View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
2/12/2023 9:33:35 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following documents: - As Built Drawings Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
2/12/2023 9:33:35 AM |