6/22/2023 1:36:16 PM
|
Submission request sent to Applicant
|
6/6/2023 2:15:34 PM
|
Project Closed
|
6/6/2023 2:15:34 PM
|
Project Approved: 6/6/2023
|
6/5/2023 9:26:56 AM
|
Project Ready for Approval requests. Review Comment period is complete.
|
5/18/2023 2:51:26 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/9/2023 7:38:21 AM
|
Submission Triaged
|
5/8/2023 11:22:14 AM
|
Submission received from Applicant
|
5/5/2023 8:45:08 AM
|
Submission request sent to Applicant
|
5/5/2023 8:40:22 AM
|
Request for Review Comments returned by PCD Project Manager
|
4/27/2023 9:10:12 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Lori Seago on behalf of County Attorney - Development Review
|
4/27/2023 9:10:11 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kylie Bagley on behalf of PCD Project Manager
|
4/27/2023 9:08:43 AM
|
Submission Triaged
|
4/26/2023 4:58:21 PM
|
Submission received from Applicant
|
4/26/2023 3:10:29 PM
|
Submission request sent to Applicant
|
4/25/2023 7:31:28 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
4/14/2023 10:57:19 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Lori Seago on behalf of County Attorney - Development Review
|
4/14/2023 10:47:48 AM
|
Submission Triaged
|
4/13/2023 10:36:53 AM
|
Submission received from Applicant
|
4/11/2023 10:21:39 AM
|
Submission request sent to Applicant
|
4/6/2023 3:32:51 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
3/24/2023 8:45:26 AM
|
Request for Review Comments sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Lori Seago on behalf of County Attorney - Development Review
|
3/24/2023 8:41:40 AM
|
Submission Triaged
|
3/23/2023 12:39:43 PM
|
Submission received from Applicant
|
3/1/2023 9:41:03 AM
|
Project Manager Assigned: Kylie Bagley
|
1/19/2023 7:51:54 AM
|
Submission request sent to Applicant
|
1/19/2023 7:51:42 AM
|
Submission Triaged
|
1/18/2023 1:29:47 PM
|
Submission received from Applicant
|
1/10/2023 3:56:06 PM
|
Submission request sent to Applicant
|
1/10/2023 3:49:01 PM
|
Submission request sent to Applicant
|
1/10/2023 1:36:08 PM
|
Request for Review Comments returned by County Attorney - Development Review
|
1/5/2023 1:53:27 PM
|
Request for Review Comments returned by County Attorney - Water
|
12/20/2022 4:13:52 PM
|
Submission request sent to Applicant
|
12/20/2022 4:13:39 PM
|
Submission request sent to Applicant
|
12/20/2022 4:13:11 PM
|
Set Applicant to DREXEL, BARRELL & CO.
|
12/20/2022 7:39:45 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/20/2022 7:35:29 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kari Parsons on behalf of PCD Project Manager
|
12/20/2022 7:33:36 AM
|
Submission request sent to Applicant
|
12/14/2022 3:57:11 PM
|
Request for Review Comments returned by PCD Engineering Division
|
12/14/2022 9:46:34 AM
|
Request for Review Comments email resent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kari Parsons on behalf of PCD Project Manager
|
12/14/2022 9:45:06 AM
|
Request for Review Comments returned by PCD Project Manager
|
12/8/2022 12:59:40 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/8/2022 12:21:02 PM
|
Request for Review Comments email resent for Project Latigo Trails Filing No Nine-9 (2021) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/6/2022 5:38:14 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
12/5/2022 4:08:32 PM
|
Project Manager Assigned: Kari Parsons
|
12/2/2022 11:12:49 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
12/2/2022 11:12:46 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Edi Anderson on behalf of County Attorney - Water
|
12/2/2022 11:12:45 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Lori Seago on behalf of County Attorney - Development Review
|
12/2/2022 11:12:43 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kylie Bagley on behalf of PCD Project Manager
|
12/2/2022 11:12:41 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
12/2/2022 11:09:43 AM
|
Submission Triaged
|
12/1/2022 2:24:53 PM
|
Submission received from Applicant
|
10/18/2022 3:56:20 PM
|
Submission request sent to Applicant
|
10/18/2022 3:55:40 PM
|
Request for Review Comments returned by PCD Project Manager
|
10/18/2022 1:39:48 PM
|
Request for Review Comments returned by PCD Engineering Division
|
9/29/2022 6:30:23 PM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
9/29/2022 11:21:24 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
9/28/2022 11:25:07 AM
|
Request for Review Comments returned by County Attorney - Water
|
9/28/2022 10:31:56 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
9/28/2022 10:31:54 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Edi Anderson on behalf of County Attorney - Water
|
9/28/2022 10:27:20 AM
|
Submission Triaged
|
9/28/2022 9:33:36 AM
|
Submission received from Applicant
|
9/27/2022 10:43:06 AM
|
Submission request sent to Applicant
|
9/27/2022 7:53:26 AM
|
Submission request sent to Applicant
|
9/23/2022 3:56:51 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
9/23/2022 3:45:08 PM
|
Request for Review Comments returned by County Attorney - Water
|
9/23/2022 9:19:04 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
9/23/2022 9:19:02 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Edi Anderson on behalf of County Attorney - Water
|
9/23/2022 9:19:01 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Lori Seago on behalf of County Attorney - Development Review
|
9/23/2022 9:18:58 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kylie Bagley on behalf of PCD Project Manager
|
9/23/2022 9:18:56 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
9/23/2022 9:01:16 AM
|
Submission Triaged
|
9/22/2022 4:11:51 PM
|
Submission received from Applicant
|
8/19/2022 6:10:19 PM
|
Request for Review Comments returned by EPC Health Department
|
8/16/2022 9:57:20 AM
|
Submission request sent to Applicant
|
8/16/2022 9:56:47 AM
|
Request for Review Comments returned by PCD Project Manager
|
8/16/2022 9:55:12 AM
|
Request for Review Comments email resent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kylie Bagley on behalf of PCD Project Manager
|
8/2/2022 3:26:08 PM
|
Request for Review Comments returned by PCD Engineering Division
|
8/2/2022 2:07:23 PM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
7/29/2022 2:22:20 PM
|
Request for Review Comments returned by Parks Advisory Board
|
7/29/2022 1:51:27 PM
|
Request for Review Comments returned by EPC Parks Department
|
7/26/2022 3:30:02 PM
|
Request for Review Comments returned by PCD Project Manager
|
7/26/2022 11:15:02 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
7/22/2022 4:14:17 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
7/22/2022 10:53:14 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
7/20/2022 8:44:50 AM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
7/19/2022 1:42:01 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
7/19/2022 10:26:32 AM
|
Request for Review Comments returned by Meridian Ranch/Meridian Service Metro Dist.
|
7/19/2022 8:43:05 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
7/18/2022 12:56:05 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
7/13/2022 4:29:37 PM
|
Project Manager Assigned: Kylie Bagley
|
7/13/2022 1:32:08 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
7/12/2022 4:11:33 PM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
7/11/2022 10:33:39 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
7/11/2022 9:52:21 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
7/9/2022 1:17:17 PM
|
Request for Review Comments returned by US Postal Service
|
7/7/2022 10:55:17 AM
|
Request for Review Comments returned by EPC Environmental Services
|
7/7/2022 10:01:29 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
7/6/2022 6:37:17 PM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
7/6/2022 4:28:26 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/6/2022 8:22:39 AM
|
Request for Review Comments returned by County Attorney - Water
|
7/6/2022 6:15:44 AM
|
Request for Review Comments returned by RBD Floodplain
|
7/5/2022 3:49:06 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
7/5/2022 3:49:04 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by General Email on behalf of Mountain View Electric Association, Inc.
|
7/5/2022 3:49:03 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
7/5/2022 3:49:01 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
7/5/2022 3:49:00 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Melissa Andrews on behalf of Falcon School District 49
|
7/5/2022 3:48:59 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
7/5/2022 3:48:57 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
7/5/2022 3:48:56 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
7/5/2022 3:48:55 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
7/5/2022 3:48:54 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
7/5/2022 3:48:53 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
7/5/2022 3:48:52 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
7/5/2022 3:48:51 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
7/5/2022 3:48:50 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
7/5/2022 3:48:48 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Keith Curtis on behalf of RBD Floodplain
|
7/5/2022 3:48:47 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
7/5/2022 3:48:46 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
7/5/2022 3:48:45 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Elaine Kelly on behalf of US Postal Service
|
7/5/2022 3:48:44 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
7/5/2022 3:48:42 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
7/5/2022 3:48:39 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
7/5/2022 3:48:38 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
7/5/2022 3:48:37 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by on behalf of Parks Advisory Board
|
7/5/2022 3:48:35 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
7/5/2022 3:48:33 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
7/5/2022 3:48:32 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
7/5/2022 3:48:28 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by on behalf of EPC Parks Department
|
7/5/2022 3:48:27 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Catherine McGarvy on behalf of EPC Health Department
|
7/5/2022 3:48:21 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kathy Andrew on behalf of EPC Environmental Services
|
7/5/2022 3:48:20 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Edi Anderson on behalf of County Attorney - Water
|
7/5/2022 3:48:20 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Lori Seago on behalf of County Attorney - Development Review
|
7/5/2022 3:48:17 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Kari Parsons on behalf of PCD Project Manager
|
7/5/2022 3:48:15 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No Nine-9 (2021) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
7/5/2022 3:41:14 PM
|
Submission Triaged
|
7/5/2022 2:57:19 PM
|
Submission received from Applicant
|
6/9/2022 7:31:07 AM
|
Submission request sent to Applicant
|
6/9/2022 7:29:45 AM
|
Submission request sent to Applicant
|
5/10/2022 8:13:45 AM
|
Request for Review Comments returned by Meridian Ranch/Meridian Service Metro Dist.
|
5/10/2022 7:54:13 AM
|
Submission request sent to Applicant
|
5/9/2022 11:39:16 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
5/9/2022 9:08:54 AM
|
Submission request sent to Applicant
|
5/9/2022 9:06:45 AM
|
Request for Review Comments returned by PCD Project Manager
|
5/5/2022 3:24:22 PM
|
Request for Review Comments returned by PCD Engineering Division
|
4/26/2022 12:09:08 PM
|
Request for Review Comments sent for Project Latigo Trails Filing No 10 (2021) for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
4/12/2022 12:45:06 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Melissa Andrews on behalf of Falcon School District 49
|
4/12/2022 12:45:05 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Lori Seago on behalf of County Attorney - Development Review
|
4/12/2022 12:45:01 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Kari Parsons on behalf of PCD Project Manager
|
4/12/2022 12:44:59 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
4/12/2022 12:43:03 PM
|
Submission Triaged
|
4/12/2022 10:31:20 AM
|
Project Manager Assigned: Kari Parsons
|
4/12/2022 9:36:41 AM
|
Submission received from Applicant
|
2/16/2022 11:12:13 AM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
1/27/2022 4:16:28 PM
|
Request for Review Comments returned by Meridian Ranch/Meridian Service Metro Dist.
|
1/27/2022 9:44:40 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by General Email on behalf of Mountain View Electric Association, Inc.
|
1/25/2022 11:12:31 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Jim Nikkel on behalf of Meridian Ranch/Meridian Service Metro Dist.
|
1/4/2022 3:41:20 PM
|
Project Manager Assigned: John Green
|
12/10/2021 2:31:18 PM
|
Request for Review Comments returned by EPC Health Department
|
12/8/2021 3:44:35 PM
|
Request for Review Comments returned by Parks Advisory Board
|
12/7/2021 5:07:01 PM
|
Submission request sent to Applicant
|
12/7/2021 5:05:14 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/7/2021 5:04:41 PM
|
Request for Review Comments email resent for Project Latigo Trails Filing No 10 (2021) for review by Mercedes Rivas on behalf of PCD Project Manager
|
12/7/2021 4:36:37 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/7/2021 3:27:58 PM
|
Request for Review Comments email resent for Project Latigo Trails Filing No 10 (2021) for review by Mercedes Rivas on behalf of PCD Project Manager
|
12/7/2021 3:00:36 PM
|
Submission request sent to Applicant
|
12/7/2021 2:56:25 PM
|
Request for Review Comments returned by PCD Project Manager
|
12/7/2021 2:46:14 PM
|
Request for Review Comments email resent for Project Latigo Trails Filing No 10 (2021) for review by Mercedes Rivas on behalf of PCD Project Manager
|
12/7/2021 9:15:25 AM
|
Request for Review Comments returned by PCD Engineering Division
|
12/3/2021 10:14:28 AM
|
Request for Review Comments returned by County Attorney - Development Review
|
12/2/2021 10:52:42 AM
|
Request for Review Comments returned by PCD Project Manager
|
11/29/2021 6:36:52 PM
|
Request for Review Comments returned by Upper Black Squirrel Creek GWMD
|
11/22/2021 4:13:42 PM
|
Request for Review Comments returned by EPC Parks Department
|
11/22/2021 2:24:46 PM
|
Request for Review Comments returned by EPC Stormwater Review
|
11/19/2021 9:28:08 AM
|
Request for Review Comments returned by Black Forest Fire Protection District
|
11/17/2021 4:21:10 PM
|
Request for Review Comments returned by Colorado Springs Airport Advisory Commission
|
11/17/2021 4:04:54 PM
|
Request for Review Comments returned by Pikes Peak Regional Building Department
|
11/17/2021 12:37:58 PM
|
Request for Review Comments returned by US Postal Service
|
11/17/2021 10:10:59 AM
|
Request for Review Comments returned by Colorado Geological Survey
|
11/16/2021 3:40:37 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/16/2021 3:33:52 PM
|
Request for Review Comments email resent for Project Latigo Trails Filing No 10 (2021) for review by General Email on behalf of Mountain View Electric Association, Inc.
|
11/16/2021 12:01:00 PM
|
Request for Review Comments returned by Mountain View Electric Association, Inc.
|
11/16/2021 10:31:13 AM
|
Request for Review Comments returned by El Paso County Conservation Dist
|
11/15/2021 9:26:28 AM
|
Request for Review Comments returned by Black Forest Land Use Committee
|
11/12/2021 7:59:17 AM
|
Request for Review Comments returned by US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
11/10/2021 1:26:29 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Mercedes Rivas on behalf of PCD Project Manager
|
11/10/2021 1:26:25 PM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
11/10/2021 11:04:32 AM
|
Project Manager Assigned: Mercedes Rivas
|
11/10/2021 10:15:04 AM
|
Request for Review Comments returned by Colorado Division of Water Resources
|
11/10/2021 10:06:19 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by George San Miguel on behalf of US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
|
11/8/2021 10:26:30 AM
|
Request for Review Comments returned by Colorado Parks and Wildlife
|
11/8/2021 7:46:03 AM
|
Request for Review Comments returned by 911 Authority - El Paso/Teller County
|
11/4/2021 10:12:05 AM
|
Request for Review Comments returned by EPC Environmental Services
|
11/1/2021 7:41:49 AM
|
Request for Review Comments returned by Academy SD 20 Building Fund
|
10/28/2021 2:25:06 PM
|
Request for Review Comments returned by CIG Colorado Interstate Gas
|
10/28/2021 11:28:52 AM
|
Request for Review Comments returned by RBD Floodplain
|
10/28/2021 11:24:52 AM
|
Request for Review Comments returned by County Attorney - Water
|
10/28/2021 10:53:21 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by John Lewis on behalf of Northern EPC Coalition of Community Organizations, Inc. (NEPCO)(to also include the TLLU areas)
|
10/28/2021 10:53:19 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by General Email on behalf of Mountain View Electric Association, Inc.
|
10/28/2021 10:53:17 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Roger Austin on behalf of Mountain Metro Transit (City of COS)
|
10/28/2021 10:53:15 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Melissa Andrews on behalf of Falcon School District 49
|
10/28/2021 10:53:13 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by District Manager Pamela Davison on behalf of El Paso County Conservation Dist
|
10/28/2021 10:53:11 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Kristine Andrews on behalf of Colorado Springs Airport Advisory Commission
|
10/28/2021 10:53:09 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Clara Lucero on behalf of CIG Colorado Interstate Gas
|
10/28/2021 10:53:07 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Joe Valdez on behalf of Black Hills Energy-Aquila
|
10/28/2021 10:53:02 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Cheryl Pixley on behalf of Black Forest Trails Association
|
10/28/2021 10:53:00 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Terry Stokka on behalf of Black Forest Land Use Committee
|
10/28/2021 10:52:58 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Deputy Chief James Rebitski on behalf of Black Forest Fire Protection District
|
10/28/2021 10:52:56 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Plannig Consultant Donald Smith on behalf of Academy SD 20 Building Fund
|
10/28/2021 10:52:54 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Office Mgr Tracy Doran on behalf of Upper Black Squirrel Creek GWMD
|
10/28/2021 10:52:52 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Keith Curtis on behalf of RBD Floodplain
|
10/28/2021 10:52:50 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by RBD Enumerations on behalf of Pikes Peak Regional Building Department
|
10/28/2021 10:52:48 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by GIS Technician Justin Annan on behalf of 911 Authority - El Paso/Teller County
|
10/28/2021 10:52:46 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Elaine Kelly on behalf of US Postal Service
|
10/28/2021 10:52:43 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Tim Kroening on behalf of Colorado Parks and Wildlife
|
10/28/2021 10:52:38 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Colorado Geological Survey on behalf of Colorado Geological Survey
|
10/28/2021 10:52:35 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Joanna Williams on behalf of Colorado Division of Water Resources
|
10/28/2021 10:52:33 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by on behalf of Parks Advisory Board
|
10/28/2021 10:52:31 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Stormwater Manager Steve Jacobsen on behalf of EPC Stormwater Review
|
10/28/2021 10:52:25 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Commander John Padgett on behalf of EPC Sheriff's Department
|
10/28/2021 10:52:23 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Jennifer Irvine on behalf of EPC Public Works, County Engineer
|
10/28/2021 10:52:20 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by on behalf of EPC Parks Department
|
10/28/2021 10:52:18 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Catherine McGarvy on behalf of EPC Health Department
|
10/28/2021 10:52:03 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Kathy Andrew on behalf of EPC Environmental Services
|
10/28/2021 10:52:01 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Edi Anderson on behalf of County Attorney - Water
|
10/28/2021 10:51:59 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Lori Seago on behalf of County Attorney - Development Review
|
10/28/2021 10:51:53 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Kari Parsons on behalf of PCD Project Manager
|
10/28/2021 10:51:51 AM
|
Request for Review Comments email sent for Project Latigo Trails Filing No 10 (2021) for review by Elizabeth Nijkamp on behalf of PCD Engineering Division
|
10/27/2021 4:25:33 PM
|
Fees paid: 10/27/2021 (Receipt: 1005318)
|
10/25/2021 7:00:27 AM
|
Payment Request sent: 10/25/2021
|
10/25/2021 7:00:27 AM
|
File # Assigned: SF2136
|
10/25/2021 7:00:16 AM
|
Submission Triaged
|
10/22/2021 3:00:32 PM
|
Submission received from Applicant
|
10/18/2021 8:46:56 AM
|
Submission request sent to Applicant
|
10/18/2021 8:46:44 AM
|
Submission Triaged
|
10/14/2021 9:36:29 AM
|
Submission received from Applicant
|
8/3/2021 3:52:13 PM
|
Submission request sent to Applicant
|
8/3/2021 3:46:11 PM
|
Project Manager Assigned: Kari Parsons
|
8/3/2021 3:46:11 PM
|
EA Assigned: EA20184
|
8/3/2021 3:46:11 PM
|
Project Created
|