Project Review Comments

Back to List


Project Name
Maltese - Rolling Thunder Lot 11 PPR
Description
Commercial Site Development Plan
Location
Parcels
5311101011 5311101011
Applicant
Oliver Watts Consulting
Ollie Watts ( olliewatts@aol.com )
(719) 593-0173
Ollie Watts ( olliewatts@aol.com )
(719) 593-0173
File Number
PPR2124
Project Manager
Ashlyn Mathy
Status
Closed
Created
2/2/2021 1:11:02 PM

View: Project Documents



Review Comments (85)

Link Agency Comment
PCD Project Manager
10/17/2022 10:20:15 AM
No further comments. Project will be routed for approval 10/17/2022 10:20:15 AM
EPC Stormwater Review
10/16/2022 9:00:22 AM
All Stormwater comments have been addressed. 10/16/2022 9:00:22 AM
PCD Engineering Division
10/13/2022 6:19:41 PM
Engineering Review Ver.7

No engineer comments. Final documents have been routed for approval signature.

Thank you

Edward Schoenheit, Engineer I
E.P.C. Planning & Community Development
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
10/13/2022 6:19:41 PM
PCD Engineering Division
9/29/2022 5:16:44 PM
Engineering Review Version 6

No further engineer comments.

Thank you

Edward Schoenheit, Engineer I
E.P.C. Planning & Community Development
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
9/29/2022 5:16:44 PM
View County Attorney - Development Review
9/29/2022 4:15:17 PM
Signature to Detention Maintenance Agreement attached. 9/29/2022 4:15:17 PM
View EPC Stormwater Review
9/15/2022 4:56:47 PM
O&M_v5 9/15/2022 4:56:47 PM
View EPC Stormwater Review
9/15/2022 4:56:25 PM
GEC_v5 9/15/2022 4:56:25 PM
View EPC Stormwater Review
9/15/2022 4:55:59 PM
Drainage Report_v5 9/15/2022 4:55:59 PM
EPC Stormwater Review
9/15/2022 4:52:12 PM
Review 5: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report
- GEC Plan
- O&M Manual

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
9/15/2022 4:52:12 PM
PCD Engineering Division
9/13/2022 5:28:53 PM
Engineering Review Version 5

Traffic Impact Study Ver. 5 was corrected and accepted for approval signature.
FAE Ver. 5 was corrected and accepted for approval signature

GEC Plan Ver. 5 and Drainage Report Ver. 5 pending Stormwater comments.

Edward Schoenheit, Engineer I
E.P.C. Planning & Community Development
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
9/13/2022 5:28:53 PM
County Attorney - Development Review
9/13/2022 10:18:47 AM
Applicant's changes to the Detention Maintenance Agreement are acceptable. Please change the County signatory to Kevin Mastin, Interim Executive Director. 9/13/2022 10:18:47 AM
PCD Project Manager
9/13/2022 9:50:18 AM
Planning has no additional comments. 9/13/2022 9:50:18 AM
County Attorney - Development Review
9/7/2022 1:25:16 PM
March 3 edits to Detention Maintenance Agreement were not addressed. 9/7/2022 1:25:16 PM
View EPC Stormwater Review
7/25/2022 2:55:45 PM
GEC_v4 7/25/2022 2:55:45 PM
View EPC Stormwater Review
7/25/2022 2:55:18 PM
Drainage Report_v4 7/25/2022 2:55:18 PM
EPC Stormwater Review
7/25/2022 2:53:58 PM
Review 4: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report
- GEC Plan

Please submit the following revised documents to reflect the change in WQ treatment from SFB to PLD:
- O&M Manual
- Maintenance Agreement
- PBMP Applicability Form

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
7/25/2022 2:53:58 PM
PCD Project Manager
7/14/2022 3:14:11 PM
Planning has no further comments 7/14/2022 3:14:11 PM
County Attorney - Development Review
7/14/2022 11:01:53 AM
March 3 revisions to detention maintenance agreement remain unaddressed. 7/14/2022 11:01:53 AM
PCD Engineering Division
7/12/2022 5:31:10 PM
Engineer Review Ver.4

Please see engineer comments and redlines on the following documents. Please ensure Stormwater Engineer comments are addressed before signing final documents as indicted below. Planner to upload review documents. Please return complete documents for final PCD approval signature.

-Traffic Study-Please correct Road Impact Fee Statement on Page 8 of Ver. 3. Road Impact fees are paid to County and the County will transfer to Woodmen Road Metro per Resolution 13-041 IAW post 12/31/20 process

-Drainage Letter- Sign Ver.4

-Grading & Erosion Control Plan Ver.4 Sign document

-FAE Ver.4 Sign Form

Thank you.

Edward Schoenheit, Engineer I
E.P.C. Planning & Community Development
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
7/12/2022 5:31:10 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/20/2022 9:47:42 AM
If you have any questions about the Springs Utility gas service and design, please contact 719-668-4985. No action item is required. Approval can be recommended.
____________________________________________________
Corey Masoumi
Utilities Development Services | Colorado Springs Utilities
cmasoumi@csu.org | www.csu.org
6/20/2022 9:47:42 AM
View PCD Project Manager
4/8/2022 9:37:49 AM
Please see redline comments on SDP 4/8/2022 9:37:49 AM
View PCD Project Manager
4/8/2022 9:37:29 AM
Please see redline comments on PBMP Form 4/8/2022 9:37:29 AM
View PCD Project Manager
4/8/2022 9:37:02 AM
Please see redline comments on GEC Plan 4/8/2022 9:37:02 AM
View PCD Project Manager
4/8/2022 9:36:37 AM
Please see redline comments on FAE 4/8/2022 9:36:37 AM
View PCD Project Manager
4/8/2022 9:36:20 AM
Please see redline comments on Drainage Letter 4/8/2022 9:36:20 AM
View PCD Project Manager
4/8/2022 9:35:58 AM
Please see redline comments on Commitment Letter 4/8/2022 9:35:58 AM
View EPC Stormwater Review
3/30/2022 12:58:04 PM
PBMP_v3 3/30/2022 12:58:04 PM
PCD Project Manager
3/29/2022 7:49:32 AM
Comments to be uploaded once Stormwater has revised their comments 3/29/2022 7:49:32 AM
PCD Engineering Division
3/24/2022 11:30:07 AM
Engineer Review Ver.3

Please engineer redline comments on the following documents for correction. PCD Project Manager will upload review documents.

-Drainage Letter Ver. 3
-Grading & Erosion Control Plan Ver. 3
-Site Development Plan Ver.3

Thank you
Edward B. Schoenheit
Engineer Reviewer
El Paso County Planning & Community Development
EdwardSchoenheit@elpasoco.com
719-520-6813 (O)
719-502-9659 (C)
3/24/2022 11:30:07 AM
View EPC Stormwater Review
3/23/2022 4:52:00 PM
O&M Manual_v2 3/23/2022 4:52:00 PM
EPC Stormwater Review
3/30/2022 12:57:35 PM
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...............(to be uploaded by PM with PCD comments)
- GEC Plan.........................(to be uploaded by PM with PCD comments)
- FAE..................................(to be uploaded by PM with PCD comments)
- O&M Manual
- PBMP Applicability Form

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
3/30/2022 12:57:35 PM
Mountain View Electric Association, Inc.
3/21/2022 12:55:16 PM
See comment letter dated November 11, 2021 3/21/2022 12:55:16 PM
View County Attorney - Development Review
3/3/2022 12:51:36 PM
Proposed changes to Detention Maintenance Agreement attached. No Exhibit B to Agreement needed. 3/3/2022 12:51:36 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/1/2022 7:15:13 AM
Comments not addressed. Only the coversheet of the development plan was included. Include all sheets of the development plan and add a Utility Plan to the package (not currently included in the drawing index) showing the existing gas mains and location of the gas meter on the plan. Show the gas meter on the building elevations.

Caleb Savage
cjsavage@csu.org
3/1/2022 7:15:13 AM
View EPC Stormwater Review
11/16/2021 4:05:45 PM
GEC Checklist_v2 11/16/2021 4:05:45 PM
View EPC Stormwater Review
11/16/2021 4:05:10 PM
SWMP Checklist_v2 11/16/2021 4:05:10 PM
View EPC Stormwater Review
11/16/2021 4:04:38 PM
O&M_v2 11/16/2021 4:04:38 PM
View EPC Stormwater Review
11/16/2021 4:04:08 PM
ESQCP_v2 11/16/2021 4:04:08 PM
View EPC Stormwater Review
11/16/2021 4:03:45 PM
PBMP_v2 11/16/2021 4:03:45 PM
View PCD Project Manager
11/16/2021 3:48:13 PM
Please see redline comments on Traffic Memo 11/16/2021 3:48:13 PM
View PCD Project Manager
11/16/2021 3:47:49 PM
Please see redline comments on SDP. Condition of approval for parking will be added requiring future approval of a minor Site Development Plan once tenant is known and seeking building permit. 11/16/2021 3:47:49 PM
View PCD Project Manager
11/16/2021 3:46:50 PM
Please see redline comments on LOI 11/16/2021 3:46:50 PM
View PCD Project Manager
11/16/2021 3:46:28 PM
Please see redline comments on GEC Plan 11/16/2021 3:46:28 PM
View PCD Project Manager
11/16/2021 3:46:06 PM
Please see redline comments on GEC Checklist 11/16/2021 3:46:06 PM
View PCD Project Manager
11/16/2021 3:45:39 PM
Please see redline comments on FAE 11/16/2021 3:45:39 PM
View PCD Project Manager
11/16/2021 3:44:46 PM
Please see redline comments on ESQCP 11/16/2021 3:44:46 PM
View PCD Project Manager
11/16/2021 3:44:21 PM
Please see redline comments on Drainage Report 11/16/2021 3:44:21 PM
View PCD Project Manager
11/16/2021 3:43:54 PM
Please see redline comments on commitment letter. 11/16/2021 3:43:54 PM
PCD Engineering Division
11/15/2021 5:20:58 PM
Review 2 comments on the following documents will be uploaded by the project manager:
-Drainage Report
-Traffic Memo
-GEC Plan
-FAE
-Site Development Plan
-Letter of Intent

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
11/15/2021 5:20:58 PM
View Mountain View Electric Association, Inc.
11/11/2021 1:58:48 PM
See attached comments 11/11/2021 1:58:48 PM
EPC Stormwater Review
11/16/2021 3:58:25 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...............(to be uploaded by PM with PCD comments)
- GEC Plan.........................(to be uploaded by PM with PCD comments)
- FAE..................................(to be uploaded by PM with PCD comments)
- PBMP Applicability Form
- ESQCP
- O&M Manual
- SWMP Checklist
- GEC Checklist

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
11/16/2021 3:58:25 PM
911 Authority - El Paso/Teller County
10/28/2021 7:22:52 AM
No new street names requested on this submittal.
No action for E911.
Thank you.
Justin
10/28/2021 7:22:52 AM
View PCD Project Manager
7/22/2021 5:38:16 PM
Please see redline comments on Traffic memo 7/22/2021 5:38:16 PM
View PCD Project Manager
7/22/2021 5:37:55 PM
Please see redline comments on SWMP Checklist 7/22/2021 5:37:55 PM
View PCD Project Manager
7/22/2021 5:37:26 PM
Please see redline comments on SWMP 7/22/2021 5:37:26 PM
View PCD Project Manager
7/22/2021 5:37:01 PM
Please see redline comments on Site Development Plan 7/22/2021 5:37:01 PM
View PCD Project Manager
7/22/2021 5:36:39 PM
Please see redline comments on PBMP form 7/22/2021 5:36:39 PM
View PCD Project Manager
7/22/2021 5:36:15 PM
Please see redline comments on LOI 7/22/2021 5:36:15 PM
View PCD Project Manager
7/22/2021 5:35:56 PM
Please see redline comments on Landscape Plans 7/22/2021 5:35:56 PM
View PCD Project Manager
7/22/2021 5:35:37 PM
Please see redline comments on GEC Plan 7/22/2021 5:35:37 PM
View PCD Project Manager
7/22/2021 5:35:18 PM
Please see redline comments on GEC Checklist 7/22/2021 5:35:18 PM
View PCD Project Manager
7/22/2021 5:34:56 PM
Please see redline comments on Floor plans 7/22/2021 5:34:56 PM
View PCD Project Manager
7/22/2021 5:34:40 PM
Please see redline comments on FAE 7/22/2021 5:34:40 PM
View PCD Project Manager
7/22/2021 5:34:23 PM
Please see redline comments on ESQCP 7/22/2021 5:34:23 PM
View PCD Project Manager
8/19/2021 2:31:04 PM
Please see redline comments on Drainage Letter 8/19/2021 2:31:04 PM
View PCD Project Manager
7/22/2021 5:33:38 PM
Please see redline comments on Water Commitment Letter 7/22/2021 5:33:38 PM
PCD Engineering Division
7/20/2021 10:32:57 PM
Review 1 comments on the following documents will be uploaded by the project manager:
-Drainage Report
-Traffic Memo
-GEC Plan
-FAE
-Site Development Plan

Please also see comments from the stormwater engineer on the following documents:
-GEC Plan
-GEC Checklist
-PBMP Applicability Form
-ESQCP
-SWMP
-SWMP checklist

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
7/20/2021 10:32:57 PM
View EPC Stormwater Review
7/20/2021 10:42:33 AM
GEC_v1 7/20/2021 10:42:33 AM
View EPC Stormwater Review
7/20/2021 10:39:57 AM
PBMP_v1 7/20/2021 10:39:57 AM
View EPC Stormwater Review
7/20/2021 10:39:01 AM
SWMP_v1 7/20/2021 10:39:01 AM
View EPC Stormwater Review
7/20/2021 10:38:21 AM
SWMP Checklist_v1 7/20/2021 10:38:21 AM
View EPC Stormwater Review
7/20/2021 10:37:38 AM
GEC Checklist_v1 7/20/2021 10:37:38 AM
View EPC Stormwater Review
7/20/2021 10:36:28 AM
FAE_v1 7/20/2021 10:36:28 AM
View EPC Stormwater Review
7/20/2021 10:35:28 AM
ESQCP_v1 7/20/2021 10:35:28 AM
EPC Stormwater Review
7/20/2021 10:34:47 AM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP
- FAE
- GEC Plan
- GEC Checklist
- SWMP Checklist
- SWMP
- PBMP Applicability Form

Please provide the following documents:
- O&M for water quality control measure
- MS4 Post Construction Form
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement
- SDI

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
7/20/2021 10:34:47 AM
View EPC Parks Department
7/19/2021 2:36:02 PM
See Parks comments attached.

Greg
7/19/2021 2:36:02 PM
View PCD Project Manager
7/22/2021 5:33:09 PM
Please see redline comments on application form 7/22/2021 5:33:09 PM
Mountain View Electric Association, Inc.
7/19/2021 1:04:50 PM
Please add electrical to the Utility Plan for further review. 7/19/2021 1:04:50 PM
Pikes Peak Regional Building Department
7/15/2021 4:03:39 PM
Regarding a request for approval of a development plan for Maltese-Rolling Thunder Lot 11, Enumerations has the following comments:

1. The letter of intent states that this lot will be split by a separate plat. The northern lot can retain the use of the existing address of 10659 Maltese Pt. and an address can be assigned from Firehouse View if the applicant desires. The southern lot will be assigned and address from Firehouse View.
2. The street name of Firehouse View is incorrectly shown on the plan as Firestone View.
3. When submitting building plans for the proposed buildings, they need to show the secondary addressing for the maximum number of tenant the building could potentially hold which follows the RBD secondary addressing guidelines available on our website.
4. Once this DP is approved, submit a copy to Enumerations for address assignment to be placed on the plat.



Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
7/15/2021 4:03:39 PM
County Attorney - Development Review
7/12/2021 11:35:39 PM
Please provide a Detention Basin Agreement for the onsite water quality pond if required. 7/12/2021 11:35:39 PM
View EPC Environmental Services
6/25/2021 1:56:27 PM
6/25/2021 1:56:27 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/23/2021 4:41:02 PM
Only the coversheet of the development plan was included. Please include all sheets of the development plan and add a Utility Plan to the package (not currently included in the drawing index) showing the proposed gas service line entering the buildings and connection to the main. Show the gas meter on the building elevations.

Caleb Savage
cjsavage@csu.org
6/23/2021 4:41:02 PM
EPC Code Enforcement
6/21/2021 2:22:47 PM
No comment from Code Enforcement. 6/21/2021 2:22:47 PM
911 Authority - El Paso/Teller County
6/21/2021 11:08:05 AM
No new street names requested on this submittal.
Please note: Firestone Vw is incorrect on drawings, this should be corrected to Firehouse Vw.

No other action for E911

Thank you.
Justin
6/21/2021 11:08:05 AM
Woodmen Road Metro
6/18/2021 8:33:14 AM
This property is located within the Woodmen Road Metropolitan District or its service area.
The District assess platting and building permit fees for new development in the District and requires developed parcels to be included in the Metro District boundaries through an Inclusion process; the District assess a mill levy on property in the District.

The fees for 2020 are:
Platting Fees:
Commercial- $1540/ACRE
Residential- $385.00/LOT

Building Permit Fees:
Commercial:
Destination/hotel- $1.37/SQUARE FOOT
Convenience Commercial- $5.51/SQUARE FOOT
All Other Uses- $1.10/SQUARE FOOT
Residential-
Single Family- $550/UNIT
Multi Family- $385/UNIT
6/18/2021 8:33:14 AM