Project Review Comments

Back to List


Project Name
CDR Sterling Ranch Road bridge Sandcreek Channel
Description
Construction Drawings for Sterling Ranch Road crossing Sandcreek Channel
Location
Applicant
Classic Consulting Engineers & Surveyors, LLC
PM Marc Whorton ( mwhorton@classicconsulting.net )
(719) 492-1220
PM Marc Whorton ( mwhorton@classicconsulting.net )
(719) 492-1220
File Number
CDR226
Project Manager
Kari Parsons
Status
Closed
Created
3/19/2021 12:43:54 PM

View: Project Documents



Review Comments (46)

Link Agency Comment
PCD Engineering Division
1/4/2023 4:23:04 PM
See previous comment letter for reference.

All engineering documents have been forwarded for ECM Administrator's approval/acceptance and will be uploaded to EDARP when approved/accepted.

Bridge material design life certifications will be required prior to acceptance.

-- Jeff Rice - 719-520-7877
1/4/2023 4:23:04 PM
View PCD Engineering Division
12/14/2022 5:06:18 PM
(Contech CDs redlines) 12/14/2022 5:06:18 PM
View Traffic Review Consultant
12/14/2022 3:52:00 PM
Attached are a few comments on the drainage letter regarding riprap and scour. We agree that all other previous comments have been incorporated. We have no further comments on the bridge design or bridge construction drawings. We would like to see responses to our few comments, but do not require a full resubmittal based on these comments. 12/14/2022 3:52:00 PM
View PCD Engineering Division
12/14/2022 5:05:50 PM
See comment letter (link at left) for reference.

The following items need to be revised and resubmitted
- Contech CDs

Bridge material design life certifications will be required prior to acceptance.

-- Jeff Rice - 719-520-7877
12/14/2022 5:05:50 PM
View PCD Engineering Division
11/15/2022 9:34:05 AM
(FAE redlines) 11/15/2022 9:34:05 AM
View PCD Engineering Division
11/15/2022 9:33:29 AM
(Guardrail CDs redlines) 11/15/2022 9:33:29 AM
View PCD Engineering Division
11/15/2022 9:32:51 AM
(Contech CDs redlines) 11/15/2022 9:32:51 AM
View PCD Engineering Division
11/15/2022 9:32:09 AM
(GEC redlines) 11/15/2022 9:32:09 AM
View PCD Engineering Division
11/15/2022 9:29:27 AM
(Drainage Letter redlines) 11/15/2022 9:29:27 AM
View PCD Engineering Division
11/15/2022 9:28:11 AM
See comment letter (link at left) for reference.

The following items need to be revised and resubmitted
- Drainage report
- CDs - Guardrail
- CDs - Contech
- GEC Plan
- FAE

Bridge material design life certifications will be required prior to acceptance.

-- Jeff Rice - 719-520-7877
11/15/2022 9:28:11 AM
View EPC Stormwater Review
11/6/2022 7:43:55 AM
SWMP 11/6/2022 7:43:55 AM
EPC Stormwater Review
11/6/2022 7:43:05 AM
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- SWMP

EPC Stormwater comments have been resolved on the following documents:
- GEC Plan

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
11/6/2022 7:43:05 AM
View PCD Engineering Division
9/7/2022 12:08:52 PM
(ESQCP redlines) 9/7/2022 12:08:52 PM
View PCD Engineering Division
9/7/2022 12:08:29 PM
(PBMP Applicability Form redlines) 9/7/2022 12:08:29 PM
View PCD Engineering Division
9/7/2022 12:07:47 PM
(FAE redlines) 9/7/2022 12:07:47 PM
View PCD Engineering Division
9/7/2022 12:07:21 PM
(GEC redlines) 9/7/2022 12:07:21 PM
View PCD Engineering Division
9/7/2022 12:06:42 PM
(Drainage Letter redlines) 9/7/2022 12:06:42 PM
View PCD Engineering Division
9/7/2022 12:00:21 PM
(Bridge Design Report redlines) 9/7/2022 12:00:21 PM
View PCD Engineering Division
9/7/2022 11:59:22 AM
(LOI redlines) 9/7/2022 11:59:22 AM
EPC Stormwater Review
9/6/2022 5:26:42 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- GEC Plan...(to be uploaded by PCD)

Unresolved comment: please provide the following documents on resubmittal:
- SWMP
- SWMP Checklist

EPC Stormwater comments have been resolved on the following documents:
- Drainage Letter
- FAE
- GEC Checklist

Sign/stamp and resubmit the following document:
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
9/6/2022 5:26:42 PM
PCD Project Manager
9/6/2022 11:33:08 AM
Engineering will upload their comments shortly. 9/6/2022 11:33:08 AM
View PCD Engineering Division
9/7/2022 11:56:36 AM
See comment letter (link at left) for reference.

A comment matrix spreadsheet for on-call consultant comments will be emailed separately.

The following items need to be revised and resubmitted
- Letter of Intent
- Bridge design report
- Drainage report
- CDs (guardrails, railings, etc.)
- GEC Plan
- FAE
- PBMP Applicability Form
- Comment matrix response
- Comment memo response

The following items are required prior to approval of this project:
- Project Specifications (including site/channel work and Conspan)

Bridge material design life certifications will be required prior to acceptance.

-- Jeff Rice - 719-520-7877
9/7/2022 11:56:36 AM
View Traffic Review Consultant
8/30/2022 4:20:39 PM
Most comments were addressed but this submittal is still missing the geotech report or addendum that provides the bearing pressure referenced in both the plans and bridge design report. Also missing are scour analysis and outlet protection design analysis. Please provide these items with the next submittal. 8/30/2022 4:20:39 PM
Colorado Springs Public Works
8/24/2022 9:04:42 AM
Engineering Development Review has no comments on this item.

Joel Dagnillo, P.E.
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
8/24/2022 9:04:42 AM
Colorado Springs Public Works
8/15/2022 11:14:22 AM
Traffic Engineering has no comments on this item.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
8/15/2022 11:14:22 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/11/2022 4:19:01 PM
Colorado Springs Utilities does not object to the application. If there is any conflict with our infrastructure during the consecution please call us.

Corey Masoumi, cmasoumi@csu.org
8/11/2022 4:19:01 PM
Mountain View Electric Association, Inc.
8/10/2022 2:15:41 PM
Mountain View Electric Association has existing facilities near this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. 8/10/2022 2:15:41 PM
PCD Engineering Division
6/13/2022 8:54:51 AM
No comment on the geotechnical addendum - see previous comments.

-- Jeff Rice - 719-520-7877
6/13/2022 8:54:51 AM
Traffic Review Consultant
6/9/2022 9:44:07 AM
We do not have any comments on the provided Addendum to Geotech Report. Previous comments on the bridge report, drainage letter, and construction plans will require resubmittal. 6/9/2022 9:44:07 AM
View PCD Engineering Division
6/7/2022 6:05:36 PM
(FAE redlines) 6/7/2022 6:05:36 PM
View PCD Engineering Division
6/7/2022 6:05:10 PM
(GEC redlines) 6/7/2022 6:05:10 PM
View PCD Engineering Division
6/7/2022 6:04:21 PM
(CANDE redlines) 6/7/2022 6:04:21 PM
View PCD Engineering Division
6/7/2022 6:03:49 PM
(CD redlines summary) 6/7/2022 6:03:49 PM
View PCD Engineering Division
6/7/2022 6:03:10 PM
(CD redlines) 6/7/2022 6:03:10 PM
View PCD Engineering Division
6/7/2022 6:02:07 PM
(Drainage Letter redlines) 6/7/2022 6:02:07 PM
View PCD Engineering Division
6/7/2022 6:00:04 PM
(LOI redlines) 6/7/2022 6:00:04 PM
View PCD Engineering Division
6/7/2022 5:59:10 PM
See comment letter (link at left) for reference.

A comment matrix spreadsheet for on-call consultant comments will be emailed separately.

The following items need to be revised and resubmitted
- Letter of Intent
- Bridge design report
- Drainage report
- CDs
- GEC Plan
- FAE
- PBMP Applicability Form
- Comment matrix response
- Comment memo response

The following items are required prior to approval of this project:
- Project Specifications (including site/channel work and Conspan)

Bridge material design life certifications will be required prior to acceptance.

-- Jeff Rice - 719-520-7877
6/7/2022 5:59:10 PM
Colorado Springs Public Works
6/2/2022 2:49:29 PM
Engineering Development Review has no comments on this item.

Joel Dagnillo, P.E.
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
6/2/2022 2:49:29 PM
View EPC Stormwater Review
6/1/2022 4:23:34 PM
GEC Checklist 6/1/2022 4:23:34 PM
Colorado Springs Public Works
6/1/2022 4:11:23 PM
Traffic Engineering has no comments on this item.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
6/1/2022 4:11:23 PM
View Traffic Review Consultant
6/1/2022 2:48:32 PM
See attached PDF for comments on Bridge Design Report from FHU. 6/1/2022 2:48:32 PM
View Traffic Review Consultant
6/1/2022 2:45:43 PM
See attached for comments on Construction Drawings from FHU 6/1/2022 2:45:43 PM
View Traffic Review Consultant
6/1/2022 2:43:49 PM
See attached comment form for structural and hydraulic comments from FHU. 6/1/2022 2:43:49 PM
EPC Stormwater Review
6/1/2022 4:22:59 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter......(to be uploaded by PM with PCD comments)
- FAE........................(to be uploaded by PM with PCD comments)
- GEC Plan...............(to be uploaded by PM with PCD comments)
- GEC Checklist

Please provide the following documents on resubmittal:
- ESQCP
- PBMP Applicability Form (check "Yes" for exclusion H and explain in the Notes on pg 3 how much acreage and what percentage of the site that the exclusion applies to).
- SWMP
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer II
glennreese@elpasoco.com
6/1/2022 4:22:59 PM
Mountain View Electric Association, Inc.
5/23/2022 9:24:38 AM
Mountain View Electric Association has existing facilities near this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. 5/23/2022 9:24:38 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/18/2022 4:08:21 PM
No action item is required. Any conflict with Springs Utilities infrastructures must be reported to us.
Approval can be recommended.
____________________________________________________
Corey Masoumi | Engineering Support Coordinator
Utilities Development Services | Colorado Springs Utilities
1521 S Hancock Expy Colorado Springs, CO 80903
O: 719-668-1856 | Main: 719-668-8259
cmasoumi@csu.org | www.csu.org