Project Review Comments

Back to List


Project Name
Latigo Trails Filing No Nine-9 (2021)
Description
Final plat for 39 lots. Latigo Trails Preliminary Plan (SP-01-011) was previously approved with significant constraints depicted. CGS and USFWS review
Location
Parcels
4200000345 4200000345 4200000348 4200000348 4200000352 4200000352
Applicant
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
EA Number
EA20184
File Number
SF2136
Project Manager
Kylie Bagley
Status
Closed
Created
8/3/2021 3:45:38 PM

View: Project Documents



Review Comments (119)

Link Agency Comment
County Attorney - Development Review
5/18/2023 2:51:16 PM
No further comments at this time. 5/18/2023 2:51:16 PM
PCD Project Manager
5/5/2023 8:40:12 AM
no comments 5/5/2023 8:40:12 AM
View County Attorney - Development Review
4/25/2023 7:31:13 PM
Proposed edits to escrow agreement attached. 4/25/2023 7:31:13 PM
View County Attorney - Development Review
4/6/2023 3:32:40 PM
1. Proposed edits to SIA attached.
2. Please provide the Escrow Agreement in Word for ease of editing.
3. With respect to the SIA, Escrow Agreement, Offsite Detention Agreement, and Onsite Detention Agreement, the property owner must be identified as the Developer or Subdivider. County Assessor's records and the current plat drawings identify this party as Falcon Latigo, LLC, not BJRM LLC. If BJRM LLC is the property owner, please provide evidence to this effect so that we can confirm that the appropriate party is signing these documents.
4/6/2023 3:32:40 PM
View County Attorney - Development Review
1/10/2023 1:34:59 PM
Proposed edits to Offsite Detention Maintenance Agreement attached. 1/10/2023 1:34:59 PM
View County Attorney - Development Review
1/10/2023 1:34:31 PM
1. Proposed edits to Onsite Detention Maintenance Agreement attached.
2. Please provide the legal description in Word of the entire subdivision directly to the County Attorney's Office for processing of the petition for inclusion into PID No. 2.
1/10/2023 1:34:31 PM
View County Attorney - Water
1/5/2023 1:53:00 PM
See attached Water Supply Review and Recommendations. Thanks! 1/5/2023 1:53:00 PM
View PCD Project Manager
12/20/2022 7:39:34 AM
Letter of Intent- The Escrow comment may not be relative pending Attorney decision. Please address all other comments at this time and resubmit so i can be scheduled for hearing. 12/20/2022 7:39:34 AM
View PCD Project Manager
12/20/2022 7:38:09 AM
Plat comments (these may change pending Attorney conversation regarding escrow) 12/20/2022 7:38:09 AM
PCD Engineering Division
12/12/2022 12:41:24 PM
Review #4:
1. Applicant's responsibility for off-site improvements identified in the Traffic Impact Study Table 3 is unresolved. Staff is waiting for additional guidance from the County Attorney's Office.

Comments resolved on the following document:
Drainage Report

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
12/12/2022 12:41:24 PM
EPC Stormwater Review
12/8/2022 12:56:15 PM
Review 4: As previously requested, please sign/date and resubmit ESQCP. Thanks.

EPC Stormwater comments have been resolved on the following documents:
- Drainage Report


Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
12/8/2022 12:56:15 PM
PCD Project Manager
10/18/2022 3:55:28 PM
Planning Division has no comments at this time 10/18/2022 3:55:28 PM
View PCD Engineering Division
10/18/2022 1:16:37 PM
Review #3: Drainage Report 10/18/2022 1:16:37 PM
PCD Engineering Division
10/18/2022 1:39:25 PM
Review #3:
1. Address comment on the drainage report and upload engineering documents for final approval.
2. Applicant's responsibility for off-site improvements identified in the Traffic Impact Study Table 3 is unresolved. Applicant and PCD are currently in communication regarding this issue. Staff is waiting for additional guidance from the County Attorney's Office.


Comments resolved on the following document:
* Final Plat
* Soils & Geology Report
* Street Construction Plans
* Storm/Pond Plans

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
10/18/2022 1:39:25 PM
View Colorado Division of Water Resources
9/29/2022 6:30:08 PM
See attached letter. 9/29/2022 6:30:08 PM
View County Attorney - Development Review
9/29/2022 11:20:45 AM
1. Please add name of bank issuing letter of credit to paragraph 1 of SIA.
2. Attached is a template we use when offsite detention facilities are being proposed. Please use this in lieu of the Detention Maintenance Agreement submitted. You may delete reference in this template to wetlands and wetlands areas.
9/29/2022 11:20:45 AM
County Attorney - Water
9/28/2022 11:24:52 AM
County Attorney's Office comments of 9/23/22 are unresolved. We will provide our review once an updated opinion from the Colorado Division of Water Resources is provided. If non-water matters require review - please send to County Attorney-Development Review. 9/28/2022 11:24:52 AM
View EPC Stormwater Review
9/23/2022 3:53:13 PM
Drainage Report (pdf pg 5 only) 9/23/2022 3:53:13 PM
County Attorney - Water
9/23/2022 3:44:47 PM
Pursuant to their letter dated July 7, 2022, the Colorado Division of Water Resources indicates they have not received adequate information from the Applicant. County Attorney's Office will review for water sufficiency following receipt of findings from Colorado Division of Water Resources. 9/23/2022 3:44:47 PM
EPC Stormwater Review
9/23/2022 3:56:37 PM
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report (only 1 comment on pdf page 5, does not require a re-review)

EPC Stormwater comments have been resolved on the following documents:
- CDs
- ESQCP
- GEC Plan
- Detention Maintenance Agreement

Please upload signed/dated version of ESQCP.

EPC Stormwater has no further comments at this time. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
9/23/2022 3:56:37 PM
View EPC Health Department
8/19/2022 6:09:58 PM
8/19/2022 6:09:58 PM
View PCD Engineering Division
8/2/2022 3:02:28 PM
Review 2 GEC 8/2/2022 3:02:28 PM
View PCD Engineering Division
8/2/2022 3:01:51 PM
Review 2 ESQCP 8/2/2022 3:01:51 PM
View PCD Engineering Division
8/2/2022 3:01:16 PM
Review 2 Traffic Impact Study 8/2/2022 3:01:16 PM
View PCD Engineering Division
8/2/2022 3:00:47 PM
Review 2 Construction Drawings 8/2/2022 3:00:47 PM
View PCD Engineering Division
8/2/2022 3:00:12 PM
Review 2 Soils Report 8/2/2022 3:00:12 PM
View PCD Engineering Division
8/2/2022 2:59:47 PM
Review 2 Drainage Report 8/2/2022 2:59:47 PM
View PCD Engineering Division
8/2/2022 2:59:00 PM
Review 2: Final Plat 8/2/2022 2:59:00 PM
Black Forest Fire Protection District
8/2/2022 2:07:07 PM
Black Forest Fire Rescue/JMR
This project is not within the BFFR Protection District
8/2/2022 2:07:07 PM
View Parks Advisory Board
7/29/2022 1:55:14 PM
El Paso County Community Services / Parks Final Comments, Review #2 - Please See Attached Documents (PAB Endorsed 12/08/2021) 7/29/2022 1:55:14 PM
View EPC Parks Department
7/29/2022 1:50:51 PM
El Paso County Community Services / Parks Final Comments, Review #2 - Please See Attached Documents (PAB Endorsed 12/08/2021) 7/29/2022 1:50:51 PM
PCD Engineering Division
8/2/2022 1:23:23 PM
Review #2: Redline comments on the following documents will be uploaded by the Project Manager:
* Final Plat
* Soils & Geology Report
* Final Drainage Report
* Construction Drawings
* Traffic Impact Study


Comments resolved on the following document:
- Grading and Erosion Control
- Financial Assurance Estimate

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
8/2/2022 1:23:23 PM
View PCD Project Manager
8/16/2022 9:56:23 AM
Final Plat Redlines 8/16/2022 9:56:23 AM
County Attorney - Development Review
7/26/2022 11:13:36 AM
1. Please incorporate changes to Detention Maintenance Agreement from my May 9 review that have not yet been made.
2. Please fill out collateral info in SIA for next review.
7/26/2022 11:13:36 AM
View EPC Stormwater Review
7/22/2022 4:14:08 PM
Detention Maintenance Agreement_v2 7/22/2022 4:14:08 PM
View Colorado Geological Survey
7/22/2022 10:52:50 AM
7/22/2022 10:52:50 AM
Colorado Springs Airport Advisory Commission
7/20/2022 8:44:36 AM
This land use item is outside of the Commercial Airport Overlay District and will not be reviewed by Airport Staff or presented at the Airport Advisory Commission meeting. 7/20/2022 8:44:36 AM
Mountain View Electric Association, Inc.
7/19/2022 1:41:51 PM
Mountain View Electric Association approves the easements shown on the Plat - note 13.
The Association has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant.
7/19/2022 1:41:51 PM
View Meridian Ranch/Meridian Service Metro Dist.
7/19/2022 10:25:52 AM
MSMD review comments of utility plans. 7/19/2022 10:25:52 AM
View El Paso County Conservation Dist
7/19/2022 8:42:58 AM
Brief comments included within .docx 7/19/2022 8:42:58 AM
View El Paso County Conservation Dist
7/19/2022 8:42:45 AM
Native grass seed mix information submitted as .jpg 7/19/2022 8:42:45 AM
Pikes Peak Regional Building Department
7/18/2022 12:55:55 PM
1. The application name is different than the plat. Is the application correct or it the plat correct? Please clarify.
2. What was submitted in November of 2021 was the area that included Fontenelle Trail, Manchego Trail, Oregon Wagon Trail & Irish Hunter Trail to the north east. This is a different area of this subdivision then before.
3. Provide a 100 scale copy or larger of the entire APPROVED development plan (d.p.) to this department so that addressing can be assigned. Once received, the development plan will be placed on a list to be addressed. Development plans that are not yet approved may be addressed, however additional plan review fees will accrue if changes are made to the D.P. after initial addressing.
4. Standard Final Plat Comments;
a. Enumerations will review the mylar prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. An additional over the phone transaction fee of $3.50 will apply for any credit card payment.
c. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org; Mylar reviews can be reviewed via “pdf”. The mylar will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment. If you would like an in-person review, please make an appointment on our website.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org W: 719-327-2953
7/18/2022 12:55:55 PM
EPC Stormwater Review
7/22/2022 4:09:52 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CD.........................(to be uploaded by PM with PCD comments)
- Drainage Report....(to be uploaded by PM with PCD comments)
- ESQCP..................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- Detention Maintenance Agreement

EPC Stormwater comments have been resolved on the following documents:
- FAE
- GEC Checklist
- MS4 Post Construction Form
- PBMP Applicability Form
- SDI Form
- SWMP
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
7/22/2022 4:09:52 PM
Colorado Parks and Wildlife
7/12/2022 4:11:22 PM
Colorado Parks and Wildlife (CPW) has reviewed the plans for the Latigo Trails Filing No Nine-9. CPW has previously commented on the entirety of the Latigo Trails project back on November 8th, 2021 and is viewable in the list of comments for this project. CPW would like to refer to these comments in regards to this filing.

CPW appreciates being given the opportunity to comment. Please Feel free to contact District Wildlife Manager Aaron Berscheid at 719-439-9601 or aaron.berscheid@state.co.us should you have any questions or require additional information.
7/12/2022 4:11:22 PM
911 Authority - El Paso/Teller County
7/11/2022 10:33:30 AM
Horse Canyon Trl - Previously approved.
Conestoga Trl South - Logical continuation of existing street.

No action for E911 on this submittal.

Thank you.
Justin
7/11/2022 10:33:30 AM
Academy SD 20 Building Fund
7/11/2022 9:52:01 AM
Located in District 49 not District 20.

Thanks,
Don Smith
Planning Consultant District 20
7/11/2022 9:52:01 AM
US Postal Service
7/9/2022 1:17:05 PM
Please contact Angela Connell, angela.d.connell@usps.gov – (Peyton/Falcon) directly to review this development for mail service. To establish mail delivery and kiosk locations an appointment will be required with USPS to determine final locations. Information required for this establishment include proposed locations, type of mail receptacle, final plat with addresses, type of development (residential/commercial) and date of first occupancy.

• Make an appointment to go over pad locations and mailboxes
• Building and Site plan showing proposed locations of mailboxes
• Type of mail receptacle proposed for development
• Elevation sheets for approval – 4C receptacles
• Mailroom dimensions
• Mailboxes must be approved prior to purchase
• Final Plat with addresses
• Type of Development (business/residential/mixed)
• Date of first occupancy
• If the community is Apartments - a letter from the owner regarding oversized parcels

Effective October 5, 2006, all new designs approved for NEW CONSTRUCTION AND MAJOR RENOVATION require U.S. Postal Service approved CBU’s to be installed.

Effective July 2020 all new apartment projects or apartment remodels must provide 1 parcel locker for every 5 mailbox compartments.
7/9/2022 1:17:05 PM
View EPC Environmental Services
7/7/2022 10:54:02 AM
7/7/2022 10:54:02 AM
View Colorado Division of Water Resources
7/7/2022 10:01:11 AM
See attached letter. 7/7/2022 10:01:11 AM
Black Forest Land Use Committee
7/6/2022 6:37:07 PM
The Black Forest Land Use Committee has reviewed this proposal and has no inputs.
We recommend approval.
7/6/2022 6:37:07 PM
County Attorney - Water
7/6/2022 8:22:26 AM
The Colorado Division of Water Resources indicates they have not received adequate information from the Applicant. County Attorney's Office will review for water sufficiency following receipt of findings from Colorado Division of Water Resources. 7/6/2022 8:22:26 AM
RBD Floodplain
7/6/2022 6:15:24 AM
This project has A zone floodplain within the 300 ft buffer to the south. Please address RBC 313.18.5

If subdivision proposals are located within three
hundred (300) feet of a Zone A floodplain, FEMA
approved base flood elevations and boundaries are
required to be determined and shown on the plat,
OR
provide a Floodplain Certification Letter by a
professional engineer or architect licensed by the
state of Colorado, stating that “Based on field
verified characteristics of the property, the
property is reasonably safe from flooding and to
the best of the engineer’s knowledge if the 100-
year floodplain were studied it would not enter the
property in question”.
7/6/2022 6:15:24 AM
View Meridian Ranch/Meridian Service Metro Dist.
5/10/2022 8:12:20 AM
5/10/2022 8:12:20 AM
View Meridian Ranch/Meridian Service Metro Dist.
5/10/2022 8:11:37 AM
It appears no comments have been addressed from the previous submittal. Returned the first submittal comments to be addressed, did not review the second submittal.

Please address all comments, if a comment is not addressed, otherwise provide engineering justification.
5/10/2022 8:11:37 AM
View County Attorney - Development Review
5/9/2022 11:39:07 AM
Proposed edits to Detention Maintenance Agreement attached. 5/9/2022 11:39:07 AM
View PCD Project Manager
5/9/2022 9:05:51 AM
Letter of intent (LOI) comment 2 5/9/2022 9:05:51 AM
View PCD Project Manager
5/9/2022 8:57:30 AM
CDs comment 2 5/9/2022 8:57:30 AM
View PCD Project Manager
5/9/2022 8:57:03 AM
Drainage Report Comment 2 5/9/2022 8:57:03 AM
View PCD Project Manager
5/9/2022 8:56:36 AM
Plat Comment NO 2. Please address comments; if questions please contact review staff .
Planning comments in green : Kari 719-520-6306
5/9/2022 8:56:36 AM
View PCD Project Manager
5/9/2022 8:55:25 AM
Financial Assurance Forms (FAE) comment 2 5/9/2022 8:55:25 AM
View PCD Project Manager
5/9/2022 8:54:50 AM
Fire Commitment letter; Please verify if Hydrants are required and include in CDS and FAE. This letter has the incorrect plat name. 5/9/2022 8:54:50 AM
View PCD Project Manager
5/9/2022 8:53:53 AM
Geotech report comment 2 5/9/2022 8:53:53 AM
View PCD Project Manager
5/9/2022 8:53:25 AM
Traffic Impact Study Comment 2 5/9/2022 8:53:25 AM
PCD Project Manager
5/9/2022 8:52:08 AM
Plats must be approved in numerical order. Plat No 10 can not go before Plat No. 9; Do you need to swap the names on all report items and docs so that this application becomes No. 9? Staff will swap names in EDARP as well. Please look at the plat checklist on our website and verify all items have been added. Also, Please apply these comments to the concurrent plat submittal currently known as No. 9 as the same comments will likely apply. 5/9/2022 8:52:08 AM
PCD Engineering Division
5/5/2022 10:19:22 AM
Review #2: Redline comments on the following documents will be uploaded by the Project Manager:
* Traffic Impact Study
* Soils & Geology Report
* Final Plat
* Final Drainage Report
* Construction Drawings
* Financial Assurance Estimate

Comments resolved on the following documents:
- Grading and Erosion Control

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
5/5/2022 10:19:22 AM
Meridian Ranch/Meridian Service Metro Dist.
4/26/2022 12:12:36 PM
No Comment 4/26/2022 12:12:36 PM
Mountain View Electric Association, Inc.
2/16/2022 11:12:06 AM
Mountain View Electric Association has no objection to the current plan. 2/16/2022 11:12:06 AM
View Meridian Ranch/Meridian Service Metro Dist.
1/27/2022 4:15:52 PM
1/27/2022 4:15:52 PM
View Meridian Ranch/Meridian Service Metro Dist.
1/27/2022 4:15:28 PM
1/27/2022 4:15:28 PM
Meridian Ranch/Meridian Service Metro Dist.
1/27/2022 4:14:15 PM
Review #1: Redline comments on the following documents are uploaded:
- Public Utility Plan
- Final Plat

Reviewed by:
Thomas Kerby, PE
Meridian Service Metropolitan District
1/27/2022 4:14:15 PM
View EPC Health Department
12/10/2021 2:31:04 PM
12/10/2021 2:31:04 PM
View Parks Advisory Board
12/8/2021 3:43:16 PM
El Paso County Community Services / Parks Final Comments - Please See Attached Documents (PAB Endorsed 12/08/2021) 12/8/2021 3:43:16 PM
View PCD Project Manager
12/7/2021 5:05:06 PM
Drainage Report - Final_V1 redlines 12/7/2021 5:05:06 PM
View PCD Project Manager
12/7/2021 2:54:44 PM
Water Supply Information Summary_V1 redlines 12/7/2021 2:54:44 PM
View PCD Project Manager
12/7/2021 2:54:26 PM
Water Resources Report_V1 redlines 12/7/2021 2:54:26 PM
View PCD Project Manager
12/7/2021 2:54:07 PM
Letter of Intent_V1 redlines 12/7/2021 2:54:07 PM
View PCD Project Manager
12/7/2021 2:53:43 PM
Fire Protection Report_V1 redlines 12/7/2021 2:53:43 PM
View PCD Project Manager
12/7/2021 2:53:25 PM
Fire Commitment Letter_V1 redlines 12/7/2021 2:53:25 PM
View PCD Project Manager
12/7/2021 2:53:06 PM
Financial Assurance Forms_V1 redlines 12/7/2021 2:53:06 PM
View PCD Project Manager
12/7/2021 2:52:36 PM
GEC Plan_V1 redlines 12/7/2021 2:52:36 PM
View PCD Project Manager
12/7/2021 2:48:47 PM
Traffic Impact Study_V1 redlines 12/7/2021 2:48:47 PM
View PCD Project Manager
12/7/2021 2:48:13 PM
Construction Drawings (Plans Profiles)_V1 redlines 12/7/2021 2:48:13 PM
View PCD Project Manager
12/7/2021 2:47:38 PM
Wastewater Treatment Report_V1 redlines 12/7/2021 2:47:38 PM
View PCD Project Manager
12/7/2021 2:47:14 PM
Soils & Geology Report_V1 redlines 12/7/2021 2:47:14 PM
View PCD Project Manager
12/7/2021 2:46:51 PM
Final Plat Drawings_V1 redlines 12/7/2021 2:46:51 PM
View County Attorney - Development Review
12/3/2021 10:14:18 AM
If the developer wishes to include the subdivision in Public Improvement District No. 2, please complete the attached petition in full and submit to the County Attorney's Office, along with a legal description of the subdivision in Word.

State law requires that legal notice of the BoCC hearing to include the property in the PID be published for three weeks. Developer is responsible for reimbursing the County Attorney's Office for the cost of publication.

The inclusion hearing must be held before the plat is recorded and requires 3 weeks of published notice. The County Attorney's Office makes every attempt to schedule the inclusion hearing on the date of BoCC or administrative approval of the plat, or as close thereto as possible. The developer and County Planning are responsible to keep the County Attorney's Office informed of the anticipated plat approval date.
12/3/2021 10:14:18 AM
View County Attorney - Development Review
12/3/2021 10:13:08 AM
Comments to Detention Maintenance Agreement attached. 12/3/2021 10:13:08 AM
View County Attorney - Development Review
12/3/2021 10:12:38 AM
Comments to SIA attached 12/3/2021 10:12:38 AM
PCD Project Manager
12/2/2021 10:52:33 AM
Planning will issue comments once our engineering team has finished their review. 12/2/2021 10:52:33 AM
PCD Engineering Division
12/2/2021 2:45:34 PM
Review #1: Redline comments on the following documents will be uploaded by the Project Manager:
- Traffic Impact Study
- Soils & Geology Report
- Final Plat
- Final Drainage Report
- Construction Drawings
- Grading and Erosion Control Pond
- Financial Assurance Estimate

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
12/2/2021 2:45:34 PM
View Upper Black Squirrel Creek GWMD
11/29/2021 6:36:34 PM
11/29/2021 6:36:34 PM
View Upper Black Squirrel Creek GWMD
11/29/2021 6:35:19 PM
11/29/2021 6:35:19 PM
View EPC Parks Department
11/22/2021 4:13:12 PM
El Paso County Community Services / Parks Preliminary Comments - Please See Attached Documents (To be presented to the PAB for endorsement on 12/08/2021) 11/22/2021 4:13:12 PM
View EPC Stormwater Review
11/22/2021 2:24:20 PM
SWMP Checklist 11/22/2021 2:24:20 PM
View EPC Stormwater Review
11/22/2021 2:23:58 PM
SWMP 11/22/2021 2:23:58 PM
View EPC Stormwater Review
11/22/2021 2:22:54 PM
SDI Form 11/22/2021 2:22:54 PM
View EPC Stormwater Review
11/22/2021 2:22:39 PM
PBMP Applicability Form 11/22/2021 2:22:39 PM
View EPC Stormwater Review
11/22/2021 2:22:25 PM
MS4 Post Construction Form 11/22/2021 2:22:25 PM
View EPC Stormwater Review
11/22/2021 2:22:09 PM
GEC Checklist 11/22/2021 2:22:09 PM
View EPC Stormwater Review
11/22/2021 2:21:52 PM
Detention Maintenance Agreement 11/22/2021 2:21:52 PM
EPC Stormwater Review
11/22/2021 2:21:11 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CD.........................(to be uploaded by PM with PCD comments)
- Drainage Report....(to be uploaded by PM with PCD comments)
- ESQCP...................(to be uploaded by PM with PCD comments)
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)

- Detention Maintenance Agreement
- GEC Checklist
- MS4 Post Construction Form
- PBMP Applicability Form
- SDI Form
- SWMP
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
11/22/2021 2:21:11 PM
Black Forest Fire Protection District
11/19/2021 9:28:00 AM
This is not within the Black Forest Fire District and therefore have no comments. 11/19/2021 9:28:00 AM
Colorado Springs Airport Advisory Commission
11/17/2021 4:20:56 PM
This item is outside the Commercial Airport Overlay District so no comments will be provided by the Colorado Springs Airport or Airport Advisory Commission.

Thank you.
11/17/2021 4:20:56 PM
Pikes Peak Regional Building Department
11/17/2021 4:03:51 PM
1. Our notes state that addresses were received in June of 2007. Enumeration will need to review these addresses to verify if they can still be used. Please include the development plan for where Irish Hunter & Manchego Trail to the east, to show the intent of the extensions of these roads for addressing purposes.
2. Street name Conestoga Trail South need to be labeled on page 3 of 5. Although RBD database shows the directional prior to the street name the plat should show the directional as a suffix.
3. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Addressing marker for lots should be front door.43. STANDARD FINAL PLAT COMMENTS:
• Enumerations will review the mylar prior to plat for address placement, street names, and title block.
• A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. An additional over the phone transaction fee of $3.50 will apply for any credit card payment. PLAT FEE FOR THIS FILING ARE $390.00
• A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. Amy@pprbd.org; (Please email the Enumerations staff that reviewed your project)
*New standard comment*: All mylar reviews will be reviewed via “pdf”. The mylar will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment. If you would like an in person review, you will have to make an appointment on our website.



Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
11/17/2021 4:03:51 PM
US Postal Service
11/17/2021 12:37:47 PM
Standard Comments for Post Office:
Contact Kevin Orlowitz – kevin.s.ortowitz@usps.gov/719-749-2958 to review development for mail service if needed.
Confirm all pad location prior to final plat or it may be disapproved due to current Postal Regulation.
11/17/2021 12:37:47 PM
View Colorado Geological Survey
11/17/2021 10:08:20 AM
11/17/2021 10:08:20 AM
View Mountain View Electric Association, Inc.
11/16/2021 3:40:12 PM
See attached comments 11/16/2021 3:40:12 PM
View El Paso County Conservation Dist
11/16/2021 10:31:05 AM
11/16/2021 10:31:05 AM
View El Paso County Conservation Dist
11/16/2021 10:30:46 AM
11/16/2021 10:30:46 AM
Black Forest Land Use Committee
11/15/2021 9:26:18 AM
The Black Forest Land Use Committee has reviewed this proposal and finds it conforms with our goals and principles. We therefore recommend approval. 11/15/2021 9:26:18 AM
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
11/12/2021 7:59:06 AM
November 12, 2021

To El Paso County through EDARP

The U.S. Fish and Wildlife Service (Service) has reviewed the documents associated with the proposed subdivision near Eastonville, CO, Latigo Trails. It would appear this project proposal is restricted to Filing No. 10, which is south of Latigo Road. If so, the Service has no concerns with this project resulting in impacts to species listed as candidate, proposed, threatened, or endangered. If this developer begins to expand project proposals north of Latigo Road in proximity of Black Squirrel Creek (Filing No. 13), they will need to consult with the Service regarding potential impacts to the Preble's meadow jumping mouse.

We appreciate your efforts to ensure the conservation of threatened and endangered species. Thank you for contacting us and please let me know if you have any further questions.

George L. San Miguel

Wildlife Biologist
Colorado Ecological Services Field Office
US Fish & Wildlife Service 134 Union Blvd., Suite 670
Lakewood, Colorado 80228
(303)236-4752
George_SanMiguel@FWS.gov
11/12/2021 7:59:06 AM
View Colorado Division of Water Resources
11/10/2021 10:14:58 AM
See attached letter. 11/10/2021 10:14:58 AM
View Colorado Parks and Wildlife
11/8/2021 10:26:14 AM
11/8/2021 10:26:14 AM
911 Authority - El Paso/Teller County
11/8/2021 7:45:33 AM
Comments for E911 as follows:

Horse Canyon Trail – Approved

Thank you
Justin
11/8/2021 7:45:33 AM
View EPC Environmental Services
11/4/2021 10:11:42 AM
11/4/2021 10:11:42 AM
Academy SD 20 Building Fund
11/1/2021 7:41:41 AM
Latigo trails Filing No. 10 is located in School District #49 not School District #20 so the district has no comment.

Don Smith
Planning Consultant
11/1/2021 7:41:41 AM
CIG Colorado Interstate Gas
10/28/2021 2:24:50 PM
Colorado Interstate Gas Company (CIG) does not have any facilities within this development and has no comments.

Thank you.
10/28/2021 2:24:50 PM
RBD Floodplain
10/28/2021 11:28:35 AM
this site in not in or near the floodplain, no comment 10/28/2021 11:28:35 AM
County Attorney - Water
10/28/2021 11:24:41 AM
County Attorney's Office will review for water sufficiency following receipt of findings from Colorado Division of Water Resources. Thank you. 10/28/2021 11:24:41 AM