View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
10/17/2022 10:20:15 AM |
No further comments. Project will be routed for approval | 10/17/2022 10:20:15 AM | |
EPC Stormwater Review
10/16/2022 9:00:22 AM |
All Stormwater comments have been addressed. | 10/16/2022 9:00:22 AM | |
PCD Engineering Division
10/13/2022 6:19:41 PM |
Engineering Review Ver.7 No engineer comments. Final documents have been routed for approval signature. Thank you Edward Schoenheit, Engineer I E.P.C. Planning & Community Development 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
10/13/2022 6:19:41 PM | |
PCD Engineering Division
9/29/2022 5:16:44 PM |
Engineering Review Version 6 No further engineer comments. Thank you Edward Schoenheit, Engineer I E.P.C. Planning & Community Development 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
9/29/2022 5:16:44 PM | |
View |
County Attorney - Development Review
9/29/2022 4:15:17 PM |
Signature to Detention Maintenance Agreement attached. | 9/29/2022 4:15:17 PM |
View |
EPC Stormwater Review
9/15/2022 4:56:47 PM |
O&M_v5 | 9/15/2022 4:56:47 PM |
View |
EPC Stormwater Review
9/15/2022 4:56:25 PM |
GEC_v5 | 9/15/2022 4:56:25 PM |
View |
EPC Stormwater Review
9/15/2022 4:55:59 PM |
Drainage Report_v5 | 9/15/2022 4:55:59 PM |
EPC Stormwater Review
9/15/2022 4:52:12 PM |
Review 5: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - GEC Plan - O&M Manual Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
9/15/2022 4:52:12 PM | |
PCD Engineering Division
9/13/2022 5:28:53 PM |
Engineering Review Version 5 Traffic Impact Study Ver. 5 was corrected and accepted for approval signature. FAE Ver. 5 was corrected and accepted for approval signature GEC Plan Ver. 5 and Drainage Report Ver. 5 pending Stormwater comments. Edward Schoenheit, Engineer I E.P.C. Planning & Community Development 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
9/13/2022 5:28:53 PM | |
County Attorney - Development Review
9/13/2022 10:18:47 AM |
Applicant's changes to the Detention Maintenance Agreement are acceptable. Please change the County signatory to Kevin Mastin, Interim Executive Director. | 9/13/2022 10:18:47 AM | |
PCD Project Manager
9/13/2022 9:50:18 AM |
Planning has no additional comments. | 9/13/2022 9:50:18 AM | |
County Attorney - Development Review
9/7/2022 1:25:16 PM |
March 3 edits to Detention Maintenance Agreement were not addressed. | 9/7/2022 1:25:16 PM | |
View |
EPC Stormwater Review
7/25/2022 2:55:45 PM |
GEC_v4 | 7/25/2022 2:55:45 PM |
View |
EPC Stormwater Review
7/25/2022 2:55:18 PM |
Drainage Report_v4 | 7/25/2022 2:55:18 PM |
EPC Stormwater Review
7/25/2022 2:53:58 PM |
Review 4: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - GEC Plan Please submit the following revised documents to reflect the change in WQ treatment from SFB to PLD: - O&M Manual - Maintenance Agreement - PBMP Applicability Form Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
7/25/2022 2:53:58 PM | |
PCD Project Manager
7/14/2022 3:14:11 PM |
Planning has no further comments | 7/14/2022 3:14:11 PM | |
County Attorney - Development Review
7/14/2022 11:01:53 AM |
March 3 revisions to detention maintenance agreement remain unaddressed. | 7/14/2022 11:01:53 AM | |
PCD Engineering Division
7/12/2022 5:31:10 PM |
Engineer Review Ver.4 Please see engineer comments and redlines on the following documents. Please ensure Stormwater Engineer comments are addressed before signing final documents as indicted below. Planner to upload review documents. Please return complete documents for final PCD approval signature. -Traffic Study-Please correct Road Impact Fee Statement on Page 8 of Ver. 3. Road Impact fees are paid to County and the County will transfer to Woodmen Road Metro per Resolution 13-041 IAW post 12/31/20 process -Drainage Letter- Sign Ver.4 -Grading & Erosion Control Plan Ver.4 Sign document -FAE Ver.4 Sign Form Thank you. Edward Schoenheit, Engineer I E.P.C. Planning & Community Development 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
7/12/2022 5:31:10 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/20/2022 9:47:42 AM |
If you have any questions about the Springs Utility gas service and design, please contact 719-668-4985. No action item is required. Approval can be recommended. ____________________________________________________ Corey Masoumi Utilities Development Services | Colorado Springs Utilities cmasoumi@csu.org | www.csu.org |
6/20/2022 9:47:42 AM | |
View |
PCD Project Manager
4/8/2022 9:37:49 AM |
Please see redline comments on SDP | 4/8/2022 9:37:49 AM |
View |
PCD Project Manager
4/8/2022 9:37:29 AM |
Please see redline comments on PBMP Form | 4/8/2022 9:37:29 AM |
View |
PCD Project Manager
4/8/2022 9:37:02 AM |
Please see redline comments on GEC Plan | 4/8/2022 9:37:02 AM |
View |
PCD Project Manager
4/8/2022 9:36:37 AM |
Please see redline comments on FAE | 4/8/2022 9:36:37 AM |
View |
PCD Project Manager
4/8/2022 9:36:20 AM |
Please see redline comments on Drainage Letter | 4/8/2022 9:36:20 AM |
View |
PCD Project Manager
4/8/2022 9:35:58 AM |
Please see redline comments on Commitment Letter | 4/8/2022 9:35:58 AM |
View |
EPC Stormwater Review
3/30/2022 12:58:04 PM |
PBMP_v3 | 3/30/2022 12:58:04 PM |
PCD Project Manager
3/29/2022 7:49:32 AM |
Comments to be uploaded once Stormwater has revised their comments | 3/29/2022 7:49:32 AM | |
PCD Engineering Division
3/24/2022 11:30:07 AM |
Engineer Review Ver.3 Please engineer redline comments on the following documents for correction. PCD Project Manager will upload review documents. -Drainage Letter Ver. 3 -Grading & Erosion Control Plan Ver. 3 -Site Development Plan Ver.3 Thank you Edward B. Schoenheit Engineer Reviewer El Paso County Planning & Community Development EdwardSchoenheit@elpasoco.com 719-520-6813 (O) 719-502-9659 (C) |
3/24/2022 11:30:07 AM | |
View |
EPC Stormwater Review
3/23/2022 4:52:00 PM |
O&M Manual_v2 | 3/23/2022 4:52:00 PM |
EPC Stormwater Review
3/30/2022 12:57:35 PM |
Review 3: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...............(to be uploaded by PM with PCD comments) - GEC Plan.........................(to be uploaded by PM with PCD comments) - FAE..................................(to be uploaded by PM with PCD comments) - O&M Manual - PBMP Applicability Form Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
3/30/2022 12:57:35 PM | |
Mountain View Electric Association, Inc.
3/21/2022 12:55:16 PM |
See comment letter dated November 11, 2021 | 3/21/2022 12:55:16 PM | |
View |
County Attorney - Development Review
3/3/2022 12:51:36 PM |
Proposed changes to Detention Maintenance Agreement attached. No Exhibit B to Agreement needed. | 3/3/2022 12:51:36 PM |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
3/1/2022 7:15:13 AM |
Comments not addressed. Only the coversheet of the development plan was included. Include all sheets of the development plan and add a Utility Plan to the package (not currently included in the drawing index) showing the existing gas mains and location of the gas meter on the plan. Show the gas meter on the building elevations. Caleb Savage cjsavage@csu.org |
3/1/2022 7:15:13 AM | |
View |
EPC Stormwater Review
11/16/2021 4:05:45 PM |
GEC Checklist_v2 | 11/16/2021 4:05:45 PM |
View |
EPC Stormwater Review
11/16/2021 4:05:10 PM |
SWMP Checklist_v2 | 11/16/2021 4:05:10 PM |
View |
EPC Stormwater Review
11/16/2021 4:04:38 PM |
O&M_v2 | 11/16/2021 4:04:38 PM |
View |
EPC Stormwater Review
11/16/2021 4:04:08 PM |
ESQCP_v2 | 11/16/2021 4:04:08 PM |
View |
EPC Stormwater Review
11/16/2021 4:03:45 PM |
PBMP_v2 | 11/16/2021 4:03:45 PM |
View |
PCD Project Manager
11/16/2021 3:48:13 PM |
Please see redline comments on Traffic Memo | 11/16/2021 3:48:13 PM |
View |
PCD Project Manager
11/16/2021 3:47:49 PM |
Please see redline comments on SDP. Condition of approval for parking will be added requiring future approval of a minor Site Development Plan once tenant is known and seeking building permit. | 11/16/2021 3:47:49 PM |
View |
PCD Project Manager
11/16/2021 3:46:50 PM |
Please see redline comments on LOI | 11/16/2021 3:46:50 PM |
View |
PCD Project Manager
11/16/2021 3:46:28 PM |
Please see redline comments on GEC Plan | 11/16/2021 3:46:28 PM |
View |
PCD Project Manager
11/16/2021 3:46:06 PM |
Please see redline comments on GEC Checklist | 11/16/2021 3:46:06 PM |
View |
PCD Project Manager
11/16/2021 3:45:39 PM |
Please see redline comments on FAE | 11/16/2021 3:45:39 PM |
View |
PCD Project Manager
11/16/2021 3:44:46 PM |
Please see redline comments on ESQCP | 11/16/2021 3:44:46 PM |
View |
PCD Project Manager
11/16/2021 3:44:21 PM |
Please see redline comments on Drainage Report | 11/16/2021 3:44:21 PM |
View |
PCD Project Manager
11/16/2021 3:43:54 PM |
Please see redline comments on commitment letter. | 11/16/2021 3:43:54 PM |
PCD Engineering Division
11/15/2021 5:20:58 PM |
Review 2 comments on the following documents will be uploaded by the project manager: -Drainage Report -Traffic Memo -GEC Plan -FAE -Site Development Plan -Letter of Intent reviewed by: Daniel Torres danieltorres@elpasoco.com |
11/15/2021 5:20:58 PM | |
View |
Mountain View Electric Association, Inc.
11/11/2021 1:58:48 PM |
See attached comments | 11/11/2021 1:58:48 PM |
EPC Stormwater Review
11/16/2021 3:58:25 PM |
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...............(to be uploaded by PM with PCD comments) - GEC Plan.........................(to be uploaded by PM with PCD comments) - FAE..................................(to be uploaded by PM with PCD comments) - PBMP Applicability Form - ESQCP - O&M Manual - SWMP Checklist - GEC Checklist Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
11/16/2021 3:58:25 PM | |
911 Authority - El Paso/Teller County
10/28/2021 7:22:52 AM |
No new street names requested on this submittal. No action for E911. Thank you. Justin |
10/28/2021 7:22:52 AM | |
View |
PCD Project Manager
7/22/2021 5:38:16 PM |
Please see redline comments on Traffic memo | 7/22/2021 5:38:16 PM |
View |
PCD Project Manager
7/22/2021 5:37:55 PM |
Please see redline comments on SWMP Checklist | 7/22/2021 5:37:55 PM |
View |
PCD Project Manager
7/22/2021 5:37:26 PM |
Please see redline comments on SWMP | 7/22/2021 5:37:26 PM |
View |
PCD Project Manager
7/22/2021 5:37:01 PM |
Please see redline comments on Site Development Plan | 7/22/2021 5:37:01 PM |
View |
PCD Project Manager
7/22/2021 5:36:39 PM |
Please see redline comments on PBMP form | 7/22/2021 5:36:39 PM |
View |
PCD Project Manager
7/22/2021 5:36:15 PM |
Please see redline comments on LOI | 7/22/2021 5:36:15 PM |
View |
PCD Project Manager
7/22/2021 5:35:56 PM |
Please see redline comments on Landscape Plans | 7/22/2021 5:35:56 PM |
View |
PCD Project Manager
7/22/2021 5:35:37 PM |
Please see redline comments on GEC Plan | 7/22/2021 5:35:37 PM |
View |
PCD Project Manager
7/22/2021 5:35:18 PM |
Please see redline comments on GEC Checklist | 7/22/2021 5:35:18 PM |
View |
PCD Project Manager
7/22/2021 5:34:56 PM |
Please see redline comments on Floor plans | 7/22/2021 5:34:56 PM |
View |
PCD Project Manager
7/22/2021 5:34:40 PM |
Please see redline comments on FAE | 7/22/2021 5:34:40 PM |
View |
PCD Project Manager
7/22/2021 5:34:23 PM |
Please see redline comments on ESQCP | 7/22/2021 5:34:23 PM |
View |
PCD Project Manager
8/19/2021 2:31:04 PM |
Please see redline comments on Drainage Letter | 8/19/2021 2:31:04 PM |
View |
PCD Project Manager
7/22/2021 5:33:38 PM |
Please see redline comments on Water Commitment Letter | 7/22/2021 5:33:38 PM |
PCD Engineering Division
7/20/2021 10:32:57 PM |
Review 1 comments on the following documents will be uploaded by the project manager: -Drainage Report -Traffic Memo -GEC Plan -FAE -Site Development Plan Please also see comments from the stormwater engineer on the following documents: -GEC Plan -GEC Checklist -PBMP Applicability Form -ESQCP -SWMP -SWMP checklist reviewed by: Daniel Torres danieltorres@elpasoco.com |
7/20/2021 10:32:57 PM | |
View |
EPC Stormwater Review
7/20/2021 10:42:33 AM |
GEC_v1 | 7/20/2021 10:42:33 AM |
View |
EPC Stormwater Review
7/20/2021 10:39:57 AM |
PBMP_v1 | 7/20/2021 10:39:57 AM |
View |
EPC Stormwater Review
7/20/2021 10:39:01 AM |
SWMP_v1 | 7/20/2021 10:39:01 AM |
View |
EPC Stormwater Review
7/20/2021 10:38:21 AM |
SWMP Checklist_v1 | 7/20/2021 10:38:21 AM |
View |
EPC Stormwater Review
7/20/2021 10:37:38 AM |
GEC Checklist_v1 | 7/20/2021 10:37:38 AM |
View |
EPC Stormwater Review
7/20/2021 10:36:28 AM |
FAE_v1 | 7/20/2021 10:36:28 AM |
View |
EPC Stormwater Review
7/20/2021 10:35:28 AM |
ESQCP_v1 | 7/20/2021 10:35:28 AM |
EPC Stormwater Review
7/20/2021 10:34:47 AM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - ESQCP - FAE - GEC Plan - GEC Checklist - SWMP Checklist - SWMP - PBMP Applicability Form Please provide the following documents: - O&M for water quality control measure - MS4 Post Construction Form - Private Detention Basin / Stormwater Quality BMP Maintenance Agreement - SDI Reviewed by: Christina Prete, P.E. Stormwater Engineer III christinaprete@elpasoco.com |
7/20/2021 10:34:47 AM | |
View |
EPC Parks Department
7/19/2021 2:36:02 PM |
See Parks comments attached. Greg |
7/19/2021 2:36:02 PM |
View |
PCD Project Manager
7/22/2021 5:33:09 PM |
Please see redline comments on application form | 7/22/2021 5:33:09 PM |
Mountain View Electric Association, Inc.
7/19/2021 1:04:50 PM |
Please add electrical to the Utility Plan for further review. | 7/19/2021 1:04:50 PM | |
Pikes Peak Regional Building Department
7/15/2021 4:03:39 PM |
Regarding a request for approval of a development plan for Maltese-Rolling Thunder Lot 11, Enumerations has the following comments: 1. The letter of intent states that this lot will be split by a separate plat. The northern lot can retain the use of the existing address of 10659 Maltese Pt. and an address can be assigned from Firehouse View if the applicant desires. The southern lot will be assigned and address from Firehouse View. 2. The street name of Firehouse View is incorrectly shown on the plan as Firestone View. 3. When submitting building plans for the proposed buildings, they need to show the secondary addressing for the maximum number of tenant the building could potentially hold which follows the RBD secondary addressing guidelines available on our website. 4. Once this DP is approved, submit a copy to Enumerations for address assignment to be placed on the plat. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
7/15/2021 4:03:39 PM | |
County Attorney - Development Review
7/12/2021 11:35:39 PM |
Please provide a Detention Basin Agreement for the onsite water quality pond if required. | 7/12/2021 11:35:39 PM | |
View |
EPC Environmental Services
6/25/2021 1:56:27 PM |
6/25/2021 1:56:27 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/23/2021 4:41:02 PM |
Only the coversheet of the development plan was included. Please include all sheets of the development plan and add a Utility Plan to the package (not currently included in the drawing index) showing the proposed gas service line entering the buildings and connection to the main. Show the gas meter on the building elevations. Caleb Savage cjsavage@csu.org |
6/23/2021 4:41:02 PM | |
EPC Code Enforcement
6/21/2021 2:22:47 PM |
No comment from Code Enforcement. | 6/21/2021 2:22:47 PM | |
911 Authority - El Paso/Teller County
6/21/2021 11:08:05 AM |
No new street names requested on this submittal. Please note: Firestone Vw is incorrect on drawings, this should be corrected to Firehouse Vw. No other action for E911 Thank you. Justin |
6/21/2021 11:08:05 AM | |
Woodmen Road Metro
6/18/2021 8:33:14 AM |
This property is located within the Woodmen Road Metropolitan District or its service area. The District assess platting and building permit fees for new development in the District and requires developed parcels to be included in the Metro District boundaries through an Inclusion process; the District assess a mill levy on property in the District. The fees for 2020 are: Platting Fees: Commercial- $1540/ACRE Residential- $385.00/LOT Building Permit Fees: Commercial: Destination/hotel- $1.37/SQUARE FOOT Convenience Commercial- $5.51/SQUARE FOOT All Other Uses- $1.10/SQUARE FOOT Residential- Single Family- $550/UNIT Multi Family- $385/UNIT |
6/18/2021 8:33:14 AM |