco.com |
8/1/2024 3:58:06 PM | |
View |
PCD Engineering Division
6/11/2024 8:48:51 AM |
Deviation Request Redlines | 6/11/2024 8:48:51 AM |
View |
PCD Engineering Division
6/11/2024 8:48:12 AM |
FAE Redlines | 6/11/2024 8:48:12 AM |
View |
PCD Engineering Division
6/11/2024 8:47:31 AM |
Construction Drawing Redlines | 6/11/2024 8:47:31 AM |
View |
PCD Engineering Division
6/11/2024 8:46:48 AM |
CLOMR Redlines | 6/11/2024 8:46:48 AM |
View |
PCD Engineering Division
6/11/2024 8:46:23 AM |
Drainage Report Redlines | 6/11/2024 8:46:23 AM |
PCD Engineering Division
6/11/2024 8:47:48 AM |
Review #4: Redline comments on the following documents will be uploaded separately: - Drainage Report (Due to the comments provided, additional comments may be generated on the next submittal) - CLOMR (No report provided for Review 4 & Review 1 comments remain unresolved). - Construction Drawings - Financial Assurance Estimate - Deviation Request Redlines Reviewed by: Bret Dilts, PE bretdilts@elpasoco.com Charlene Durham, PE charlenedurham@elpasoco.com |
6/11/2024 8:47:48 AM | |
EPC Stormwater Review
6/10/2024 11:58:18 AM |
Review 4: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...(to be uploaded with Development Services comments) EPC DPW Stormwater comments have been resolved on the following documents: - CDs - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Please submit the following signed documents for approval once all outstanding comments from Development Services, Planning, and any other agencies have been resolved: - CDs - Drainage Report Reviewed by: Glenn Reese, P.E. Stormwater Engineer III glennreese@elpasoco.com |
6/10/2024 11:58:18 AM | |
RBD Floodplain
5/6/2024 8:49:18 AM |
CLOMR needs to be approved prior to channel work | 5/6/2024 8:49:18 AM | |
View |
EPC Stormwater Review
3/19/2024 9:56:17 AM |
SWMP | 3/19/2024 9:56:17 AM |
View |
EPC Stormwater Review
3/19/2024 9:55:11 AM |
SWMP Checklist | 3/19/2024 9:55:11 AM |
View |
EPC Stormwater Review
3/19/2024 9:54:45 AM |
PBMP Applicability Form | 3/19/2024 9:54:45 AM |
View |
EPC Stormwater Review
3/19/2024 9:53:57 AM |
GEC Checklist | 3/19/2024 9:53:57 AM |
View |
EPC Stormwater Review
3/19/2024 9:53:36 AM |
FAE | 3/19/2024 9:53:36 AM |
View |
EPC Stormwater Review
3/19/2024 9:51:14 AM |
Drainage Report | 3/19/2024 9:51:14 AM |
View |
EPC Stormwater Review
3/19/2024 9:50:58 AM |
CDs | 3/19/2024 9:50:58 AM |
PCD Engineering Division
3/19/2024 9:38:34 AM |
Review #3: Redline comments on the following documents will be uploaded separately: - Drainage Report (No report provided for Review 2 & Review 1 comments remain unresolved). - CLOMR (No report provided for Review 2 & Review 1 comments remain unresolved). - Construction Drawings (NOTE: Drainage Report was not include. Staff is unable to verify the hydraulic design. Additional comments are likely to be generated on the next submittal). (To be uploaded by Stormwater Engineer) - Financial Assurance Estimate (To be uploaded by Stormwater Engineer) Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com |
3/19/2024 9:38:34 AM | |
PCD Project Manager
3/13/2024 3:04:15 PM |
Please work with the engineer to address comments. | 3/13/2024 3:04:15 PM | |
View |
EPC Parks Department
3/1/2024 10:06:53 AM |
El Paso County Parks and Community Services Department Final Comments, Review #3 - Please See Attached Document (Administrative Comments: No Park Advisory Board Endorsement Necessary for Construction Drawing Reviews) | 3/1/2024 10:06:53 AM |
EPC Stormwater Review
3/19/2024 9:52:53 AM |
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs - Drainage Report - FAE......(see Charlene's blue comments) - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Note: the majority of my Review 2 comments were not resolved. If any comments are unclear, please give me a call or set up a meeting. I'd me happy to discuss. EPC DPW Stormwater comments have been resolved on the following documents: - ESQCP Reviewed by: Glenn Reese, P.E. Stormwater Engineer III glennreese@elpasoco.com |
3/19/2024 9:52:53 AM | |
View |
Upper Black Squirrel Creek GWMD
6/5/2023 11:20:59 AM |
6/5/2023 11:20:59 AM | |
Colorado Department of Transportation - Pueblo Office
5/12/2023 2:23:10 PM |
CDOT Staff does not have any comment. CDOT Hydraulics Engineer request to review the CLOR once it is established. |
5/12/2023 2:23:10 PM | |
View |
El Paso County Conservation Dist
5/5/2023 10:59:23 AM |
Late comments attached as a .pdf with apologies. | 5/5/2023 10:59:23 AM |
View |
PCD Engineering Division
5/3/2023 1:48:47 PM |
Review #2: Construction Drawings | 5/3/2023 1:48:47 PM |
View |
PCD Engineering Division
5/3/2023 1:48:00 PM |
Review #2: Financial Assurance Estimate | 5/3/2023 1:48:00 PM |
View |
PCD Engineering Division
5/3/2023 1:37:07 PM |
Review #2: CLOMR | 5/3/2023 1:37:07 PM |
View |
PCD Engineering Division
5/3/2023 1:36:19 PM |
Review #2: Final Drainage Report | 5/3/2023 1:36:19 PM |
View |
PCD Engineering Division
5/3/2023 1:34:33 PM |
Review #2: Letter of Intent | 5/3/2023 1:34:33 PM |
View |
EPC Stormwater Review
4/27/2023 2:04:07 PM |
PBMP Applicability Form | 4/27/2023 2:04:07 PM |
View |
EPC Stormwater Review
4/27/2023 2:03:40 PM |
GEC Checklist | 4/27/2023 2:03:40 PM |
View |
EPC Stormwater Review
4/27/2023 2:03:16 PM |
ESQCP | 4/27/2023 2:03:16 PM |
EPC Stormwater Review
4/27/2023 2:02:58 PM |
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs........................(to be uploaded by PM with Development Services comments) - Drainage Report....(to be uploaded by PM with Development Services comments) - ESQCP - GEC Checklist - PBMP Applicability Form Unresolved comment from Review 1: Please provide the following documents upon resubmittal: - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III glennreese@elpasoco.com |
4/27/2023 2:02:58 PM | |
View |
Colorado Parks and Wildlife
4/20/2023 4:42:59 PM |
4/20/2023 4:42:59 PM | |
PCD Engineering Division
5/3/2023 12:23:19 PM |
Review #2: Redline comments on the following documents will be uploaded separately: - Drainage Report (Review 1 comments remain unresolved). - Construction Drawings (NOTE: Drainage Report was not include. Staff is unable to verify the hydraulic design. Additional comments is likely to be generated on the next submittal). - CLOMR (Review 1 comments remain unresolved. - Financial Assurance Estimate - LOI Submit the following document: - SWMP - SWMP Checklist Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
5/3/2023 12:23:19 PM | |
Colorado Department of Transportation - Pueblo Office
4/20/2023 2:59:44 PM |
CDOT comments will be forthcoming. - Arthur Gonzales, CDOT Access Manager | 4/20/2023 2:59:44 PM | |
View |
EPC Parks Department
4/4/2023 11:10:13 AM |
El Paso County Parks and Community Services Final Comments, Review #2 - Please See Attached Documents | 4/4/2023 11:10:13 AM |
RBD Floodplain
4/3/2023 10:34:02 AM |
"HR Green has submitted the Main Stem and Main Stem Tributary through the Grandview Reserve site to FEMA as a CLOMR application. We are currently awaiting comments from FEMA, and a LOMR will be submitted upon the completion of all improvement construction." Approved CLOMR required prior to floodplain grading permit |
4/3/2023 10:34:02 AM | |
View |
EPC Environmental Services
3/31/2023 1:54:36 PM |
3/31/2023 1:54:36 PM | |
View |
Colorado Parks and Wildlife
6/29/2022 11:44:09 AM |
6/29/2022 11:44:09 AM | |
View |
PCD Engineering Division
6/16/2022 9:56:23 AM |
Review #1: Drainage Report | 6/16/2022 9:56:23 AM |
View |
PCD Engineering Division
6/16/2022 8:32:35 AM |
Review #1 Redline: LOI | 6/16/2022 8:32:35 AM |
View |
PCD Engineering Division
6/16/2022 8:32:12 AM |
Review #1 Redline: FAE | 6/16/2022 8:32:12 AM |
View |
PCD Engineering Division
6/16/2022 8:31:53 AM |
Review #1 Redline: ESQCP | 6/16/2022 8:31:53 AM |
View |
PCD Engineering Division
6/16/2022 8:31:27 AM |
Review #1 Redline: CLOMR | 6/16/2022 8:31:27 AM |
View |
PCD Engineering Division
6/16/2022 8:30:59 AM |
Review #1 Redline: Construction Drawings | 6/16/2022 8:30:59 AM |
View |
EPC Stormwater Review
6/15/2022 5:34:45 PM |
PBMP Applicability Form | 6/15/2022 5:34:45 PM |
View |
EPC Stormwater Review
6/15/2022 5:34:27 PM |
GEC Checklist | 6/15/2022 5:34:27 PM |
EPC Stormwater Review
6/15/2022 5:34:03 PM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs........................(to be uploaded by PM with PCD comments) - Drainage Report....(to be uploaded by PM with PCD comments) - ESQCP...................(to be uploaded by PM with PCD comments) - GEC Checklist - PBMP Applicability Form Please provide the following documents upon resubmittal: - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
6/15/2022 5:34:03 PM | |
PCD Engineering Division
6/16/2022 9:59:53 AM |
Review #1: Due to the nature and extent of review comments provided the resubmittal will be treated as a first review. Expect new comments on the resubmittal review. Redline comments on the following documents will be uploaded separately: - Drainage Report (NOTE: Cursory comments provided since the report provided was a preliminary drainage report for Grandview Reserve Filing No. 1, not a Final Drainage Report for the channel realignment). - Construction Drawings (NOTE: Cursory comments provided. Drainage Report did not include the complete hydraulic analysis/result to verify the proposed design). - CLOMR - Financial Assurance Estimate - LOI Submit the following document: - SWMP - SWMP Checklist Reviewed by: Gilbert LaForce, PE gilbertlaforce@elpasoco.com |
6/16/2022 9:59:53 AM | |
PCD Project Manager
6/14/2022 8:01:22 AM |
Engineering and Stormwater will upload comments... | 6/14/2022 8:01:22 AM | |
View |
EPC Parks Department
6/7/2022 3:43:04 PM |
El Paso County Community Services / Parks Final Comments - Please See Attached Document (Administrative Comments Only - No PAB Endorsement Necessary) | 6/7/2022 3:43:04 PM |
View |
El Paso County Conservation Dist
6/2/2022 7:42:49 PM |
EPCCD grass seed native shotgun mix added as .jpg. | 6/2/2022 7:42:49 PM |
View |
El Paso County Conservation Dist
6/2/2022 7:35:27 PM |
EPCCD brief comments added as a .docx. | 6/2/2022 7:35:27 PM |
View |
EPC Environmental Services
5/24/2022 10:55:48 AM |
5/24/2022 10:55:48 AM | |
RBD Floodplain
5/23/2022 9:58:18 AM |
Floodplain permit required prior to grading activity. CLOMR will need to be approved prior to issuance of the local Floodplain permit . |
5/23/2022 9:58:18 AM |